Activity Based Costing (ABC). Activity based costing An alternative method to absorption costing, called Activity Based Costing (ABC) has emerged. It.

Slides:



Advertisements
Similar presentations
© 2012 Pearson Prentice Hall. All rights reserved. ACTIVITY BASED COSTING.
Advertisements

Ch 5 – Activity based accounting
Activity-Based Costing Systems Chapter 4. Traditional overhead allocation system  Single predetermined rate is used to allocate overhead to products.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Supplementary Slides - Activity Based Costing Systems Design:
Chapter 14 Contemporary cost management. Cost management §Improvement of an organisation’s cost effectiveness through understanding and managing the real.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 8.
Advanced Costing - ABC Activity Based Costing
ACTIVITY BASED COSTING
FDM5 Strategic cost analysis 1 Strategic cost analysis 1.
Chapter Seven Activity-Based Costing: A Tool to Aid Decision Making.
Activity-Based Costing
Activity-based Cost Management
1 TRADITIONAL PRODUCT COSTING METHODS Accounting Principles II AC Fall Semester, 1999.
Prepared by Diane Tanner University of North Florida Chapter 5 1 Allocation of Indirect Costs: Simple Costing & ABC.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead.
Introduction Overhead costs are a major cost area for many organisations. Planning and control of overhead costs is an ongoing challenge to managers.
1 Activity-Based Costing Better Costing for Better Decisions.
Activity-Based Costing and Analysis
3 Chapter Three Product Costing and Cost Accumulation in a Batch Production Environment.
13-1 CHAPTER 13 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Accounting and Reporting Systems.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 17-1 JOB ORDER COST SYSTEMS AND OVERHEAD ALLOCATIONS Chapter 17.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
Activity-Based Costing: A Tool to Aid Decision Making
Strategic Management Accounting Priyanka Darshana MBA(Strategy), ACMA(UK), CGMA, ACMA( SL), B.B MGT(MKTG)SP.
1 Activity-based costing. 2 Introduction In the past, overhead costs were relatively small, and the problems arising from inappropriate overhead allocations.
AFM Activity Based Costing ABC By Isuru Manawadu B.Sc in Accounting Sp. (USJP), ACA.
Activity based costing. There is no true cost of a good or service unless a company manufactures a single product or provides a single service. Otherwise,
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Cost Allocation and Performance Measurement Chapter 21 Modified from Publisher Provided.
1 Activity-Based Costing and Activity-Based Management
© The McGraw-Hill Companies, Inc., 2007 McGraw-Hill/Irwin Chapter 21 Cost Allocation and Performance Measurement.
Chapter 8 Activity-based costing. §A methodology that can be used to measure both the cost of cost objects and the performance of activities §Can help.
1 Module19 Assigning Indirect Costs: Activity-Based Costing (omit pp to 19-13)
Chapter Seven Activity-Based Costing: A Tool to Aid Decision Making.
© The McGraw-Hill Companies, Inc., 2002 Slide 22-1 McGraw-Hill/Irwin 22 Cost Allocation and Performance Measurement.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead 11-1 Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides.
Criticisms of Absorption Cost Systems: Inaccurate Product Costs Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved.
Criticisms of Absorption Cost Systems: Inaccurate Product Costs Chapter Eleven.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eight ACCT7110-Dr. Bailey-Spring 2008 Activity-Based Costing: A Tool to Aid.
When cost systems were developed in the 1800s, the emphasis was on simplicity because: 1. Cost and activity data had to be collected by hand and all calculations.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e By Kim Langfield-Smith 11-1.
Chapter 6 A closer look at overhead costs. What are overhead costs? §Product costing perspective l indirect manufacturing costs, or l all indirect costs.
Activity-Based Costing 2 WHAT IS ABC? Definition: Activity-based costing (ABC) is an approach to the costing and monitoring of activities which involves.
Strategic Management Accounting
Activity Based Costing Nancy R. Mangold Professor, Department of Accounting California State University, East Bay.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Accounting Systems For Measuring Costs Chapter 17.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Job Order Cost Systems and Overhead Allocations Chapter 17.
Activity Based Costing (ABC). Activity based costing An alternative method to absorption costing, called Activity Based Costing (ABC) has emerged. It.
Part Two: Cost accumulation for inventory valuation and profit measurement Chapter Three: Cost assignment Use with Management and Cost Accounting 8e by.
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Cost Allocation and Performance Measurement Chapter 21.
3-1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright © 2016 by McGraw-Hill.
McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc., All Rights Reserved CHAPTER 13 McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc.,
MBA(Strategy), ACMA(UK), CGMA, ACMA( SL), B.B MGT(MKTG)SP
Accounting: What the Numbers Mean
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead.
Activity Based Costing (ABC)
Accounting: What the Numbers Mean
ACC602: Strategic Management Accounting Topic 3: Standard costs for control measures: flexible budgets and manufacturing overhead analysis Slides adapted.
Activity-Based Management and Activity-Based Costing
Cost Accounting and Reporting Systems
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a.
Chapter 8 Accounting for overhead
COST ACCOUNTING (ACC 203) By DR. O. J. AKINYOMI LECTURE NOTE
Activity-Based Costing Chapter 3
Activity Based Costing - ABC
Activity-Based Costing Systems
Activity-Based Costing Chapter 3
Activity-Based Costing System
Presentation transcript:

