1 Vehicle Types Vehicle TypeFreeway Lane Capacity BusesLimited Capacity Bus Rapid Transit Medium/High Capacity Rail TransitHigh Capacity.
Advertisements

Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Bus Lane with Intermittent Priority Graham Carey PE., AICP BRT Project Engineer, Lane Transit District, Eugene, Oregon QUALITY TRANSIT -- NOW.
2007 Intermodal Operations Planning Workshop Bus Stop & Bus Lane Capacity: Planning Bus Routes in Downtown Seattle Owen Kehoe, PE, PTOE Transportation.
EFFICIENT TRANSPORTATION SOLUTIONS IN MINNESOTA A JOINT PRESENTATION TO THE Transportation Funding Advisory Committee September 14, 2012.
This is my “focus” slide, used to make sure that I’m getting the sharpest possible picture on the projection screen. It is the 1954 Freeway Plan for the.
Kenneth R. Buckeye, AICP Minnesota Department of Transportation.
11 Tunde Balvanyos, Ph.D. Bus Rapid Transit Coordinator, Pace APTA BRT May 2009.
East Bay Bus Rapid Transit Project Description August 11, 2011.
ROAD AND TRAFFIC SIGNS Sample questions from the (Road and Traffic Signs) unit of the Driving Theory syllabus. Signs and Symbols from Instant Art Traffic.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
MBTA Key Bus Route Improvement Program Joanne Haracz, AICP responsive client solutions since 1976 Pennsylvania Public Transportation Association April.
Lecture 6 Bus Rapid Transit, design elements and operational issues Dr. Muhammad Adnan.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Rail Capacity Unit 3: Measuring & Maximizing Capacity.
February 26, 2012 Managed Lanes Overview Dr. Adrian Moore Vice President Reason Foundation
State Highway 6 Corridor Access Plan. SH 6 Project Description Project Initiated and funded by –City of Houston –Missouri City –City of Sugar Land –Harris.
Euclid Corridor Design TRB BRT Workshop July 21, 2008.
Land Use Impacts of Bus Rapid Transit: The Boston Silver Line Victoria Perk, Senior Research Associate National Bus Rapid Transit Institute Center for.
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
Swift BUS RAPID TRANSIT (BRT) ITS Washington November 12, 2008.
Ch. 6 - Passing NY State DMV 1. The law requires that we drive on the right side of the road.  When we are allowed to pass other vehicles, we usually.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
BRT Vehicle Development. New Flyer Overview  Winnipeg, Manitoba since 1930 Three US facilities  Industry-leading market share of 42%  Commercial relationships.
RapidRide Briefing Growing Transit Communities East Corridor Task Force January 31 th, 2012 Ron Posthuma, Assistant Director King County Dept. of Transportation.
BRT as a Precursor of LRT? Lyndon Henry Data Analyst Capital Metro Austin, Texas TRB/APTA Joint Light Rail Transit Conference Los Angeles 20 April 2009.
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
October 9 th COMPLETE pg. 26 #2-4 Have Rules of the Road book out on desk BE PREPARED TO TAKE NOTES in 5 min.
Tolling and Congestion Pricing Patrick DeCorla-Souza Office of Innovative Program Delivery Federal Highway Administration Presentation to Transportation.
SUMMARY OF FINDINGS FROM A SURVEY OF LIKELY VOTERS IN DENVER What Is the Public Telling Us? Ben Kelly.
Transit – Our transit services will provide modern, innovative, and viable travel options. Because transit facilities and services are an essential element.
Mark Phillips BSDA/Metro Long-Range Planner. The Foundation: Moving Transit Forward.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
1/30/03 Page 1 Rescue Muni’s Recommendations for Geary Rapid Transit For PAR 1/30/2003.
Urban Road Pricing: US DOT Congestion Initiative and Urban Partnerships 14 th World Congress on ITS IBEC Special Session October 10, 2007 Beijing Exhibition.
The Transit “T” Craig Lamothe UPA Transit Project Manager City of Minneapolis City of Lakes Innovative Choices for Congestion Relief.
© 2007 Noblis, Inc. BUS RAPID TRANSIT AS A CATALYST FOR LAND USE CHANGE: THE ROUTE 1 CORRIDOR CASE STUDY 11th TRB National Transportation Planning Applications.
Transit Partnerships. Goal of Presentation Review the Transit Partnership Proposal Seek Ordinance Approval: –Authorizing the Mayor to submit Transit Partnership.
Bus Rapid Transit Infrastructure Design Roadway and Junctions Bus stops Shreya Gadepalli Senior Program Director Institute for transportation and.
Regional Priority Bus Transit Conference June 24, 2009.
Provo-Orem Bus Rapid Transit Project Update July 2013.
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
Where are you going for your summer holiday? airport How are you going there for your summer holiday?
US DOT Congestion Initiative Urban Partnership Agreements NTOC Summer Meeting September 7, 2007 Washington, DC Jeffrey F. Paniati Associate Administrator,
Left Lane Mixed-Traffic BRT August 22, 2012 Stefano Viggiano and Jack Gonsalves.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
DICK RUDDELL EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________.
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
CHAPTER 10 TRAFFIC SIGNALS AND PAVEMENT MARKINGS.
Geometric Design: General Concept CE331 Transportation Engineering.
Traffic Signs Part Two. What do these 2 signs tell you?
1 Bus Rapid Transit Strategic Plan May BRT Strategic Plan Evaluate feasibility and effectiveness of six BRT corridors Establish framework for.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
30 Stockton Transit Priority Project Chestnut November 10, 2015 Marina Community Association.
MODULE 3: PLANNING & DESIGN Lesson 2: Modal Characteristics and Impacts.
RTD Board Update October 8, 2013 US 36 Bus Rapid Transit.
The I-465 West Leg Reconstruction Project
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
Molly Kline, Project Manager
Work Zone Safety Review – District 1 - Duluth
Bus Rapid Transit Study
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Rules of the Road Chapter 10
Presentation transcript:

May 10, 2007 Presented by: Bill Ball, AICP and Joel Rey, P.E., AICP BRT To Maximize Person Capacity Within Limited ROW Using

Bus Rapid Transit High performance High level & quality of service Quality image Unique identity

Maximizing Capacity with BRT Investment Cost System Performance BRT Mixed traffic w/ signal priority Exclusive w/ signal priority Use of shoulders Use of existing medians Express bus Local bus Light rail Heavy rail Max Capacity in Existing ROW

Mixed Traffic BRT Mixed traffic Signal priority Queue jumps Bypass lanes Other BRT elements

Use of Existing Medians Wider corridors 1- or 2-way U.S. experience – Cleveland – Eugene Safety Concerns – Left turns – Passenger crossings

Bus Use of Shoulders 11+ projects in U.S. – Minneapolis – Seattle – Delaware – Miami – Lee County – Others TCRP Synthesis 64 Matanzas Pass Bridge to Ft. Myers Beach

Bus Use of Shoulders Minneapolis – 400 buses, 14 routes – 230 miles now – 300 miles (2007) Bypass congestion (<35 mph) Minimal signs No pavement markings