1 Best Management Practices Planning, Leasing, Permitting Jamie Connell BLM Northwest Colorado District Manager District Manager.

Slides:



Advertisements
Similar presentations
© Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry June 5, 2008.
Advertisements

NOTICE TO OPERATORS DRILLING WELLS WITHIN 3/4 MILE OF THE RIM OF THE ROAN PLATEAU IN GARFIELD COUNTY PIT DESIGN, CONSTRUCTION, AND MONITORING REQUIREMENTS.
WATER QUALITY ANALYSIS for ANTIDEGRADATION
U.S. Department of the Interior Bureau of Land Management Wildlife Management Updated: January 2013.
1 | US DOE Geothermal Programeere.energy.gov Public Service of Colorado Ponnequin Wind Farm Geothermal Technologies Program Categorical Exclusions Doug.
BLM - Utah Oil & Gas Program Overview BLM - Utah Oil & Gas Program Overview Utah Petroleum Association January 2014.
Oil and Gas Industry Presentation Activities, GHG Emission Sources, and Potential Reductions January 14, 2009.
AN M3 EAGLE LLC PROPOSAL. Acting Field Manager Coeur d’Alene Field Office (208)
Big Pond Tank Mobile, Reusable Construction/Frac-Water Storage.
Natural Gas Drilling Activities - A State Perspective Ryan Benefield, P.E. Deputy Director, Arkansas Department of Environmental Quality
By: Frank Filas, P.E. Environmental Manager Energy Fuels Resources Corporation 44 Union Blvd., Suite 600 Lakewood, Colorado Uranium Development in.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management June 2007.
BLM Bureau of Land Management Oil and Gas Permitting Process Expediting Oil and Gas Development in Western States Kent Hoffman.
Reduce Unnecessary Disturbance Part 3 U.S. Department of the Interior Bureau of Land Management November 2006.
MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING, MONITORING, AND RECLAIMING OPERATIONS MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING,
BLM New Mexico Texas Oklahoma Kansas Master Development Plan Carlsbad Field Office Natural Resource Specialist Team September 23, 2014.
U.S. Department of the Interior Bureau of Land Management Wildlife Management November 2006.
Oil and Gas Leasing Jim Albano – Lead Natural Resource Specialist Reservoir Management and Operations Section Montana State Office – (406)
Geothermal - Utah Program - General Program - General Areas of Geothermal Potential – Prospectively Valuable and Known Geothermal Resource Areas (KGRA)
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
Suzanne Macey.  DEC looks at known occurrences with 1 mile  FWS looks at known occurrences plus the potential for suitable habitat  Contact DEC and/or.
Final Reclamation Part 5 U.S. Department of the Interior Bureau of Land Management May 2006.
Bureau of Land Management NAIP Information Meeting July 19 th, 2006.
Jessi Brunson VFO BLM. Where do the Conservation Measures come from? & What do they say?
June 19, 2015 (Photo: Whistle Creek LWC). Meeting Agenda  10:00 Welcome; County Commissioners and Conservation District Supervisors and Staff, Ecosystem.
Environmental Assessment August 2012 Oil & Gas Lease Sale.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management May 2006.
SOUTH COAST RESOURCE MANAGEMENT PLAN REVISION BUREAU OF LAND MANAGEMENT Palm Springs-South Coast Field Office California Desert District.
Master Development Plans (MDPs) Oil and Gas Projects.
Managing Natural Gas & Oil Resources on Federal Lands on Federal Lands Colorado Bureau of Land Management.
U. S. Department of the Interior Bureau of Land Management Division of Fluid Minerals, 1.
Joe Vieira Project Manager BLM Colorado Renewable Energy Team 6/28/2011.
Visual Resource Management May 2015 Lander, Wyoming.
Chesapeake Energy Shale Operations Overview
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
Environmental Issues Associated with Oil and Natural Gas Extraction, Transport and Processing in the Marcellus and Utica Shale Region of Ohio Joe Bonnell,
EVALUATION TOPIC Coal Exploration Sites – Offsite Impacts and Reclamation Success.
Roan Plateau Proposed Plan Garfield County Energy Advisory Board Oct. 5, 2006.
Visual Resource Management May 2015 Lander, Wyoming.
Selecting the Right Site for New Nuclear Generation Southern Nuclear Operating Company Tom Moorer – Nuclear Development Environmental Manager.
1 Federal Oil and Gas Planning, NEPA, and Development Scott F. Archer USDI - Bureau of Land Management April 8, 2009.
La Center, Washington: Balancing Pipelines and Populations 1.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
Challenges and Opportunities for Increased Access to On-shore Federal Lands Natural Gas Technologies What’s New & What’s Next Orlando, FL January 30-February.
Proper Site Selection Part 2 U.S. Department of the Interior Bureau of Land Management May 2006.
Best Management Practice Information Sheets Updated: August 30, 2004 Contact: U.S. Department of the Interior Bureau.
Resource Management Plan (RMP) Revision for the Las Vegas and Pahrump Field Offices Muddy Mountains.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Introduction Part 1 U.S. Department of the Interior Bureau of Land Management May 2006.
U.S. Department of the Interior Bureau of Land Management Wildlife Management Updated: April 2009.
Introduction to BMPs U.S. Department of the Interior Bureau of Land Management May 2006.
1 Oil & Gas Activities on Public Lands Scott F. Archer USDI – BLM National Science & Technology Center April 3, 2007.
Thom KerrNovember 17, 2015 Colorado’s Continuous Adjustment to Unconventional Resource Development.
Cerrillos Hills Cell Tower Team Three: Sabrina Flores, Angela Wetz, Jane Sanderford, Bridget Clayton, Brenda Warner, and Jon Jasper Field Manager: Steve.
RESOURCE ADVISING IN SPECIAL MGMT. AREAS. TYPES OF SMA’S Designated Wilderness WSA - Wilderness Study Area National Monuments and similar areas Wild and.
Sec. XIII. Appeal Procedures Eliminating Dual Appeal Opportunities.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
The Sage-Grouse Plan Tripp Parks Policy Analyst. GREATER SAGE-GROUSE The Greater Sage-Grouse (GrSG) is a large ground-dwelling bird that inhabits 186.
Broomfield Development Plan Extraction Oil and Gas, Inc.
DNR Supplemental Budget 2016
Range Management in the Face of Climate Change
Environmental Impact Reviews In Oil & Gas Operations
Oil & Gas Activities on Public Lands
Construction Management & Inspection
SEQRA as a Tool to Review Energy Projects
Presentation transcript:

