Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF CERN Computer Facilities Evolution Wayne Salter / Vincent Doré.

Slides:



Advertisements
Similar presentations
Using Ground Source Heat Pump The Avenue Centre.
Advertisements

Presented by: April Kerr and Wayne Johnston Date: June 7 th 2006 Axia NetMedia Corporation Using SuperNet for Data Communication throughout Alberta.
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
Computer Room Provision in Atlas and R89 Graham Robinson.
André Augustinus 16 June 2003 DCS Workshop Safety.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Columbia University’s Advanced Concepts Data Center Pilot June 17, 2011.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Cooling Product Positioning
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Thermal Management Solutions from APW President Systems
 Site  Requirements  Local Resources  Initial layout ideas  Brief material selection  Supply options.
Computer Room Experiences A medium sized tier-2 site view Pete Gronbech GridPP Project Manager HEPIX April 2012.
A New Building Data Center Upgrade capacity and technology step 2011 – May the 4 th– Hepix spring meeting Darmstadt (de) Pascal Trouvé (Facility Manager.
CERN IT Department CH-1211 Genève 23 Switzerland t Options for Expanding CERN’s Computing Capacity Without A New Building Medium term plans.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Business Continuity Overview Wayne Salter HEPiX April 2012.
Federal Data Center Consolidation Initiative Karen Petraska August 17, 2011.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
IT Department 29 October 2012 LHC Resources Review Board2 LHC Resources Review Boards Frédéric Hemmer IT Department Head.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Air Conditioning and Computer Centre Power Efficiency The Reality Christophe Martel Tony Cass.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Remote Hosting First Experiences Wayne Salter (with input.
CERN IT Department CH-1211 Genève 23 Switzerland t The new (remote) Tier 0 What is it, and how will it be used? The new (remote) Tier 0 What.
Transforming B513 into a Computer Centre for the LHC Era Tony Cass —
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Computer Centre Upgrade Status & Plans Post-C5, June 27 th 2003 CERN.ch.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Presentation to Portfolio Committee on Police on SAPS Communication Projects By: Mr Sithembiso Freeman Nomvalo
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
Nikhef/(SARA) tier-1 data center infrastructure
L OW E NERGY B UILDING D ESIGN A LEX N IX H AZEL E ASTON E UAN R OBERTSON A LASDAIR H OON D APHNE K OULITSA.
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
An introduction to Energy aspects at CERN June 2014.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Energy Savings in CERN’s Main Data Centre
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter HEPiX May 2011.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
CERN - IT Department CH-1211 Genève 23 Switzerland t Power and Cooling Challenges at CERN IHEPCCC Meeting April 24 th 2007 Tony Cass.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Row Cooling.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
West Cambridge Data Centre Ian Tasker Information Services.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
Dell EMC Modular Data Centers
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Update on the PSB Cooling and Ventilation Systems
CMS Centre Project - Green Light Meeting
Demineralised water cooling system
Remote Hosting Project
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
The Data Center Challenge
CERN Data Centre ‘Building 513 on the Meyrin Site’
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Remote Hosting Project
Cooling systems for HL-LHC (WP17.3)
CEDAR Detector Ventilation System Review
TEC assembly and commissioning at Lyon
Program Proposal to ITGC
Presentation transcript:

Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter / Vincent Doré HEPiX October 2011

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Overview Reminder of the various evolution projects Progress since the last HEPiX Closing remarks CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Evolution Projects Local hosting –Provide additional ‘critical power’ –Allow some level of business continuity On-going improvements of CC –Improve efficiency and resilience of cooling and monitoring systems Upgrade of current computer centre –Better secure the critical systems –Increase capacity from 2.9 to 3.5MW –Increase ‘critical power’ from 340 to 600kW –Address a number of long standing issues Large scale external hosting –Address the increasing capacity needs of CERN –Increase business continuity coverage CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Local Hosting Layout CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution - HEPiX October Current Status Of Local Hosting Agreement for 40m² (actually 36m²) and 100kW (two power feeds) 2 dark fibres on diverse paths 17 IT racks + 2 network racks 264 (up from 209) systems installed 14.5 racks used and 55kW (average power density of 4.1kW/rack) –2.5 racks remaining and 45kW! Interventions at local hosting site: –No Sys Admin interventions (3 in previous period)* –20 H/W related interventions Still dependent on networking in CC * Positive development w.r.t. large scale external hosting!

CERN IT Department CH-1211 Geneva 23 Switzerland t CF On-going Improvements - 1 Improvement of the cooling efficiency –To be able to cool more IT equipment and to save on cooling power. –Main steps already achieved: 1.Cold corridors (from 2008). 2.(More) use of outside fresh air (February 2011, net immediate gain 200kW). 3.Temperature increase of blown air in main computer room from 14C to 21C in steps of 1 C (Jan-Jul 2011) –Steps 2-3 above are estimated to save 4.7GWh/year: Assuming an arbitrary tariff of 20 ct /kWh = 0.94MCHF CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF On-going Improvements - 2 Further improvements of the cooling efficiency –Continue to increase the temperature of the air blown into main computer room (up to 22? While ensuring air < or = 27C for all IT equipment). Above 22 degrees the savings are minimal. –Increase the temperature of the Vault and possibly of some UPS rooms. Savings less because we cannot use free cooling. –Better understand and improve the air flow from the main AHUs to the servers in main computer room. –Change motors in AHU to variable speed. –Continue to improve cold air confinement where relevant. –Increase the temperature of the chilled water from 5C (6C) Basement computer and UPS rooms, as well as main computer room (when free cooling not possible). CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF On-going Improvements - 3 Improvement of the monitoring of the infrastructure of the Computer Centre –Important work already done to understand better the power flows in the CC and to store/display them... Still some work to do, in particular on the alarms/automated shutdown scripts. However, we can now see the instantaneous PUE –Work to be done to include temperatures and related alarms in Lemon. –Progressive implementation of intelligent power bars in IT racks (new IT room, end-2011 installations). Already used at Local Hosting Site Computer Center Consolidation – VD

