Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.

Slides:



Advertisements
Similar presentations
1 ALICE EMCal Electronics Outline: PHOS Electronics review Design Specifications –Why PHOS readout is suitable –Necessary differences from PHOS Shaping.
Advertisements

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Lab G measurements Yagmur Torun Center for Accelerator and Particle Physics Illinois Institute of Technology MUCOOL Collaboration Meeting - LBNL - October.
MICE SciFi-tracker prototype MICE experiment Tracker: alternative technologies SciFi tracker Single-station prototype – mechanical status Single-station.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
KEK beam test H. Sakamoto. Purpose To optimize a concentration of the second dopant for scintillating fibers KEK beam test to study light yields for various.
MICE-SciFi team, 14 October 2003 SciFi: progress report Progress: All stations shipped to FNAL … … assembly in progress Measurements: Effect of radiated.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
International Muon Ionization Cooling Experiment Edward McKigney Imperial College RAL March 25, 2002 Physics Motivation and Cooling Introduction.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Julia Sedgbeer Mice Collaboration Meeting, June SciFi Tracker – SW Status & Plans General SW status Simulation & Reconstruction Performance Studies.
Prototype Performance in D0 test stand M.Yoshida (Osaka Univ.)
KEK Test Results / Plans Akira SATO Osaka University, Japan.
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
February 8 th, 2001 Status Report: SciFi for MICE Edward McKigney Imperial College London.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
Clear Fiber and Wave Guide Fab. Makoto YOSHIDA (Osaka Univ.) July MICE FT
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
Tracking Detectors Working Group MICE Collaboration Meeting March 30, 2004 A. Bross.
1 Status of the MICE SciFi Tracker Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
Main Injector at Fermilab. Silicon Vertex Tracker Integrated system of barrels and disks ~ 800k total channels.
Tracker Summary Makoto Yoshida Osaka Univ. MICE Frascati June 28 th, 2005.
Fast TOF for Muon Cooling Experiments Robert Abrams Muons, inc.
MICE Berkeley, Oct 2002 MICE Spectrometer Design Proposed Tracker Implementations A. Bross Fermilab.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Measurement of 'intrinsic' properties of scintillating fibers H. Sakamoto Osaka University, Japan A.Sato M. Yoshida Y. Kuno Osaka Univ. K. Yoshimura KEK.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
THE FORWARD PROTON DETECTOR AT DZERO Gilvan Alves Lafex/CBPF 1) MOTIVATION 2) DETECTOR OPTIONS 3) FPD R&D 4) OUTLOOK Lishep 98 Lafex/CBPF Feb 17, 1998.
MICE : the Muon Ionization Cooling Experiment M. Yoshida (Osaka Univ.) for the MICE Collaboration Osaka - Overview and Status -
Detector Parallel Session Video Conference Fri 13/6 8:30 Grichine EMCal Simulation UpdateEMCal Simulation Update 09:00 Bonesini TOF UpdateTOF Update Radicioni.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Don Lincoln, Fermi National Accelerator Laboratory, Instr’99, November 1999 Characterization and Performance of Visible Light Photon Counters (VLPCs)
805 MHz Status IIT NFMCC Meeting March 12-15, 2006 A. Moretti March 12, 2006.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
MICE Phase 1 Koji Yoshimura KEK June
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
DØ Central Tracker Replaced with New Scintillating Fiber Tracker and Silicon Vertex Detector The DØ Central Detector Upgrade The DØ Detector is a 5000.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
DOE Program Review 5/17/06 A. Bross Muon Accelerator R&D DOE Program Review May 17, 2006 A. Bross.
Multipixel Geiger mode photo-sensors (MRS APD’s) Yury Kudenko ISS meeting, KEK, 25 January 2006 INR, Moscow.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
CHIPP Oct 2007Jean-Sébastien Graulich Status of MICE Jean-Sebastien Graulich, Univ. Genève o o Introduction o o Beam Line o o Technical Design o o PID.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Roberto Calabrese Ferrara University and INFN
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
MANX at RAL Experiment: Beam Line, Detectors, and Plans
MICE The International Muon Ionisation Cooling Experiment
The E835 SCI-FI Detector In Ferrara It has been built a scintillating fibers detector for the tracking system of exp. E835 (Charmonium spectroscopy) a.
R&D of MPPC in kyoto M.taguchi.
Presentation transcript:

Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002

Outline Fiber Tracker Description Near-term R&D Program Tentative Milestones Summary

Emittance Measurement (P. Janot)

Fiber Tracker Several planes of crossed scintillating fibers, based on experience with D0 and MuScat Relatively simple technology giving a fast signal

Fiber Tracker Layout Layout based on 0.35 mm or 0.50 mm round doubly clad fibers with a doublet layer structure Three layers of doublets crossed at 120º provide an active area of 30 cm diameter There are a total of 4286 (3000) fibers per detector plane 0.3% (0.4%) X 0 per plane with a resolution of about 40  m (extrapolated from the measured resolution in D0) (A. Bross)

Readout Schematic Mirror Scintillating Fiber Optical connector Waveguide VLPC cassette Electronics Cryostat Or MAPMT System (A. Bross)

VLPC VLPC (Visible Light Photon Counter) –Cryogenic APD 9K Characterization/test/sort Cassette Assignment –As shown (A. Bross)

VLPC Performance (A. Bross) VLPC  HISTE VI –High QE  80% –Low noise <5X10 4 Hz  1.0 pe) –High Rate capability >40 MHz –High production yield  70% (vs. 27% projected)

Important Detector Issues Detectors must operate in strong solenoidal fields & with intense RF-cavity backgrounds & contribute negligible emittance degradation Working out safe design and operating approaches is a crucial and challenging part of the MUCOOL R&D effort underway at Fermilab

Front-End Electronics Current VLPC readout uses SVXII chip, this is being replaced by D0 New electronics will be clocked at 132 nS, and are being designed now; based on a custom ASIC(TriP chip) and commercial ADC and FPGA chips Need to evaluate if these electronics can be used for MICE If we can use the D0 electronics, we just need to order them when D0 does its production, if not new electronics will be a major undertaking

Near Term R&D Prototypes of two versions (.35 mm and.5 mm) of the SciFi ribbons are being made at FNAL – these are 1 inch ribbons with no adhesive in the active region (‘stretched fiber’ design) A test cryostat with 32 VLPC channels is being constructed at FNAL A beam test with muons at KEK will happen in the Autumn Tests with the 805 MHz cavity in FNAL Lab G will happen before Christmas

Conclusions We have a good conceptual design based on round scintillating fibers and VLPC readout Suitability of the new D0 readout electronics needs to be determined Prototypes are being constructed now, and will be tested in a muon beam and with an 805 MHz RF cavity The RF background issue needs to be resolved using a 201 MHZ cavity There is a good deal of mechanical design work, probably 1-2 years FTE