Beam Distribution MD Sun, 03.07.2011 10:00 to 14:00 F. Burkart R. Assmann, R. Bruce, M. Cauchi, D. Deboy, C. Derrez, L. Lari, J. Lendaro, A. Masi, S. Redaelli,

Slides:



Advertisements
Similar presentations
Combined cleaning in IR3 - MD results and simulations Adriana Rossi R.W.Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, L. Lari, S. Redaelli, G. Valentino,
Advertisements

FLUKA status and plan Sixth TLEP workshop CERN, October 2013 F. Cerutti #, A. Ferrari #, L. Lari *, A. Mereghetti # # EN Dept. & *BE Dept.
LHC Collimation Working Group – 19 December 2011 Modeling and Simulation of Beam Losses during Collimator Alignment (Preliminary Work) G. Valentino With.
Collimation MDs LHC Study Working Group Daniel Wollmann for the Collimation-Team, BLM-Team, Impedance-Team, … LHC Study Working Group,
1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Where did all the protons go? Mike Lamont LBOC 20 th January 2015.
LSWG day, Sept. 2, 2014, B. Auchmann for the BLMTWG Collaboration of many teams: OP, RF, BI, Collimation, LIBD, FLUKA, etc. T. Baer, M. Bednarek, G. Bellodi,
BIQ Workshop, September 15 Collaboration of many teams: BLM, Collimation, FLUKA, LIBD, OP, RF, etc. B. Auchmann, T. Baer, M. Bednarek, G. Bellodi, C.
The First 1 ½ Years of TOTEM Roman Pot Operation at the LHC M. Deile, G. Antchev, I. Atanassov, V. Avati, J. Baechler, K. Eggert, J. Kašpar, F. Lucas Rodriguez,
6/14/11 Collimation Upgrade Plan & Questions R. Assmann, CERN for the collimation team 14/6/2011 LHC Collimation Project Review.
SixTrack Status Speaker: R. De Maria Special thanks to: F. Schmidt, E. McIntosh, volunteers. Developers: A. Aviral, J. Barranco, D. Banfi, L.
External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
Collimation Meeting Tests on a Fully Assembled TCT Collimator in the HiRadMat Facility M. Cauchi, D. Deboy, on behalf of the Collimation Team.
Off-momentum tail scraping for passive abort gap cleaning (MD 444) D. Mirarchi, R. Bruce, S. Redaelli On behalf of the LHC Collimation Team LHC Study Working.
Beam-induced Quench Tests of LHC Magnets Beam-induced Quench Tests of LHC Magnets, B.Dehning 1 B. Auchmann, T. Baer, M. Bednarek, G. Bellodi, C. Bracco,
Stefano Redaelli, CERN, BE-ABP for the Collimation Project and HL-LHC-WP5 teams The LHC Collimation Baseline for HL-LHC 3 rd Joint HiLumi LHC-LARP Annual.
LHC Studies Working Group – 03 July 2012 Beam Scraping and Diffusion + Asynchronous Dump MD G. Valentino, R. W. Assmann, F. Burkart, L. Lari, S. Redaelli,
MD#2 Summary (R. Assmann, F. Zimmermann, G. Papotti) MD#2 Summary Report 04/07/2011 Very satisfied with second MD:  Some ground-breaking results  path.
SPS UA9 data taking run with LHC-type Goniometer 31/07/2015 – Collimation Upgrade Specification Meeting #60 Roberto Rossi Daniele Mirarchi, Stefano Redaelli,
First results of the HRMT-09 tests on a LHC TCT collimator in HiRadMat Collimation WG Meeting Oliver Aberle on behalf of the Collimation team,
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
Results of microphone tests in HiRadMat Collimation WG Meeting Daniel Deboy on behalf of the Collimation team, thanks to A. Masi, J. Lendaro,
LHC Crystal MD 22/09/2015 – LSWG #7 R. Rossi for the LHC Collimation team and the UA9 Collaboration.
LHC Collimation Working Group – 20 February 2012 Collimator Setup Software in 2012 G. Valentino R. W. Assmann, S. Redaelli and N. Sammut.