1 Best Management Practices Planning, Leasing, Permitting Jamie Connell BLM Northwest Colorado District Manager District Manager

BLM – Planning National Environmental Policy Act (NEPA) National Environmental Policy Act (NEPA) Federal Land Policy and Management Act (FLPMA) Federal Land Policy and Management Act (FLPMA) Foundation for sustainable resource decisions Foundation for sustainable resource decisions Balances competing use Balances competing use Basis for legally-defensible resource management decisions Basis for legally-defensible resource management decisions Timely implementation decisions Timely implementation decisions

Decision Types Decision Types 1. Resource Management Plan (RMP) - Designate Special Management Areas - Set resource goals & objective - Set resource goals & objective - Availability for Oil & gas, coal leasing - Availability for Oil & gas, coal leasing with appropriate stipulations with appropriate stipulations - Travel management - Land tenure adjustments - Wild & Scenic River Suitability 1. Resource Management Plan (RMP) - Designate Special Management Areas - Set resource goals & objective - Set resource goals & objective - Availability for Oil & gas, coal leasing - Availability for Oil & gas, coal leasing with appropriate stipulations with appropriate stipulations - Travel management - Land tenure adjustments - Wild & Scenic River Suitability

2. Activity/Implementation Plans - site specific detailed management plans - allotment management plans - oil and gas permitting with conditions of approval - recreation management plans 2. Activity/Implementation Plans - site specific detailed management plans - allotment management plans - oil and gas permitting with conditions of approval - recreation management plans

5 Glenwood Springs Field Office BLM Surface: 567,395 acres Federal Mineral Estate: 748,228 acres, plus 1.5 million acres of FS

Master Development Plans Plan for wells, production facilities, roads, and pipelines and mitigation Plan for wells, production facilities, roads, and pipelines and mitigation One NEPA analysis vs. multiple redundant processes and documents One NEPA analysis vs. multiple redundant processes and documents Proposed wells approved without additional NEPA Proposed wells approved without additional NEPA Additional wells approved using Statutory CX Additional wells approved using Statutory CX 6

7 Directional Drilling Multi-well locations Reduced well pad density Reduced road density Reduced road density Dual rig operations

Efficiency Drilling Rigs Smaller footprint Smaller footprint 22 wells per pad 22 wells per pad 75 % reduction in surface disturbance 75 % reduction in surface disturbance Reduced habitat fragmentation Reduced habitat fragmentation Expanded gas recovery in extreme topography Expanded gas recovery in extreme topography 8

9 Remote Frac/Centralized Production Tanks Fracing new wells from up to four miles away Use of temporary surface lines Centralized tanks serving 87 wells

10 Water Delivery Systems Temporary, poly water pipelines Delivers water for drilling and completions Eliminates water truck traffic and impacts

11 Clustered Development Compressor facility Two well locations 10 wells

12 Hydro ax/chipping Clearing heavy woodland corridors Fuel reduction, mgt Enhanced rehab Big game habitat mitigation

Pipeline Boring 13 Avoids steep slope construction Eliminates visual impacts

14 Off-site Production Facilities Production facilities located off well location Provide immediate production while other wells drilled Minimize well pad foot print

15 Camo Facility Paint Custom color patterns Minimize color contrast Maximize visual mitigation

16 Colorant Fired clay colorant Turf reinforcement mat Growth medium Water infiltration enhancer

17 Exhaust Stack Screens Migratory bird mitigation Prevents entry by birds Flat screens vs. cones Remote telemetry

18 Pit Netting Migratory bird mitigation Prevents bird entry More effective than flagging

19 CMP Containment “Berms” Metal containment areas Synthetic liners Leak proof/fail proof Load lines inside

Phased Development Roan Plateau Development limited to one geographic area at a time Development limited to one geographic area at a time Phasing to new area after fully developed and interim reclamation Phasing to new area after fully developed and interim reclamation Total surface disturbance limited to 1 percent acres available Total surface disturbance limited to 1 percent acres available 20

21 Temporary Reclamation Quick cover species Use of sterile hybrids Mulching Areas not subject to interim reclamation first yr Areas to be redisturbed

22 Interim Reclamation Grading, shaping cuts and fills Topsoiling Revegetating areas not needed for production operations

Wrap-up Questions, discussion, debate… 23