Activity Based Costing (ABC)

Activity based costing An alternative method to absorption costing, called Activity Based Costing (ABC) has emerged. It was developed in the Late 1980’s to address the requirements of a more modern manufacturing environment.

The changing environment Cost € 1960s 2000+

The changing environment

Key points on ABC Absorption costing assumes that production volume drives the overhead cost. Higher the volume higher the OH cost and vice versa. But ABC criticised this and point out that complexity in the multi product environment could create more OH due to the requirement of the supporting activities. Traditional overhead recovery basis (direct labour/cost particularly) may have little relevance to overhead and the complexity of the modern business environment. ABC is based on the concept that it is the activities involved in providing a product or service that incur cost. It is therefore more accurate to charge overhead cost based on the amount of activity consumed when the product or service is provided. The ABC approach is more reflective and accurate, as it identifies each activity that occurs in an organisation and charges overhead to each product on the basis of its consumption, or use, of each activity.

The objective of ABC The objective of activity based costing is to arrive at a more accurate product cost. This is achieved by assigning overhead cost to the activities carried out within the organisation and then relating how often these activities occur for each product or service produced.

Supporting activities Packaging Shipping Set ups Designing Inspection Quality control Product testing Customer service Maintainers

ABC implementation considerations Decision to implement is significant as generally ABC systems are more complex and sophisticated. A detailed cost benefit analysis should be carried out before a commitment to the introduction of ABC is given. It is important that senior management buy into the system from the onset and encourage its implementation throughout the organisation. It is essential that the resources necessary for implementation of the new system are made available. The implementation of an ABC approach requires a thorough examination of the organisation to identify every activity that occurs. A cost pool should be created for each activity and the most suitable cost driver is established. The terms ‘cost pools’ and ‘cost drivers’ are central in explaining the concept.

Cost pools Cost pools are similar in principle to cost centres in traditional systems, however, cost pools relate to activities regardless of conventional departmental boundaries. A cost pool should be created for each activity identified. The costs associated with each activity are pooled together accumulating the total cost of the activity

Cost drivers he key idea behind ABC is to focus attention on those factors that cause or drive costs. These factors are known as cost drivers. A cost driver is the event and factors, which cause an activity to occur and to consume resources.

Implementing ABC

ABC steps 1. Apportion all overheads to cost pools. 2. Calculate cost driver rates for each cost pool. 3. Establish the overhead cost per unit.

Example 3.7: ABC cost pools and cost drivers

Example 3.8: ABC to establish unit cost

The ABC process

Example 3.9: The ABC approach

More than a product costing system ABC provides a revolutionary approach to cost control by analysing costs based on activities rather than traditional departmental boundaries. Management attention focuses now on the activities required and their cost. Unnecessary activities can be eliminated and costly activities examined with a view to significantly reducing costs. While ABC was initially popular in manufacturing due to its provision of superior product costs and stock valuations, the cost control aspect has resulted in many service organisations also implementing ABC systems.

Advantages of ABC Product costs produced by an ABC system should be more accurate than those produced by an absorption costing system. ABC is approved as a method of valuing stock in accordance with accounting standards. ABC systems produce useful information for decision-making. As ABC systems focus on identifying activities in an organisation, unnecessary activities or activities that do not add value can be identified, adjusted, or eliminated. The ABC approach provides a new emphasis on cost control by focusing attention on the cost of each activity. The ABC approach is useful in cost reduction programmes.

Criticisms of ABC ABC systems are generally complex, difficult and expensive to implement. ABC systems can be time consuming and expensive to administer. An ABC system should not be introduced unless it can provide additional information which management can use. Where an organisation deals in similar products or provides a similar service level to all clients, ABC will provide little benefit as a costing system, because it produces similar costs to other simpler approaches. Complex situations may have multiple cost drivers. When establishing what drives the cost of an activity there may be more than one cost driver. If the approach is not applied properly it can result in a costly exercise with no significant benefits achieved. Developing appropriate cost pools and cost drivers can be difficult. If the design is flawed or the gathering of necessary data inaccurate, the outputs (product costs) will be misleading.