Chapter 22 Lighting Design Process: Design Phases 1.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Headquarters 565 Electric Road, Salem, VA TEL (540) FAX (540) California Office 8665 Argent.
References: Ballast, D. K. (2002). Interior Construction and Detailing for Designers and Architects. Belmont: Professional Publications, Inc Reznikoff,
Ceilings and Stairs RCPs good place for building systems coordination More three-dimensional variety than plans Coordinate vertical elements like elevators.
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
Programming Dream Environment Identify Goals Listen & Learn Heritage Perception Image Future Challenges Restraints Budget Process Workflow Culture Executive.
Commercial Building Project Portfolio
Scale Modelling in Architectural Design B. de Vries.
ES305: Virtual Tools in Engineering Design: The Eng. Design Process James Carroll, Associate Professor Electrical and Computer Engineering.
New Jersey Center for Science, Technology, and Mathematics Education John P. Mulhern November 21, 2008 Schematic Presentation.
Graphic Language of Buildings Architectural Plans.
Phone / Fax: (O) CHCADDOUTSOURCING CONCEPT TO COMMISIONING, NESTING FUTURE …………………
3 interior planning + design conference room
Interior Construction
Chapter 1 An Introduction to Graphical Communication in Engineering.
Schematic Design Proposal Dan Rusnack 11/14/03 Lighting/Electrical option Thesis project The Hall Corporate Headquarters.
FLUORESCENT LUMINAIRES Fluorescent Luminaires U.S. Department of Energy Rebuild America Business Partners And Lithonia Lighting.
SketchUp METC Wednesday, February 13, Cost Free SketchUp download Professional student version $49 per year Free Professional version for educators.
Id 240 interior design iI.
Schematic Design Developing a Design Plan The major difference between an untrained designer and a skilled expert is the expert depends upon a “flow chart”
Chapter 2 Introduction to Construction Procedures
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Developing Commercial Design Plan Micah Rooke Georgia CTAE Resource Network 2010.
CHAPTER 3 Resolution and Design. Predesign Phase Programming –Functions to: Guide Inform Inspire the project designer –Not a ‘grocery list’ –Not a ‘wish.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Arlington National Cemetery Renovation Show Building Overview Picture My name Date.
ID 308 Construction + Materials IV: Construction Documents Prof. Brody Endicott College Systems Coordination.
Lighting Systems: Electrical Sources Chapter 3 Part 2 © 2006 Fairchild Publications, Inc.
Chapter 7 Lighting Controls © 2006 Fairchild Publications, Inc.
code calculations, construction drawings
ID Media IV Fall 2012 Introduction. Course Description Advanced communication skills are developed through three-dimensional presentations employing.
Chapter 8 Quantity of Lighting © 2006 Fairchild Publications, Inc.
Fall 2014 Wednesdays and Friday 8:00 am - 9:50 am VPAC 210 Office: VPAC 215Phone: Office hours: By.
ID 307 Construction + Materials III: Lighting Prof. Brody Endicott College Fall 2012 Custom Luminaires.
What are they? How can I do them too? Construction + Materials IV: Construction Documents.
A few different things… ID 206 construction + materials II.
Drawing structure Strategies for compelling images 1.
ID Media IV Introduction. Review the syllabus Goals of the course Structure of semester and classes Projects and grading Schedule.
LIGHTING LAYERS DIAGRAMS. individual layers might be… Focal – vertical surfaces and objects Task- specific activities Daylight- may provide any role Decorative.
ID 475 compositing. identify a style you like deconstruction composition: perspective composition: perspective lighting lighting materials materials.
Allowances, Unit Prices, and Alternates ACT
Custom luminaire design sketch test construct document © 2006 Fairchild Publications, Inc.
North Hills Junior High School Schematic Lighting Design
RESIDENTIAL: ________________________________________________________________________________ Category: Please select the category that best describes.
Three steps to happy renderings Strategies for compelling images 1.
ID 475 render process diagram. big picture audience: what will communicate best audience: what will communicate best spirit of the project: express the.
Construction + Materials IV: Construction Documents What are they? How can I do them too?
Retail project charette Project is already designed! One class Hand or electronic Submit electonically 1.
Circuit Design Circuit Design Gateway To Technology®
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 UNIT 6 Fields, Careers, Work Skills.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
Final half of the semester Putting theory into practice 1.
The AstroPower Headquarters Newark, Delaware
Design V Prof. Jill Bouratoglou
Architecture, Civil Engineer, and Interior Designer
INTARC29 Computer Skills For Interior Architectural Design
Commercial Building Project Portfolio
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
The project's conception: A feasibility study is done
Client Requirements (review) Bubble Diagrams
….because you only want to have senioritis once
Chapter 3 Resolution and Design.
Creating a Design Plan Working with Clients.
Digital Tools for Interior Design
Definitions Luminance:The amount of light reflected from or transmitted through a material. Measured in candelas/ft (candelas/m ). Perceived as brightness.
SITE ANALYSIS AND SETUP.
The Design Process.
FIVE PROJECT PHASES.
Interior Design.
Presentation transcript:

Chapter 22 Lighting Design Process: Design Phases 1

Schematic Design Phase Site survey –Sketches, photos, luminance level testing, luminaire examination –Insolation studies Analysis of program –Lighting Program chart –IESNA standards –Sketches General research –Codes –Precedents –historical 2 Chapter 22 Design Phases © 2006 Fairchild Publications, Inc.

Chapter 22 Design Phases © 2006 Fairchild Publications, Inc. 3 Synthesis Combine all background information with concepts Work with other stakeholders and designers

Visualization Hand sketching SketchUp rendering Revit rendering Photoshop effects

Light distribution diagrams Study one space in your project Three different electric lighting tactics –E.g., perimeter wall wash, cove uplight, central downlighting, etc. Three different natural lighting tactics –Type and placement of window/skylight Three different combinations Render with Revit Place on board

Chapter 22 Design Phases © 2006 Fairchild Publications, Inc. 9 Design Development Phase After client’s approval of schematic design phase Detail of the project –Exact construction –Luminaire selection –Lighting schedule development Code Analysis Produce presentation renderings of final choices (or samples)

ACT meeting GWB wall

ACT hung off structure

Chapter 22 Design Phases © 2006 Fairchild Publications, Inc. 15 Construction Drawings Lamps, Luminaires, Controls Specifications and Cutsheets Prices Availability and delivery dates Material lists Construction details Installation requirements

Graphic Standards

GWB ceilings

Special conditions

Stretched ceiling

Surprise Let’s have a short quiz on Monday – on GullNet (you can use lap computers) After, we’ll go over calculations