Shutdown Summer 10 4-week. Who Main Injector Duration Mike Frett/John Featherstone Remove Sand From MI40 penetrations Install when finished (PLUS) 4w.

Slides:



Advertisements
Similar presentations
Main Injector Gap clearing kickers Phil Adamson (#) AEM 14th March 2011.
Advertisements

4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
January 10, Sunday WCSLL Board Meeting – 6:30 – 8:30PM Basil Griffin Park, Education Building January 24, Sunday WCSLL Board Meeting – 7:30 – 8:30PM Basil.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Booster Corrector Upgrade October William Pellico.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
Classroom English Jeff Wang Jeff Wang Yueyang Radio and Television University.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
PIP Update Oct Agenda Summary Update – Current Activities Updates/Talks: Dave Johnson – Linac Notching (laser)
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Refurbished Booster RF John Reid October 24, 2012.
TD Help for Shutdown 2012 Preliminary, will be updated April 18, 2012.
F All Experimenters' Mtg - 03 Mar 03 Week in Review: 02/24/03 –03/02/03 Ron Moore – FNAL Store Summary / What went wrong Tev Studies Highlights Tev Ground.
F All Experimenters' Mtg - 27 Jan 03 Week in Review: 01/20/03 -01/26/03 Ron Moore – FNAL Found obstacle in AP-1 line Replacing corroded Tevatron dipole.
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
F Booster Long Straight Corrector Package Installation Craig Drennan 2007 Shutdown Planning Meeting April 6, 2007.
Friday July 27, 2007 Page 1 Shutdown 2007 ES&H Enclosure Access  Linac Remains Operational until August 13 th  Booster RWP’s and enclosure access keys.
Friday April 7, 2006 J. Anderson Jr. Page 1 ES&H Safety System Upgrades  Data Acquisition System 95% Complete 16 of 17 Linux Ethernet Port Replicator.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Booster L12/Noker-L13/Absorber Update PIP Update Talk August 15, 2012 Salah Chaurize.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
TD Help for Shutdown 2015 Preliminary, will be updated July 6, 2015 – October 5, 2015.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
F Monitor of Beam in the Abort Gap Randy Thurman-Keup DOE Review of Tevatron Operations at FNAL March 29-31, 2005 a.k.a. Abort Gap Integrator (AGI)
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
Friday July 16, 2010 John Anderson Page 1 Shutdown 2010 ES&H Enclosure Access  Linac Remains on enclosure interlock key series. RWP’s in.
March 7 th Shutdown Shutdown Begins: Monday morning, March 7 th :00 Beam OFF Safety System Testing 08:00 Rack out KRSS, switch MI house power to.
09:00 Meeting Shutdown Update June 29 th 2015 Cons Gattuso AD Shutdown Manager.
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Friday 5/1/ meeting. I wish to lock in the power outage onTuesday 5/5/09 at the end of the 0930 lab scheduling meeting speak now or :
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
Makara/Geynisman, Aug. 31, Cryo Dept. Shutdown Status.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
Why are we removing our very good gun?
Presentation transcript:

Shutdown Summer 10 4-week

Who Main Injector Duration Mike Frett/John Featherstone Remove Sand From MI40 penetrations Install when finished (PLUS) 4w John Featherstone/Mike Frett Rauchmiller Michael Moore Jack ( CT) Zolli Tim (CT) Johnson Sean Main Injector Corrosion repair (beam tubes) 4d-6d John Featherstone/Mike Frett Burk Dave Campbell Matt Chlebek Mark Folkie Jim

Who Tevatron Duration Scott McCormick Warm A3 (PLUS) 4w Scott McCormick Dymond Bill Williams James Aponte, Sabina Lambert Dan (ct) Plant Derek Greskoviak Jason Warm Straights (PLUS) 4w Scott McCormick Sylejmani Sali Jones Robert Stone Brent

Who P-Bar Duration Henry Gusler New gauges and leak check Ln2 rough vacuum 2d Henry Gusler Crabtree Phil Shaffer Earl Sellberg Greg Rehose SMA Magnets 2w Kelly Doug Samayavong Inpeng Sorenson Steve

Who Dave Augustine (ALL) Ext: 4451 Pager (630) John Featherstone (MI) Ext: 5605 Pager (630) * Taking over for Merill Albertus Scott McCormick (Tev) Ext: 3691 Pager (630) Mike Frett*(MI) Ext: 4663 Pager (630) Henry Gusler Ext: 2675 Pager (630) Oliver Kiemschies (TD) Ext: 3925 Cell (630)

What MI (Team 1) (~4 weeks) Install lead blankets at MI40 kickers Leak check flourinert side of MI40 kickers Remove Sand from MI40 penetrations; install when finished Install shield Wall 307 Remove lead blankets from MI40 kickers MI (Team 2) (4-6 days) Corrosion repair; Replace beam tube clamps on the MI Beam tube ring wide. Some areas will be hot. Buff off any rust on beam tube

What PBar (Team 1) New Gauges and Leak Check LN2 rough vacuum (2 days) Pbar (Team 2) Rehose SMA Magnets (~2 weeks) Tev Talk to Scott A1 warm up and repair cold leaks, F1 warm up only if time allows. E0: Install V-Goniometer, repair leaky bellows and install Pixel detector. E11- replace flying wire, E17 replace flying wire, B48 install e-cloud detector, A0 TEL2 install new beam screen and F sector has 2 turbo 151 installations

Where Usually keys are given out in MCR (Tev may get from Scott early) There WILL be permanent shutdown keys (i.e. keys that you don’t have to turn in at the end of the day) for most You will be given a card by a task master with which to get a key with.

Location of the MCR

Layout of MCR <- Keys <- TeV LOTO MI & Booster LOTO -> <- NuMI LOTO Usually RWP’s are next where keys are. At the beginning of this shutdown, the RWP’s will be in the room next to the MCR, along with RSO’s

LOTO

When Day 0 (Sunday, July 18th) Tev – We are setting up a meeting with Scott McCormick Thursday or Friday to work out details Day 1 (Monday, July 19th) Everyone Else. No access until 8am Some people may be shuffled as jobs complete

Why We will try to have separate job & task numbers for tunnel jobs ( AD Pays for OT (see me for the task number) Still working on approval process (doesn’t sound like you’ll have to “hand” a sheet to anyone though)

Good Luck! Stay Safe! This presentation can be found at: