Cavity Fabrication in CFF/KEK and its pressure vessel certification This information provided by Eiji Kako,for this workshop at CERN, 5 Sept., referring.

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Advertisements

Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Recent Surface Studies in KEK-STF
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION ILC08/ NAKAI HIrotaka KEK Material Property Study for High Pressure Code in KEK NAKAI Hirotaka (KEK)
Series Tests of High Gradient Single- cell Superconducting Cavity for the Establishment of KEK Recipe T. Saeki (1), F. Furuta (1), K. Saito (1), M. Ge.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
TILC09 AAP Review Lutz Lilje Global Design Effort 1 Cavity Gradient R&D.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
1 Eiji Kako (KEK) in cooperation with Japanese Industries IPAC-2010 Satellite Workshop, Kyoto, May 23, A Satellite Workshop at IPAC Superconducting.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Experimental Comparison at KEK of High Gradient Performance of Different Single Cell Superconducting Cavity Designs. F. Furuta, K. Saito, T. Saeki, H.
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
Sample tests for stain problem at KEK LCWA2009 at Albuquerque 01 Oct T. Saeki 1.
LCWS13 at Tokyo, 2013 Nov. 121Eiji Kako (KEK, Japan) Status of STF2 Input Couplers Eiji KAKO (KEK, Japan)
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Biweekly Webex Mtg (S1-G CM&Cryog.) Material study for high pressure gas regulation (revised) NAKAI Hirotaka TERASHIMA Akio (KEK)
E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
Cavity Fabrication in Pilot Plant at KEK Y. Ajima, K. Enami, H. Hayano, H. Inoue, E. Kako, S. Noguchi, T. Saeki, S. Satoh, T. Shishido, A. Terashima, N.
Industrialization Studies in the KEK Cavity Fabrication Facility (CFF) H. Hayano The 2nd workshop on SCRF Cavity Technology and Industrialization.
SCRF Monthly WebEx Meeting May 6, 2010
ILC10 Beijing Global Design Effort
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
Condition of electron beam welding toward a high gradient application
Summary of WG2: Design and Fabrication of Cavities and Cryomodules
Inspection of STF Baseline cavity #5 and #6
Status of cavity fabrication facility at KEK
Vertical Electropolishing at Marui & KEK
Activities of Cavity Fabrication Facility at KEK
Akira Yamamoto (ILC-GDE-PM/KEK)
S0 Status report from KEK
Recent results of Vertical-EP at KEK-Marui
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Material transition from He Vessel
Cost reduction activities in cavity fabrication at MHI
Charge for the Technical Board Members of the Tesla Technology Collaboration (TTC)
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
BAW Prep S1 Global Status Pilot Plant Status
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Recent VT Results in the STF-2 cavities
Vertical Test System and T-mapping/X-ray-mapping at KEK-STF
WG3: Main Linac SCRF(cavity,cryomodule)
KEK injector cryomodule
Construction and First Coo-down Test of cERL Injector Cryomodule
The S0S1 Taskforce: an Example of the Complexity for the ILC R&D Environment Lutz Lilje DESY Beijing ILC Workshop Global Design Effort.
TTC meeting, Milano Global Design Effort
Presentation transcript:

Cavity Fabrication in CFF/KEK and its pressure vessel certification This information provided by Eiji Kako,for this workshop at CERN, 5 Sept., referring a presentation given by T. Saeki et al., at the TTC meeting at Jlab, 5- 8 November, T. Saeki #A), Y. Ajima A), K. Enami A), H. Hayano A), H. Inoue A), E. Kako A), S. Kato A), S. Koike A), T. Kubo A), S. Noguchi A), M. Satoh A), M. Sawabe A), T. Shishido A), A. Terashima A), N. Toge A), K. Umemori A), K. Ueno A), K. Watanabe A), Y. Watanabe A), S. Yamaguchi A), A. Yamamoto A), Y. Yamamoto A), M. Yamanaka A), F. Yasuda B), K. Yokoya A) A) KEK, 1-1 Oho, Tsukuba-shi, Ibaraki-ken, , Japan B) The University of Tokyo, Hongo, Bunkyo-ku, Tokyo, , Japan 1

Japanese High-Pressure Gas code regulation 2 We must fabricate cavities complying with Japanese High-Pressure Gas (PHG) code if we use the cavities in cryomodule. Ti Nb NbTi We must confirm the strength of liquid-He pressure-vessel by analysis with simulation and declare the welding details of Nb cavity and Ti jacket to the authority. In addition, we must perform series of pressure tests and report the results to the authority. (Step-1)Bare 9-cell cavity ( pressure-test with water) (Step-2)Only He jacket (pressure- test with water) Design = TESLA- like KEK-type

(Step-3)9-cell cavity with welded He jacket ( Pressure-test with gas and liquid penetrant test (PT) along welding seams between cavity and He jacket) All the HPG-code process of past STF cavities had been done by the cavity vendor. But we (KEK/CFF) are trying to do the HPG process of KEK/CFF cavities by ourselves. Japanese High-Pressure Gas code regulation For realization of ILC, we need more cavity-vendors in Japan. In addition, in case of ILC in Japan, 2/3 of cavities might be imported from foreign vendors. If we (KEK/CFF) have the experience of HPG-code process, KEK/CFF can guide new and/or foreign vendors for the Japanese HPG-code process. Also if KEK/CFF controls the HPG-code process, the cavity cost might be reduced. PT