Transfer Service Issues Meeting Bonneville Power Administration (BPA) “Considerations” From Exhibit A, of the 20-Year Contract OTHER ISSUES AS THEY RELATE.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

Lottery Method in BPA’s Simultaneous Submission Windows and Potential Application to the Simultaneous Defender Matching Process NAESB Meeting 05/01/13.
OC ORSTF Position WECC Board Meeting December 8, 2006.
Winter 2013/2014 Reliability Solution Including LNG MWHs N. Jonathan Peress Conservation Law Foundation Greg Lander Skipping Stone NEPOOL Markets & Reliability.
Cascade Natural Gas Corporation 2014 Natural Gas Outlook Mark Sellers-Vaughn Manager, Supply Resource Planning July 8,
Amendment 3/5 Workshop.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
WELCOME Western Area Power Administration1. Where did the journey begin? Western Area Power Administration2.
3/16/20001 BPA’s traditional revenue stream varies with water supply (higher water conditions, higher revenues) BPA’s revenues from Slice are independent.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Public Exchange Clarification Briefing June 2009.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
Pricing the Components of Electric Service in Illinois Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
COMPETITIVE ELECTRICITY MARKETS March 15, PA Customer Choice Legislation  Distribution service remains regulated by PAPUC.  Transmission service.
Power Purchase Agreements Alex Sifford Ecos Consulting Portland, Oregon
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
BPA FY 2003 Financial Condition Update: Liquidity Tools to Bridge the Gap Confidential – Sensitive Information BPA has a number of liquidity tools to bridge.
Working together. Achieving results. CPUC Recycled Water OIR (R ) Workshop 3: Recycled Water Costs/Rates Water IOU Panel General Principles January.
Presented by: Heather Ward and Jason Cook Date: October 28, 2011 Presented by: > Proprietary and Confidential. For FAA Use Only. The Value of Private Loan.
Introduction to Bonneville Power Administration
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
FAR Part 2 Definitions of Words and Terms. FAR Scope of part (a)This part – (1) Defines words and terms that are frequently used in the FAR; (2)
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
Transfer Service Meeting, October 19, 2005 Bonneville Power Administration Long-Term Transfer Service (GTA and OATT) Customer Kick-Off Meeting Garry Thompson.
1 New Mexico State University Santa Fe Conference 2005 Steve Rodgers Office of Markets, Tariffs & Rates—South Federal Energy Regulatory Commission March.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Bulk Power Transmission System
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
COST SHARE Neta Fernandez Director, Grants and Contracts.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
1 Interconnection Update Jay Zimmerman Manager, Transmission Policy Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Northwest Power and Conservation Council Action Plan Summary.
Combined Heat and Power Workshop Report and Next Steps Power Committee Briefing 7/15/03.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
Bonneville Power Administration Significance of Rating Agency Ratings May 2002 Predicisional.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Transfer Service Issues Meeting Bonneville Power Administration (BPA) Considerations From Exhibit A, of the 20-Year Contract OTHER ISSUES AS THEY RELATE.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
Explanation of Changes to Draft “Firming” Schedule, Service Schedule E Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
Distance Learning and Accreditation Heather G. Hartman, Ph.D. Brenau University Online Studies and SACS Liaison.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts.
Philippine Feed-In Tariff System Implementation 1.
© CONSTELLATION ENERGY GROUP, INC. THE OFFERING DESCRIBED IN THIS PRESENTATION IS SOLD AND CONTRACTED BY CONSTELLATION NEWENERGY, INC., A SUBSIDIARY.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
Proposed Schedules: Reserves (D) and Intra-Hour Firming (E) October 13, 2009.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
Explanation of Revised Draft Reserves Schedule, Service Schedule D Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
Community Solar, Remote Net Metering, and Behind the Meter Solar Update Solar Progress Partnership* Summary of April 18, 2016 Comments The Solar Progress.
1 A Conversation about MISO Paul Spicer November 8, 2007.
EIM AWG July 5, Guiding Principles The intent of the group is to work collaboratively to better understand the WECC EIM costs and benefits analyses.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
COMMERCIAL LAW.
Fuel Cost Components in the Fuel Adder
California Product Offerings
Fuel Cost Components in the Fuel Adder
Fuel Cost Components in the Fuel Adder
FAR Part 2 - Definitions of Words and Terms
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Pseudo-tie business procedure
Network Contracting with Generators (incl
Mountain West Transmission Group Panel Discussion
Pseudo-tie business procedure
Presentation transcript:

