GLAST LAT Project4.1.7 G. Haller V11 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S 4.1.7 Monthly Status 01-05-05 Gunther.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSIU MRR DAQ & FSWV1 1 GLAST Large Area Telescope: G. Haller SLAC (650) Gamma-ray Large Area Space.
GLAST LAT ProjectLAT Mgr’s Meeting October 13, LAT Planning Meeting Mechanical/Thermal Systems October 2004 Marc Campell.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S September Status
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectOct DAQ & FSWV3 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Analysis of cPCI Backplane.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 2, Version 4 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 1, Version 3 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, DAQ & FSWV8 1 GLAST Large Area Telescope: Gunther Haller SLAC LAT Chief Electronics.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 1 GLAST Large Area Telescope: Presented by G. Haller SLAC (650)
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
GLAST Large Area Telescope:
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectPDU/GASU MRR, February 4, DAQ & FSWV3 1 GLAST Large Area Telescope: B. Estey, G. Haller, D. Marsh SLAC
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectPDU TRR, July, DAQ & FSWV4 1 GLAST Large Area Telescope: Presented by P. Young SLAC (650)
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V31 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
TRD Electronics Flight Production Wim de Boer, Kai Gassmann, Florian Hauler, Andreas Sabellek, Mike Schmanau IEKP - Universität Karlsruhe (TH)
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: Gunther Haller SLAC (650)
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project4.1.7 G. Haller V11 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther Haller (650) Gamma-ray Large Area Space Telescope

GLAST LAT Project4.1.7 G. Haller V12 Test-Stand Summary ACD test-stands: –G3 GASU which had been returned to SLAC for repair was repaired and sent back to GSFC. Cold solder joint on added wired-on circuit for FREE I/V monitoring –Added by Mike… I & T GASU upgraded to “full boat” Passed ELX tests, waiting formal acceptance

GLAST LAT Project4.1.7 G. Haller V13 ASIC All GTCC1, GCCC1 TEM ASIC’s screened –Qualification testing at GSFC: The parts have passed all of the tests to date. The GTCC and GCCC began the 1000 hr life cycle test on Dec. 15 th and completed the 168 hr room temperature test on Dec. 22nd. This test will be complete on Jan. 26th and will then require 3-temperature testing. GLTC ASIC’s (for GASU) –New test-boards were fabricated/loaded/tested –About 20 GLTC3’s were burned in/tested/no failures –10 were sent to Italy for TID –New batch of about 32 are in burn-in –Need about 35 for one complete GASU box (in baseline two enclosures are to be assembled) –Additional ~50 for GSFC qual testing to follow

GLAST LAT Project4.1.7 G. Haller V14 ACTEL UMC line FPGA’s 3 sets (one 32-1, one 72-series) were put on TEM flight boards –Flight TEM passed function/performance tests over temperature 8 more sets were programmed (for 8 more TEM’s) and are being lead-formed at Fancort for TEM assembler 2 72-series were programmed for PDU, will be lead-formed at PDU assembler

GLAST LAT Project4.1.7 G. Haller V15 TEM/TPS Schedule Qual, TWR-A, TWR-B –3 TEM/TPS were integrated in their respective enclosures & tested, passed function/performance tests, about 3.5 weeks ago –3 TPS’s were mounted onto TEM’s & tested, passed, about 3 weeks ago –Attempted vibration at GT for about 9 days, but system at GT was not operating satisfactorily to use on flight assemblies Table only vibrates in one dimension Required mounting fixture to get 3 dimension –GT designed it and it was available, but –System had issues with stabilization, looked like mounting fixture needed to be redesigned Number of sensors not sufficient Had 3 SLAC engineers helping in New-Mexico, but after a few days we gave up and decided to change plan Vibration test TEM/TPS at Wyle instead (close to SLAC, previous vib tests on EM TEM/TPS were performed there without issues) –Changed original production plan and shipped the 3 TEM/TPS assemblies to SLAC –All 3 passed incoming electrical tests at SLAC –Meanwhile: Re-run vib test with EM TEM/TPS at Wyle: M. Opie (mechanical), D. Tarkington (DAQ), –Wrote/reviewed/released test procedure for test now at Wyle No stand-offs, directly mounted via mounting plate to vib table

GLAST LAT Project4.1.7 G. Haller V16 TEM/TPS Schedule Qual, TWR-A, TWR-B (con’t) –Qual Jan 24/25: Vib-tested qualification TEM/TPS at Wyle –Jan 26 Ran test successfully Jan 28: thermal-cycle qual (together with TwrA and TwrB below) & test Jan 30: mass/ CG measurement Feb 12: start TV (12 cycles, start after TV of TwrA/TwrB for schedule reasons) Feb 28: EMI tests starting at CKC lab (EMI procedure is being drafted at CKC Lab in Fremont) Mar 16: review Performance over Temperature with CAL AFEE and TKR MCM as soon as AFEE/MCM/flex- cables are available –TwrA/Twr B Jan 25: Vib-test –Jan 27 Run test (1 day delay to re-measure mass) Jan 27: mass measurement (no CG required) Jan 28: Thermal cycle together with qual –TwrA Jan 29: Start TV Feb 4: EMI test Feb 6: review Feb 7: Deliver to I&T –TwrB Lags Twr A by one week due only to TV bottle-neck –Can one TV two TEM/TPS simultaneously? –In principle yes but it requires more TV IO connections, additional connector plate –About $12k to upgrade, suggest to do it if $ are available to accelerate future production schedule –Second test-stand is not an issue on the time-scale the 3 rd TEM/TPS is available