LHC Collimation Working Group – 02 April 2012 Results from Beam-Based Collimator Alignment G. Valentino, R. W. Assmann, R. Bruce, F. Burkart, M. Cauchi,
BLM update procedure: - Updated the RT software - Updated the BLETC firmware (ver _A) - Changed the firware version in the MASTER tables and generated.
Improving Collimator Setup Efficiency LHC Beam Operation Committee, G. Valentino, R.W. Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, S.
Education Thesis: Layout and design of a high accuracy magnetic field measurement system for superconducting undulators. Thesis: Phase error reduction.
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
Background studies for the ILD vertex detector Rita De Masi IPHC-Strasbourg.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Summary Session 5 Chamonix 2011, 24. – Session 5: “High Intensity: Present and Future” R. Assmann & S. Redaelli Thanks to Frank Z. for his notes…
江苏建筑职业技术学院图书馆 新生入馆教育. 目录页 CONTENTS PAGE P1. 图书馆概况 P2. 关于借书二、三事 P3. 电子资源推介与使用.
LHC Collimation Working Group Monday, 21 March 2016 Analysis of collimator BPMs in the 2015 run A.Valloni, G. Valentino with input from R. Bruce, A. Mereghetti,
How low can we go? Getting below β*=3.5m R. Bruce, R.W. Assmann Acknowledgment: T. Baer, W. Bartmann, C. Bracco, S. Fartoukh, M. Giovannozzi, B. Goddard,W.
Preliminary ANSYS Studies for Tungsten Collimators
R.W. Assmann, V. Boccone, F. Cerutti, M. Huhtinen, A. Mereghetti
Use of a Diamond BLM System in the LHC Ring
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Use of a Diamond BLM System in the LHC Ring
MD #453 Effect of low frequency noise
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
LHC collimation MDs, crystals and halo control
Scope of the Meeting: the Framework of the Collimation Project
Automated Collimation Operation
Results from crystal H on Beam 2
Halo scraping and loss rates at collimators
علم الكائنات الحية المجهرية
Monday 18 October : Collimation system
Peritoneal dialysis American Journal of Kidney Diseases
Summary of Week 13 G. Arduini, B. Holzer
The 4th International Particle Accelerator Conference, IPAC13
Status from the collimator impedance MD in the LHC
Comparison of IR Methods – Dispersive & Fourier Transform
مرکز آموزش علمی کاربردی شرکت آذین خودرو
Saturday 2/4/ :00-09:00 Problems with SPS:
مدل الماس در مزیت رقابتی ملل مایکل پورتر
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Yesterday morning Held 1647 for a while – SPS kicker problem
Collimation after LS1: cleaning and β* reach
Collimation margins and *
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Signal Conditioning.
Improving Collimator Setup Efficiency
Collimation qualification during the first weeks of the 2011 run
Presentation transcript:

Beam Distribution MD Sun, :00 to 14:00 F. Burkart R. Assmann, R. Bruce, M. Cauchi, D. Deboy, C. Derrez, L. Lari, J. Lendaro, A. Masi, S. Redaelli, A. Rossi, G. Valentino, D. Wollmann

What we did: Florian Burkart 2

What we did: Florian Burkart 3 Scraping Calib.factor B1 Calib.factor B2 [p/Gy] TCP.D1.2E E+12 TCP.C1.25E E+12 TCP.B1.94E E+12

Florian Burkart Preliminary Results (1/3): Comparison hor/ver/skew scrapings

Preliminary Results (2/3): Ver. Scraping B1 Florian Burkart 5 ngfdhgfd Courtesy: D. Wollmann

Preliminary Results(3/3): Microphone Signal Analysis D. Deboy, F. Burkart, C. Derrez, J. Lendaro, A. Masi, D. Wollmann 6 C B