Transfer Service Issues Meeting Bonneville Power Administration (BPA) “Considerations” From Exhibit A, of the 20-Year Contract OTHER ISSUES AS THEY RELATE TO TRANSFER SERVICE Garry Thompson Scott Wiley Connie Howard November 7, 2005 (This is a working document for discussion purposes only, and does not constitute an offer nor a commitment to provide service nor an agreement on cost recovery or allocation)

Transfer Service Meeting, November 7, 2005 Page 2 of 9 A1. Development of Direct Assignment Guidelines for Transfer Service Customers a)Treatment of costs and allocation of responsibilities associated with facilities not included in the definition of Transmission Component Costs. (Low Voltage Service, below 34.5 kV) Current Practice: BPA provides low voltage services to GTA customers pursuant to section 8(f)(2) of the Power Sales Contract. This provision requires BPA to pay for wheeling across third party systems for delivery to existing low voltage POD’s. Currently low voltage is defined as voltage below 34.5 kV. Transfer Customers with low voltage POD’s pay the GTA Delivery Charge, currently $1.119 per kW/month.

Transfer Service Meeting, November 7, 2005 Page 3 of 9 A1. Development of Direct Assignment Guidelines for Transfer Service Customers (Continued) A1(a): Considerations: Bonneville remains open to continue to acquire low voltage service over third party systems. Should BPA maintain the existing cost recovery mechanism, or propose a new method? –Leave cost recovery charge consistent with TBL Delivery Charge? –All Transferor assessed Low Voltage Transfer costs are rolled into a new PBL delivery Charge? –Direct Pass through of individual assigned costs to each customer?

Transfer Service Meeting, November 7, 2005 Page 4 of 9 A1. Development of Direct Assignment Guidelines for Transfer Service Customers (Continued) (b)Treatment of costs and allocation of responsibilities associated with upgrades on facilities not included in the definition of Transmission Component Costs: Current Practice: BPA does not want to expand low voltage service beyond what is currently provided, and therefore, will seek to directly assign costs that are directly charged to BPA that are associated with expansion or upgrade of facilities. This practice is supported by the Principles identified in section 8(b) of the Agreement Regarding Transfer Service. Should Bonneville pass through such costs directly, whether the third party transmission provider directly assigns or rolls it in?

Transfer Service Meeting, November 7, 2005 Page 5 of 9 A1. Development of Direct Assignment Guidelines for Transfer Service Customers (Continued) Considerations: The treatment of existing facilities that are of sufficient capacity to accommodate load growth without upgrades. Existing Facilities that need upgrades or expansions due to Transferor needs. Replacement of existing facilities due to catastrophic failure. New Facilities and New POD’s: –Transferor requires new facility or POD. –Customer, not transferor, requires new facility/POD (load growth on customers System). –BPA’s participation in sharing the costs of improvements on a transferors system.

Transfer Service Meeting, November 7, 2005 Page 6 of 9 A2. Quality of Service [Discussion at a later date]

Transfer Service Meeting, November 7, 2005 Page 7 of 9 A3. Respective roles of customers and BPA in management of General Transfer Agreements (GTA), including whether to do periodic evaluations of the costs or benefits of replacing GTA with Open Access Transmission Tariff service. In Section 3 of the 20-year Transfer Service contract BPA has committed to arrange for Transfer Services for the duration of the agreement. However, BPA and the customer may agree to make other arrangements. Considerations: Should Bonneville continue to hold and manage the agreements, with continued input from the customers with regard to cost control? –or– If the customer holds the contract, should Bonneville have a reimbursement mechanism that strictly limits Bonneville’s exposure to incremental or otherwise un-recovered cost, including those for administration and scheduling?

Transfer Service Meeting, November 7, 2005 Page 8 of 9 A4.Treatment of costs, and allocation of responsibility, for ancillary services. Current Practice: In general, PBL pays transferor; customer pays TBL for Scheduling, System Control, Dispatch, Reactive Supply and Voltage Control from generation sources. Contingency reserves (spinning and supplemental) are the customers’ responsibility and choice (purchase from TBL, self supply or third party supply). PBL generally pays transferor for Regulation and Frequency Response, and the customer reimburses the PBL the lesser of TBL’s Regulation rate or the transfer provider’s rate. For Energy Imbalance the PBL pays the transferor for Full and Actual Partial customers who’s contracts contain load-matching provisions. Transfer customers that do not have load matching service provided to them under their Subscription contract (such as those purchasing the Slice product) reimburse PBL.

Transfer Service Meeting, November 7, 2005 Page 9 of 9 A4.Treatment of costs, and allocation of responsibility, for ancillary services. (Continued) Considerations: Should the customer continue to pay for only one of each type of service for ancillary services associated with the delivery of Federal Power?