Emissivity and other infrared-optical properties (WP6) -------------------------------------------------------------------------------------------------------------------

Slides:



Advertisements
Similar presentations
WP4 – Task 4.4 LCA Activities
Advertisements

Green Partnerships Local Partnerships for Greener Cities and Regions Project overview Kick-off meeting Crete, 9-10 April 2013.
Serbia and Montenegro Council of Ministers Ministry of Internal Economic Affairs REGULATORY RULES TODAY AND TOMORROW Analytical overview: Mr Alija Haskic,
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
The Preservation of the Cultural Heritage of Property through an Analysis of European Regulations regarding Building Materials used in Restoration Chiara.
EVITHERM kick-off meeting, NPL, January 2003 WORKPACKAGE 8 Contact Thermometry WP Leader : LNE 1, rue Gaston Boissier Paris France Jean-Rémy.
European Quality in Individualized Pathways in Education.
1 ENISA’s contribution to the development of Network and Information Security within the Community By Andrea PIROTTI Executive Director ENISA Cyprus, 28.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP6 Communication and dissemination 10-11/07/2012COGEN Europe.
This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF. Work Package 4 & Methodology for Open Living Lab O4.1.7 Budapest,
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
| 1 Guido de Wilt DG TREN D4 EUROPEAN POLICY REGARDING MICRO-CHP EUROPEAN COMMISSION.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Overview of existing assessment schemes Rolf Bienert, John Lin.
Contact Thermometry (WP8) LNE - WP8 Report, SG Meeting, NPL 23 january 2004 SG Meeting NPL, Teddington, 23 january 2004.
1 WERT: WP 5 RG EVANS ASSOCIATES November 2010 Aim To pilot and evaluate the content and context of the course material with target groups To help women.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
Welcome to Cologne 3 rd WP 5 Meeting May 26 th 2015.
Co-operation Between (UK) & NPL(I) Kamal Hossain Director of Science & Innovation, NPLUK.
CENTRE DE THERMIQUE of LYON (CETHIL) Contact: Séverine Gomès WORKPACKAGE 8 : Contact Thermometry Task 8.1 CNR - Istituto di.
Description of Work Objectives WP 8 serves to define the technical content of the VI for contact thermometry. It will contain a selection of guides to.
EVITherM The European Virtual Institute for thermal metrology Contact thermometry (WP8)
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
History of the Project 1. 2 The starting point… CSA – Civil Service Apprenticeship LDV pilot project 2004 Italy, Spain, Bulgaria, Holland Tool: Excel.
1 st Program of Experience Exchange INSPECTION – PLANNING AND REPORTING (CURRENT SITUATION IN THE REPUBLIC OF CROATIA IN CORRELATION WITH IPPC) Brijuni,
Initial plans for WP 4 KickOff Meeting ICT-AGRI 2.
WP 9 - To create VI content for non-contact thermometry NPL Teddington EVITherM Kick-off Meeting EVITherM WP 9 - To create content for non-contact.
Evitherm project mid-term review Work package 7 presented by Pierre Le Parlouër Consulting Work Package Leader.
Some identification needs related to workers’ mobility eGovernment – eIDM ad hoc group meeting 4-5 May 2006 CBSS Crossroads Bank for Social Security Frank.
If you want to participate in Session 2, this PowerPoint template will help you to prepare the flash presentation about your institute. Each participant.
State Nuclear Regulatory Inspectorate of Ukraine SE “Information Technologies Center for Use of Nuclear.
“The Quality Infrastructure in Lebanon” Export Norms, Quality Control and Competitiveness FUTURE PROGRAMME Prepared By Ali Berro Director of Quality Programme.
TEMPERATURE MEASUREMENT & CONTROL DIVISION EVITHERM - WP 8 - Meeting 26 march 2003 Task 8.2 – CAP Compile database content of equipments and service providers.
1 ASTRONET Coordinating strategic planning for European Astronomy.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
ACTIONS AT NATIONAL LEVEL Proposal on criteria to choose ERFP activities/projects on national (sub-regional) level Elżbieta Martyniuk on behalf of the.
Deregulation to the Economy and removal of Administrative Barriers, Russian Federation EuropAid/114008/C/SV/RU Setting up of national accreditation system.
EVITherM The European Virtual Institute for Thermal Metrology Emissivity and other infrared-optical properties (WP6)
Croatian Government’s Priorities in the Regulatory Area UNECE Round Table on Regulatory Cooperation in South East Europe Geneva, 22 November 2004.
EVITherM The European Virtual Institute for Thermal Metrology Contact Thermometry (WP8) LNE - WP8 Report, SG Meeting, Torino 23 April 2003 SG Meeting IMGC,
Work Package 6 L2C Kick-off meeting Fontainebleau, March 7th 2006.
EIE065-EUBIONET II – 1 EUBIONET II EUBIONET II Efficient trading of biomass fuels and analysis of fuel supply chains and business models.
IKE Kick Off meeting WP4 Work Package 4 Thermal Conductivity and Diffusivity Guenther Neuer Institute for Nuclear Technology and Energy Systems.
EVITherM Industrial Aspects WP Tasks 3.0 and 3.1 WP Task 1.2 Paul Nesvadba, RGU, Aberdeen, UK Meeting at IMGC Torino, 22 April 2003 Review.
European Virtual Institute of Thermal Metrology ICTAC, Sardinia, Sept 04 The European Virtual Institute for Thermal Metrology Presented.
IKE University of Stuttgart EVITherM - WP , Torino Thermal Conductivity and Diffusivity Electrical Resistivity.
National Nuclear Regulatory Portal (NNRP) (Concept, Development and Experience) FNRBA Training Course on Knowledge Safety Networks, 14–18 October 2013,
COMPETITIVE AND SUSTAINABLE GROWTH Research DG European Commission Support for research infrastructures within GROWTH.
1/14 ea technology MicroCHeaP: Month 18 meeting Petten (NL) Work Package 2 Progress 5 April 2006 Presented by Yvonne Dickson Partners in power asset management.
EVITherM WP 2 EVITherM Kick-off meeting Phill Giles THTC1 Workpackage 2 To develop and market EVITherM WP Leader: Phill Giles (Thermal Technology.
European Commission - DG Environment Unit D.2: Water & Marine 1 Need for continuous exchanges on chemical monitoring issues, in the light of the on-going.
IMPRINT – EUROPE Professor Chris Nash (Institute for Transport Studies University of Leeds) Coordinator.
Implementation plan for Strategic Research and Innovation Agenda for Traditional Food Prof. Đuro Kutlača, PhD Institute “Mihajlo Pupin”, University of.
A network of European National Platforms and Focal Points for Natural Disaster Reduction Common Goals To facilitate and improve the exchange of information.
1 Transnational Partner Search Toolkit Transnationality Contact Points Meeting 30 September Warsaw.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
REGULATORY RULES TODAY AND TOMORROW
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
State Nuclear Regulatory Inspectorate of Ukraine
A&M Workplan Objectives
Report WP5 Activities W. Hohenauer.
Analysis of Responses to EVITHERM
ESSnet Projects Pascal JACQUES Unit/B5 Methodology and research
Chemical Monitoring Activity (CMA)
Chemical Monitoring Activity (CMA) ( )
CHEMICAL AND PHYSICAL CHARACTERISATION OF MULTIFUNCTIONAL MATERIALS
Presentation transcript:

Emissivity and other infrared-optical properties (WP6) Objectives of the technical Work Packages To create the technical information content of the web-site (WP4 to WP9) Information would be provided by a blend of sources, by links to existing sites, by to expert or resources, by texts and articles, EVITherM The European Virtual Institute for Thermal Metrology _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

Emissivity and other infrared-optical properties (WP6) Objectives of WP6 WP 6 defines the technical content for emissivity and other infrared-optical properties. Information related to the following categories will be collected and made available:  Facilities for measurements  Sources of technical data  Best practice guides  Reference material  Standardisation  Topics of interest EVITherM The European Virtual Institute for Thermal Metrology _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

EVITherM The European Virtual Institute for Thermal Metrology Emissivity and other infrared-optical properties (WP6) WP6: Description of Work Tasks Task 6.0 (CNR-IMGC) Define the content of the Work Package Provide a review of all data entries Evaluate the material from other WPs pertinent to this field. Task 6.1 (NPL) Content of a database that includes all facilities for measurements in this field in Europe. The database will include: measurement providers, measurement devices, calibration and testing laboratories in Europe. _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

EVITherM The European Virtual Institute for Thermal Metrology Emissivity and other infrared-optical properties (WP6) continue WP6: Description of Work Tasks Task 6.2 (LNE) Identify qualified sources of technical data in this field.. Review the best sources of data for various applications (radiation thermometry, remote sensing, solar energy applications, heat exchange calculations, data for characterisation of optical materials) Task 6.3 (ZAE) Collect existing material related to best practice guides, measurement procedures and use of measurement devices. Provide a review of existing material and identify additional needs. _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

EVITherM The European Virtual Institute for Thermal Metrology Emissivity and other infrared-optical properties (WP6) continue WP6: Description of Work Tasks Task 6.4 (RISOE) Identification of available certified reference materials and their sources of supply. Additional reference materials (not certified) will also be identified. Needs for additional reference materials. Task 6.5 (2 new members) Review of topics of interest and overview of technology and research outputs in the field plus an overview of where future work is required. Database for industrial requests of norms, accreditation rules and legal metrology requirements Links with organisations for standardisation and with accreditation bodies. _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

EVITherM The European Virtual Institute for Thermal Metrology Emissivity and other infrared-optical properties (WP6) Proposal for an updated WP6 plan _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

EVITherM The European Virtual Institute for Thermal metrology Emissivity and other infrared-optical properties (WP6) _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

EVITherM The European Virtual Institute for Thermal Metrology Emissivity and other infrared-optical properties (WP6) ACTION D.4:WPLs to arrange meetings with their members to discuss technical aims of WP. A key output of each of these meetings should be list of the planned WP outputs prioritised for phasing onto the EVITherM website. …. EVITherM Steering Group Meeting 28 January 2003 _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003