GLAST LAT Project4.1.7 G. Haller V17 TEM/TPS Schedule According to last slide, first FLT TEM available Feb 7, but: –Strongly Recommended: Performance test over Temperature of each FLT TEM/TSP with CAL AFEE and TKR MCM (no vacuum required) As soon as AFEE/MCM/flex-cables are available, but that test needs to be inserted in flow above 1 day for test, but required working 4 AFEE, 36? MCM’s, 8 flex- cables! When?? Flex-cables/MCM’s need to be bowed/curved since oven is not large enough for straight flex-cables (is doable) Flight production for balance of 19: –Was released first week of January –Production not started –Jan 25, had telecon with GT to make sure all lessons learned are in production documents –Jan 28: all production documents are updated and released –Jan 31: production should start at GT –Still waiting for GT’s schedule

GLAST LAT Project4.1.7 G. Haller V18 PDU PDU –Assembly contract awarded (Aeroflex) –QA and Technical Interface Meeting meetings 1/26 and 1/27 at Aeroflex –Feb 7: deliver part kits to Aeroflex (being kitted at SLAC), subsequent discrepancy resolution assembly of CCA’s –Schedule to be provided by Aeroflex at TIM: our estimate March 14: deliver first pre-coat PDU to SLAC for testing, return 1 week later April 11: deliver coated, fully assembled first PDU to SLAC May 2: Done with Vib/TC/TV/EMI –2 nd PDU lags first by about 5 weeks (after 1 st PDU passes pre-coat tests) –Old Issue: OMNIREL linear-regulator. Recalled lot which was received by SLAC. (Tantalum cap used has end-termination with pure Sn as opposed to Sn/Pb. Can’t use in space.) New delivery maybe late Feb 05. Issue with DX-priorities Testers –PDU tester is assembled, code still in progress TV testing plan –See GASU

GLAST LAT Project4.1.7 G. Haller V19 GASU & GASU-PS & PDU GASU –Same state as PDU –Schedule lags PDU by 2-3 weeks –Issue: Trigger-related FPGA’s were modified to achieve timing margins for flight- FPGA (additional pipe-line registers were added to meet (slower) flight FPGA margins) Testers –GASU tester being designed/assembled TV testing plan –Currently building 33 TV chamber can only be penetrated with small percentage of signals (~100) Upgrade to 600 pins: $21k Upgrade to 450 pins: $12k –If one wants to exercise each I/O from GASU to 24 FREE interfaces, 16 TEM’s, 5 crates, monitoring Need to design/build analog multiplexer boards to switch 1 TEM to 16 GASU TEM IO’s Plus relays to switch power to 12x2x (3.3V + 28V)= 48 FREE power connections –Engineer is currently designing system and calculating number of TV IO pins are required –Need to design/fabricate thermal construction to mount GASU/TEM/FREE in thermal chamber

GLAST LAT Project4.1.7 G. Haller V110 SIU SIU –Enclosure in fabrication, plating is imminent –Test with RAD750 flight board revealed that two mounting holes are off –Mounting brackets will be modified next week, then crate will go to plating –CPS board in and coupons passed –LCB and CPB coupons failed, boards are being refabricated, due back end of this week –SIB board going to fab next week –Decided to only load one type of SIB’s (SIU SIB’s) EPU SIB’s did not have any MIL1553 components Load all SIB’s the same, overall more cost-effective –Testers and documentation for board and crate tests to be done Issue –Austin EEPROM lot acceptance was put on hold by GSFC (used on SIB) DPA issues –GSFC sent pictures to Austin Austin responded, discussion on-going

GLAST LAT Project4.1.7 G. Haller V111 Harness/RAD750/ISIS LAT Harness –Awarded, parts need to be kitted, priority list was created RAD750 –Need to resolve heat-sink issue, will have to send boards back to BAE for rework –Issues with Omnirel regulator (need to be replaced on RAD750) Had telecon with BAE/General Dynamics/GSFC weeks delivery quoted from Omnirel to BAE ISIS acceptance test successful

GLAST LAT Project4.1.7 G. Haller V112 RAD750 Test Took RAD750 flight board and ran tests in an engineering SIU crate with –EM Crate Backplane (CBP) –EM Storage Interface Board (SIB) –EM LAT Communication Board (LCB) –EM Crate Power Supply (CPS) Main goal was LCB firm-ware/software validation (EM BAE750 has differences to RAD750, e.g. boot code is different) –Power-up/down and power-on reset ok (POR to RAD750 needs to be asserted while powering on/off, mainly because of SU-EEPROM) –Crate power-supply works with RAD750 –Power Consumption 23.5W In budget: 28W (23.5W will increase a bit due to 2 LCB/1SIB flight FPGA differences) –Programming of SU boot-code into RAD750 EEPROM successful –Primary and secondary boot of RAD750 successful –Communication with SIB successful –Communication with LCB including DMA successful –Discrete IO tests successful Remaining risk is timing over temperature with flight FPGA’s in SIB and LCB –Can only be done once qual models of those boards are available

GLAST LAT Project4.1.7 G. Haller V113 Schedule/Budget Total budget: $22,238 Work Scheduled up to date: $21,406 Work Performed: $18,865 Actuals: $22,364 Schedule Variance $-2,541k (change from last month: -2k) –Qual/Flight work should have been started, reflects current status Cost Variance: $-3,500k (change from last month: -$100k) –Detailed list was provided last year, needs CCB action