1 August 2010 Shell Upstream International - Europe Consenting Carbon Capture & Storage Scottish Government Workshop - Offshore Pipeline 11 August 2010.

Slides:



Advertisements
Similar presentations
Governments role in the regulation of offshore exploration activities Commonwealth waters Environmental Sustainability Unit – August 2010.
Advertisements

Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
BCs Drinking Water Action Plan Dr Shaun Peck Deputy Provincial Health Officer Ministry of Health Services.
Derek Saward Head, Environmental Management Team
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
New law governing the impacts of deep water petroleum and mineral extraction Robert Makgill Barrister & Solicitor North South Environmental Law.
29/04/04 Landfill Directive 1999/31/EC Colin Gray 29 April 2004.
Understanding the EEZ & CS Act and its Provisions Siobhan Quayle & Siobhan Mordaunt (EPA Legal Team)
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
Carbon Capture and Storage (CCS) Offshore Transport and Storage
Key Environmental Issues for Round Two Sue Sljivic Director – RSK ENSR Environment Ltd
Integrated Pest Management Act and Regulations - Use Requirements Ministry of Water, Land and Air Protection Environmental Management Branch Integrated.
Comhairle Contae Maigh Eo Mayo County Council PERMITTING OF ENERGY PROJECTS A Local Authority Perspective Iain Douglas Senior Planner Engineers Ireland.
North Hoyle Offshore Wind Farm 17th April 2002 BONUS Energy A/S.
ENVIRONMENTAL ASSESSMENT SEA Jamie Byfield SEA Technical Officer HRA & EIA Cara Davidson Policy Manager.
Making Aarhus work in international forums A workshop on promoting the application of the principles of the Aarhus Convention in international forums Geneva,
BWEA OFFSHORE CONFERENCE 17 – 18 APRIL 2002 Offshore Consents Planning for the Future Nigel Peace Director, Energy Regulation Department of Trade & Industry.
Energy National Policy Statements Nick Cooper DECC.
NOT PROTECTIVELY MARKED Shipping, Pipelines and the Oil Industry – Role of the SOSREP Hugh Shaw The Secretary of State’s Representative Highlands & Islands.
Offshore Safety Directive (OSD) Update on the Offshore Petroleum Licensing Regulations 2015 Derek Saward DECC EDU OGED 18 th December 2014.
Offshore Safety Directive (OSD)
Implementation of IED Implications for industry, particularly those involved in waste management, and the influences it has on permitting Dynes Solicitors.
Regulatory Body MODIFIED Day 8 – Lecture 3.
Offshore Directive – HSE legislative Changes
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The German Approach on Safety of Natural Gas Distribution Pipelines WORKSHOP ON THE PREVENTION OF ACCIDENTS OF GAS TRANSMISSION PIPELINES (The Hague, 8.
Federal Energy and Environmental Regulation Agencies and Laws
Proposed Regulated Waste Framework Julian Chan - EHP.
UK OFFSHORE WIND 2002 Legal and Consents Issues From the Developer’s View.
NATIONAL RAILWAY INFRASTRUCTURE COMPANY Safety Inspectorate Inspection Ecology September 2011 Waste management in National Railway Infrastructure Company.
Health and Safety Executive Health and Safety Executive Seveso III Directive Moving from Seveso II to Seveso III Sandra Ashcroft, HSE 19 March 2013.
Work Health and Safety (National Uniform Legislation) Act and Regulations NT WorkSafe Anna McGill.
Marine Natura in UK offshore SAC consultation Charlotte Johnston, Mark Tasker, Paolo Pizzolla JNCC North Sea RAC.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
Health and Safety Executive Health and Safety Executive Competent Authority & Data Reporting HSE/DECC Consultation Events - Spring 2014 EU Offshore Directive.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
Onshore oil and gas: environmental regulation and the consenting process UKELA Seminar 23 September 2015.
Ministry of Energy, Mines and Petroleum Resources What happens if the Moratoria are Lifted UBCM Offshore Working Group Jean Dragushan Offshore Oil and.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Transmitted by the representative of JAPAN Toward Realization of the “Mutual Recognition of International Whole Vehicle Type Approval (IWVTA)” under the.
Advisory Committee Kickoff Meeting SWRCB Program to Develop Sediment Quality Objectives for Enclosed Bays and Estuaries of California July 29, 2003 CAL/EPA.
DRAFT Proposal for a European Directive on the Geological Storage of Carbon Dioxide Subject to modification on adoption by the Commission.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Current state of regulation of shale gas regulation in the UK Dr Sanna 12 March
Marine Planning update Steve Brooker Head of Marine Planning.
Energy Regulator Bill Presentation to Parliamentary Portfolio Committee by Department of Minerals and Energy 3 August 2004.
The Permitting Process under the Pollution Prevention and Control (Scotland) Regulations Ian Halliday Senior Policy Officer.
Investigational Devices and Humanitarian Use Devices June 2007.
Bulgarian Geology and Mining Ministry of Environment and Water.
Marine Planning Issues Tim Norman Senior Manager Planning 23 November 2010.
Mosun Togun CCS Regulation Seminar U.I.O Oslo LLM Environmental Law15 th May, 2009.
Update on EU Issues 10 th March 2010 Manchester Conference Centre Health and Safety Executive Major Hazards Policy Team Paul Edwards.
Protection assessment of Natura 2000 network areas in Poland – main problems Marzena Modrowska Krzysztof Suliński Ministry of the environment in Poland.
A Case Study - What if an Oil Spill Occurred on Land in Europe or in European Waters? Valerie Fogleman Consultant, Stevens & Bolton LLP Professor of Law,
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Marine Planning since 2011 Linda Rosborough – Director of Marine Scotland.
Federal Service for Environmental, Industrial and Nuclear Supervision LEGAL REQUIREMENTS ON EXPLOSION PROTECTED EQUIPMENT FOR THE GAS AND PETROLEUM ACTIVITIES.
REACH Downstream Users Istanbul 21 st June 2010 Mike Potts UK REACH Competent Authority.
ADRIATIC MARITIME LAW CONFERENCE PORTOROŽ, May 2016
Policy workstreams Craig Mallett Miriam Eagle.
Corallian Energy: licence interests
Tapu Te Ranga Marae, Wellington 24 – 25 June 2014
Towards Modern Environmental Impact Assessment (EIA) in Uzbekistan
Nick Bonvoisin Secretary to the Convention on the
EU action after Deepwater Horizon accident - Gulf of Mexico – April 2010
Implementing the EU CO2 Storage Directive: Challenges and Opportunities 7 November 2011 Public Engagement in the UK Louise Barr, Head of Outreach.
Update from Marine Scotland November 2018
Open Letter - Summary of Responses
Legal and Regulatory Framework for Radiation safety in Lithuania
Presentation transcript:

