Jack Fowler Spain Workshop 2003 Faraday Shielding for Barrel TRT Jack Fowler Duke University Spain Workshop - 2003.

Slides:



Advertisements
Similar presentations
FDR 10/01 Jason Tarrant CLRC1 SCT EC Thermal Enclosure (TE) l Thermal Enclosure Function: »Make End-cap thermally neutral »Condensation free exterior »Containment.
Advertisements

Manufacturing Processes for a 4 Layer Multi-layer PCB Section through PCB Via hole SMD Pad The following presentation covers the main processes during.
Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Welding Details.
Clamp 6 LMTs flangestrap Barrel 3 clamps showing gaps - see next pics for solutions. Trials with various types of packing were made at Geneva Gap.
Slab constructed cup Flatten a lump of clay into a long shape as you will be rolling out a slab long enough to wrap around a tube form. Note: finished.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
IBL IST G&S Integration Ned Spencer, UCSC July 15, /15/11IBL IST G&S Integration1.
Update on Model/Mock Cavity Robyn Madrak 02/03/2015.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
One Way Circuits Limited Printed Circuit Board Manufacturer A Guide To Manufacturing Multilayer PCBs Use Left and Right Cursor keys to navigate ESC to.
3. Capacitance and dielectrics. 3 8 The potential difference between the plates of a 3 μ F capacitor is 100 V. How much energy is stored in.
AWG 36, 0.2 A 0.3 mm Heat Shrink Tubing t = 0.38 mm Silicone Coating t = 0.2 mm D = 3 mm Shielding: Copper Tape AWG 26, 2.2A 0.6 mm AWG 26, 2.2A 0.6 mm.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Volume of Rectangular Prisms
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
Kanwalpreet Kaur Communication subsystem & Integration subsystem.
Coil Cooling Workshop Summary June 10, Electrical Isolation: Cladding is isolated from the T by Kapton. The chill plates electrically connect at.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June 2002 Pre-series Low Mass Tapes 12 different lengths were produced for barrel.
1 QXF heater design: current status and the path forward M. Marchevsky (LBNL) 03/06/2014 D.W. Cheng, H. Felice, G. Sabbi (LBNL), G. Ambrosio (FNAL)
Status of CEPC Detector magnet
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
PLUG IN TO THE WIRELESS WORLD WISMO2D Shielding Parts Technology: metal sheet stamping and folding Frame : internal walls to isolate different RF areas.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
And now for something completely different First results from the DC-DC Stavelet Peter & Ashley with Giulio & John.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Glass slide Micropipettes Starting Materials Cut along dotted traces Plexiglas square (1.1” x 1.1”) 0.2” Interface reservoir sleeves Drummond 1-5-µL micropipette:
Evaluation of Modular Coil Cooldown Time with Thicker Insulation and Comparison of Original and Proposed Insulation Design H.M. Fan PPPL January 15, 2003.
Evaluation of Modular Coil Cooldown Time with Thicker Insulation and Comparison of Original and Proposed Insulation Design H.M. Fan PPPL January 14, 2003.
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
Spacing of Cu clamp = 10” Clamp plate width = 2.5”, thickness = 0.375” Thickness of conductor insulation = 0.03” Thickness of coil ground wrap = 0.03”
Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuse Boxes Chiho Wang Duke University.
Chiho Wang ATLAS TRT Barrel Duke University U. Penn. Workshop, 2000 Module Thermal Analysis Chiho Wang Duke University.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Irradiations at Birmingham cyclotron Procedure 1.
Module Radiation Length. Goals Estimate the expected radiation length of a module, based on the design and measurements on as-built modules Determine.
STAINED GLASS Basics  Stained glass, as an art and a craft, requires the artistic skill to conceive an appropriate and workable design, and the engineering.
Thermal jumble! (Action list review) C. Marinas IFIC-Valencia DEPFET-Valencia 1 Valencia
Soldering Basics.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
Teknologi Dan Rekayasa SHIELDED METAL ARC WELDING ADVANCE (SMAW) ADVANCE.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
Design of welded joints
No Solder Battery Interrupter
Service channels between Tracker and PP1
Service channels between Tracker and PP1
BSS Prep work at CERN and Acceptance of Parts
Jack Fowler Duke University Spain Workshop
Rocket Difficulty Time Approximately 30–35 minutes Art Deco Clock
SILICON PIXELS DETECTOR
TAS at IP1 Present situation and plans
Workshop Rotating Platform
Workshop Rotating Platform
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
Design of Distribution Feedbox at LHC P7
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Common termination methods:
Module/Ladder Assembly
Wire Diameter Variation
A circuit is the circular path that electricity flows through
SC1R Insulation Strategy
Rocket Stability Building a Test Rocket LabRat Scientific © 2018.
Single Detector Design
Presentation transcript:

Jack Fowler Spain Workshop 2003 Faraday Shielding for Barrel TRT Jack Fowler Duke University Spain Workshop

Jack Fowler Spain Workshop 2003 Inner Cylinder Shielding Inner cylinder will be coated with copper (35 micron) clad kapton (25 micron) (Total thickness 100 microns) Due to the material width, there will be 3 separate wraps The wraps will not overlap

Jack Fowler Spain Workshop st Prototype of Cylinder Epoxy (AY 103 / HY 991) will be applied to the surface of the cylinder at an average thickness of 100 microns We have measured a total thickness of epoxy and shielding material of 250 to 300 microns

Jack Fowler Spain Workshop 2003 Epoxy Application

Jack Fowler Spain Workshop 2003 Applying Copper/Kapton

Jack Fowler Spain Workshop 2003 Seams between wraps 3M Copper EMI Shielding Tape 1181 will be used to cover the seams of the wraps (66 microns thick total and 35 micron copper) The tape will be spot soldered at the joint to the shield. This will be done approximately every 20 cm along the length.

Jack Fowler Spain Workshop 2003 Cylinder with Shield

Jack Fowler Spain Workshop 2003 Inner Cylinder Summary Kapton coated copper will be epoxied onto the cylinder The seams will be covered using copper tape. These joints will also be soldered. Maximum thickness should not exceed 350 to 400 microns. We have 1 mm.

Jack Fowler Spain Workshop 2003 Space Frame Shielding The complete outer surface of the space frame will be covered with 3M Embossed Copper Foil Shielding Tape 1245 without tin plating (shown is tin plated) 100 microns thick / 35 micron Cu The cooling tube corners will not be covered

Jack Fowler Spain Workshop 2003 Tape coverage ~18 mm of the space frame in Z will be covered. The edge of the tape and frame will be coated with epoxy (AY103 /HY991) to prevent peeling

Jack Fowler Spain Workshop 2003 Soldered Joints All of the intersection points of the tape pieces will be spot soldered to ensure a long term electrical connection

Jack Fowler Spain Workshop 2003 Joining the Inner Cylinder to Space Frame The cylinder shielding will be applied within 0.5 mm of the area the space frame will occupy. Soldered connection will be made for each 1/32

Jack Fowler Spain Workshop 2003 Space Frame Summary Embossed Bare Copper tape will be used to shield the space frame The inner cylinder will be connected to the space frames by soldered connections.

Jack Fowler Spain Workshop 2003 Outer Cylinders The outer cylinder will be covered with the same copper/kapton material on the outer surface. The connection to the will most likely be made using tape around the outer corner.