RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7

Slides:



Advertisements
Similar presentations
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Advertisements

20-Nov-06 FALC - KEK Global Design Effort 1 GDE Report Barry Barish Caltech / GDE 20-Nov-06 RDR Design Freeze.
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
The RDR Report Odyssey Nan Phinney SLAC for N^3 team of editors.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
6-7 April 06 MAC Review Global Design Effort 1 BCD Overview Process and Highlights Barry Barish GDE Caltech.
J.C. Sheppard, SLAC Americas Region January 31, ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing,
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Operations, Test facilities, CF&S Tom Himel SLAC.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
John Carwardine 22 June 2012 TEB webex meeting. Agenda Management items (John) –General updates, status of submissions –Principle Editor assignments for.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
1 Status of SB2009 Rebaselining Proposal Document and Preview of Feedback from PMs + Editor Draft C N.Toge.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
June 13, 2007 Global Design Effort 1 ILC Effort at SLAC RDR > EDR Nan Phinney SLAC/GDE.
6-7 April 06 MAC Review Global Design Effort 1 RDR Management Accelerator Design Towards the RDR Nick Walker ILC-GDE.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
GG3 Operations & Reliability (Availability) Eckhard Elsen Tom Himel
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Conventional Facilities and Siting Global Group (ARCFS)
Conventional Facility & Siting (CF&S) Overview for the Positron Source
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
ILC Project Management Status
Status and Plan of GDE Design Work (Including Road Map for RDR)
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
Technical Design Report preparation
ILC Global Design Effort
Electron Source Configuration
ILC Cryogenics -- Technical Design Report Planning
ILC - Global Design Effort
Presentation transcript:

RDR Report Writing Nan Phinney SLAC

7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch )Accelerator Design 5)Conventional Facilities 6)Sites 7)Costs Total pages ~ 225 RDR current draft also has Technical System chapter

7/20/06 VLCW06 Global Design Effort 3 Draft Outline (1) I) RDR Introduction RDR Org and process (Walker) 5 pages II) Accelerator Design 1.ILC Parameters (Yokoya)5 pages 2.Electron Source (Brachmann)10 pages 3.Positron Source (Sheppard)15 pages 4.Damping Rings (Gao)20 pages 5.RTML (Tenenbaum)10 pages 6.Main Linacs (Adolphsen)20 pages 7.Beam Delivery (Seryi)20 pages 8.Beam Dynamics 10 pages 9.Operations and Availability (Himel)15 pages

7/20/06 VLCW06 Global Design Effort 4 Draft Outline (2) III) Technical and Global Systems 1.Magnets (??)5 pages 2.Vacuum (Noonan)5 pages 3.Modulator (Larsen) 5 pages 4.Klystron (Larsen)5 pages 5.Power distribution (Larsen)5 pages 6.Cavities (Mammosser)10 pages 7.Cryomodules (Ohuchi)10 pages 8.LLRF (Simrock)5 pages 9.Instrumentation (Burrows)10 pages 10.Dumps and Collimators (Markiewicz)5 pages 11.Control & Timing Systems(Carwardine) 15 pages

7/20/06 VLCW06 Global Design Effort 5 Draft Outline (3) IV) Conventional facilities 1.Introduction 2.Site layout 3.Tunnel layout 4.AC Power distribution 5.Cooling water and Air conditioning 6.Cryogenics (Peterson) 7.Safety systems 8.Construction plan and installation V) Sample Sites 1.Americas (Kuchler) 2.Asia (Enomoto) 3.Europe – Germany (Baldy) 4.Europe – Switzerland (Baldy)

7/20/06 VLCW06 Global Design Effort 6 Draft Outline (4) VI) Cost 1.Introduction – Methods and Assumptions 2.Overview 3.Accelerator 4.Conventional Facilities 5.Construction Cost Summary 6.Operating Costs VII) TDR R&D Plan

7/20/06 VLCW06 Global Design Effort 7 Accelerator Design Section System description – high level requirements Layout schematic Key Parameter table Subsystem descriptions include graphics or tables as needed mention any interesting technical components Subsystem 1 Subsystem 2 etc. Table summarizing components magnets, diagnostics, rf, etc.

7/20/06 VLCW06 Global Design Effort 8 Technical Section High level description of components Major classes considered, issues, how evaluated Example: Magnets 4 classes – warm, SC, kickers, specialty (e.g. FDs) issues – magnet reliability, redundant PS, location in CM, size constraints how issues were addressed in design approach used to develop costs (later??) not a catalog of magnet designs but a discussion of issues and solutions

7/20/06 VLCW06 Global Design Effort 9 CFS, Sites, Costs CFS High level description of design Leave technical details for ILC notes, wiki Sites Description of site, unique features, constraints Costs Description of approach, assumptions, guidelines Technical system approaches

7/20/06 VLCW06 Global Design Effort 10 Schedule Rough 1 st DraftKEK MAC, Sept 20 Detailed outline of section incl. topics to be covered in description, subsystems, design List of any graphics requiring pubs help Further draftsOctober Text submitted to editors, graphics developed Complete DraftValencia, Nov 6 Text should have been passed by editors, nearly final graphics and tables Also input to TDR R&D plans Chapter

7/20/06 VLCW06 Global Design Effort 11 Final Comments RDR is a high level description of the accelerator, CFS, sites and costs Detailed technical information should be published separately in ILC Technical Reports BCD must be updated to reflect changes adopted for the RDR More on this in next talk Nobu Toge (KEK) and Nick Walker (DESY) have agreed to be co-editors on the RDR