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Goals of the CC Upgrade Project Solve the cooling issue for the critical UPS room –New UPS systems in a different location Increase critical capacity to 600kW Increase overall power capacity to 3.5MW Restore N+1 redundancy for both critical and physics UPS systems Secure cooling for critical equipment when running on UPS and extend stored cooling capacity for physics when on diesel Decouple the A/C for CC from the adjacent office building CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Power Requirements CERN Computer Facilities Evolution - HEPiX October IT Physics Equipment IT Critical Equipment Physics UPS (3/4+1) Diesel Generator (N+1) Critical UPS (3+1) 600kW 2.9MW 3.5MW Normal Network Cooling for IT Critical Equipment

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Status at Last HEPiX ‘Barn’ cleared of IT equipment end of Oct 2010 ‘Barn’ cleared of all internal structures and false floor end of 2010 Cabling and ducting removal finished end Mar 2011 Civil engineering (CE) work has just started CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Current Status - I Civil engineering –Concrete structure for new CV building complete –‘Barn’ separated from main computer room plenum –Fire protection panels installed on wall between ‘Barn’ and main computer room –Concrete reinforcement beams and columns prepared for electrical rooms in ‘Barn’ and work started on ceiling –Steel structure of new IT room in place –Cable passage between site of new transformers and HV room prepared –Major works on schedule to be completed Dec 2011 CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Presentation Title - 14

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Presentation Title - 15

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Presentation Title - 16

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Presentation Title - 17

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Presentation Title - 18

Computing Facilities

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Current Status - II Electrical –Orders placed for HV equipment, UPS systems and physics LV switchboards –Critical LV switchboards as well as CV and IT switchboards procurement in progress –HV installation in progress to be finished Jan 2012 –Physics LV installation planned Nov 2011-Jun 2012 –Critical LV installation planned May 2012-Aug 2012 –IT room electrical installation planned May Aug 2012 CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Current Status - III CV –Ventilation contract placed and detailed design studies underway –Mixed water distribution tender replies received and contract being prepared –Selection of chillers in progress –Design improvement: Physics AHUs for main computer room will be attached to the physics UPS systems CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution - HEPiX October IT Physics Equipment IT Critical Equipment Physics UPS (3/4+1) Diesel Generator (N+1) Critical UPS (3+1) 600kW 2.9MW 3.5MW Normal Network Cooling for IT Critical Equipment Cooling for IT Physics Equipment

CERN IT Department CH-1211 Geneva 23 Switzerland t CF The new IT room in the ‘Barn’ Critical IT equipment only (450kW, room designed for 480kW) Cooling of IT equipment by water-cooled racks with passive heat exchangers at the back –No power consumption –Cheap (compared to other cooling solutions) –No fan problems –No cold/hot corridors, cold room –Tendering process underway Very likely 90 racks (70cm*110cm*47u), average power density 5kW/rack CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Views of a passive rack CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Plan of the new IT room (draft) CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Some issues…. A ventilation duct in one of the UPS rooms was dislodged Water leaked into one of the UPS rooms Water leaked into the HV room Some dust got into main computer room However, no interruption of servers or damage caused! CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Large Scale External Hosting How to provide resources once CERN CC full? Option of a new CC on Prévessin site blocked Interest from member states to provide a external hosting facility Call for interest at FC June 2010 High level of interest –23+ proposals (plus more since) –Wide variation of solutions and capacity offered Follow up discussions held with all CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Since last HEPiX - I Official decision to go ahead taken and all potential bidders informed Several new consortia have expressed interest Call for tender –Specification kept as minimal as possible to avoid excluding potentially interesting solutions –Includes a defined ramp up profile for adjudication as well as an initial SLA –Sent out on 12 th Sept and replies due 7 th Nov –A number of questions for clarification have been received and answered CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Since last HEPiX - II An internal study has been conducted to see what would be required to implement BC from a networking point of view Requires a network hub to be setup independently of the CC Requires an air-conditioned room of about sqm for ~ 10 racks with 50kW of UPS power and good external fibre connectivity Several locations are being studied All future deliveries will be managed as if at a remote location CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Summary CERN CC reaching end of capacity Further improvements in CC are possible and being implemented in parallel (e.g. monitoring and cooling) –Better monitoring capabilities –Better efficiency, but –We do not get additional computing capacity from this! Three options to address providing increased capacity: –Local hosting Limited additional capacity (in place for a bit more than 1 year) –CC Upgrade to 3.5 MW Slow and expensive (to be completed September 2012) –Remote hosting Interesting but introduces new challenges But could allow us to address business continuity properly if additional measures taken (second network hub) Tendering underway CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Thank you for your attention! Questions? CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Video of Barn Works CERN Computer Facilities Evolution - HEPiX October

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Additional Slides for Interest! CERN Computer Facilities Evolution - HEPiX October

Computing Facilities CERN Computer Facilities Evolution - HEPiX October

Computing Facilities CERN Computer Facilities Evolution - HEPiX October

Computing Facilities CCERN Computer Facilities Evolution - HEPiX October

Computing Facilities CERN Computer Facilities Evolution - HEPiX October

Computing Facilities CERN Computer Facilities Evolution - HEPiX October