1 August 2010 Shell Upstream International - Europe Consenting Carbon Capture & Storage Scottish Government Workshop - Offshore Pipeline 11 August 2010 Paul Wood Projects and Technology Environmental Specialist

2June 2010RESTRICTED Mains Aquifer Offshore Pipeline Scenario Town & Country Planning Act (Scotland) 1997 Food & Environment Protection Act 1985 Coast Protection Act 1949 Petroleum Act 1998 MHWS 3 Nautical Miles ‘Controlled Waters’ 12 Nautical Miles ‘Limit of Territorial Waters’ 200 Nautical Miles or UK Waters (Continental Shelf Limit) LWM Boyndie BayGIP FEPA Licence PWA Licence Consent to Locate (Schedule 4 of CPA) Crown Estates Licence Marine (Scotland) Act 2010 – Marine Licence? Planning / Marine Activities Regulations

3June 2010RESTRICTED Environmental Regulations MHWS 3 Nautical Miles ‘Controlled Waters’ 12 Nautical Miles ‘Limit of Territorial Waters’ 200 Nautical Miles or UK Waters (Continental Shelf Limit) LWM Boyndie BayGIP Offshore Chemical Regulations 2002 Conservation (Natural Habitats, &c.) Amendment (Scotland) Regulations 2008 Offshore Petroleum Production and Pipe-lines (Assessment of Environmental Effects) Regulations 1999 Water Environment (Controlled Activities) (Scotland) Regulations 2005 CAR Licence Offshore Petroleum Activities (Conservation of Habitats) Regulations 2001 ((as amended) Environmental Statement will be submitted and will allow an Appropriate Assessment to be undertaken PON15C Town & Country Planning Act (Scotland) 1997

4June 2010RESTRICTED Environmental Regulations covering CCS activities The Energy Act 2008 (Consequential Modifications) (Offshore Environmental Protection) Order 2010 has updated the following legislation (applicable to pipelines) to cover CCS activities and came in to force on 1 st July 2010: Offshore Petroleum Production and Pipe-lines (Assessment of Environmental Effects) Regulations 1999 (as amended); Offshore Petroleum Activities (Conservation of Habitats) Regulations 2001 (as amended); Offshore Chemical Regulations 2002; Other non-specific CCS Environmental Consents required for this scenario: Water Environment (Controlled Activities) (Scotland) Regulations 2005; Coast Protection Act 1949 (as amended); Food and Environment Protection Act 1985; Marine (Scotland) Act 2010 (due to come in to force April 2011)

5June 2010RESTRICTED Safety Regulations Obligations for a Major Accident Hazard Pipeline under Pipeline Safety Regulations 2010 (currently under consultation) in case CO 2 is designated as a dangerous fluid under Schedule 2: Notification to the Health & Safety Executive before construction (no more than 3 years and no less than 6 months) in accordance with Schedule 4 Notification to the Health & Safety Executive before use Preparation of Major Accident Prevention Document for the pipeline Establish, record and review the appropriate Emergency Procedures Regulations are still under consultation. In case CO 2 is not identified as a dangerous fluid under Schedule 2, none of the above will be applicable.

6June 2010RESTRICTED Consenting Timeline Consent/ Application Regulations Regulatory Approval Time Environmental Statement & PON16 Appropriate Appraisal Offshore Petroleum Production and Pipe-lines (Assessment of Environmental Effects) Regulations 1999 (as amended); Offshore Petroleum Activities (Conservation of Habitats) Regulations 2001 (as amended) 6 Months CAR LicenceWater Environment (Controlled Activities) (Scotland) Regulations Months PON15COffshore Chemical Regulations month FEPA & Consent to locate *Marine Licence Food and Environment Protection Act 1985; Coast Protection Act 1949 *Both Repealed under Marine (Scotland) Act 2010 (5 th April 2011) 10 Weeks PWAPetroleum Act 1998; Months Notification before Construction Notification before Use Pipeline Safety Regulations Months

7June 2010RESTRICTED Conclusions Existing Oil and Gas legislation has been amended to include CCS activities allowing offshore developers to continue working in a known and well understood permitting regime. Approval timelines are understood and it is accepted that some may vary due to the untested nature of CCS activities. Clarity still required on the Implementation of the Marine (Scotland) Act 2010 and who will regulate outside of Scottish Territorial waters. A decision is required as to whether CO2 will be treated as a dangerous fluid under Schedule 2 of the Pipeline Safety Regulations.