US Army Corps of Engineers BUILDING STRONG ® Model Certification Jodi Staebell Operational Director, Ecosystem Restoration Planning Center of Expertise.

Slides:



Advertisements
Similar presentations
Managing Evaluations for Consistently High Quality American Evaluation Association Annual Conference Molly Hageboeck.
Advertisements

Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Corps of Engineers BUILDING STRONG ® Dam Safety Modification Studies Robert Taylor, P.E. Dam Safety Program Manager Great Lakes and Ohio River Division.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
ClosingExecuting/ Controlling ControllingPlanningInitiatingOpportunityAssessment Client AcceptancePlanning ApprovalInitiating ApprovalOpportunity Assessment.
Faculty & Staff Compensation Programs Board of Regents Meeting
March 8, 2011 Portfolio Analysis and Management System (PAMS) Briefing for the Fusion Energy Sciences Advisory Committee Linda G. Blevins, Office of the.
1 Phases & Impact on other Projects Definition and Scope –Relationship between Appraisal Policy/ Procedure, Technology and Management Overview, Components.
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Engineer Circular Requests to Alter USACE Projects
PowerPoint Presentation by Charlie Cook Copyright © 2004 South-Western. All rights reserved. Chapter 7 System Design and Implementation System Design and.
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Project Planning with the U.S. Army Corps of Engineers (USACE) Presenter Name Presenter Title.
Managing Project Procurement
Procurement Analyst Position Update Procurement Training Forum August 24, 2010.
Project Delivery Method Selection Guidance ACEC/WSDOT Annual Meeting June 11, 2015 Jeff Carpenter Director, WSDOT Construction Division.
SMART Feasibility Study Process
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration Review Processes Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration.
Project Management Process Overview
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
Module 27 Continuing Authorities Program Module 27 Continuing Authorities Program Civil Works Orientation Course - FY 11.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Compensation Project Faculty & Staff Compensation Programs Board of Regents Finance Committee Meeting Project Overview
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Interim Executive Director June  Financial Management Practices Audit Results Fiscal Year Audit Results Fiscal Year Internal.
US Army Corps of Engineers BUILDING STRONG ® PLANNING GUIDANCE Planning Principles & Procedures – FY11.
Policy and Guidance Update § Bruce Carlson Planning and Policy Compliance Division Directorate of Civil Works.
OREGON IDAHO WYOMING COLORADO NEVADA NEW MEXICO TEXAS UTAH ARIZONA CALIFORNIA US Army Corps of Engineers BUILDING STRONG ® And Taking Care Of People! Arroyo.
Text. #ICANN49 Data & Metrics for Policy Making Working Group Thursday 27 March 2014 – 08:00.
Project Life Cycle – Project Initiation © Ed Green Penn State University All Rights Reserved.
Get Your "Party" Started: Establishing a Successful Third-party Evaluation Martha Thurlow, Ph.D. & Vitaliy Shyyan, Ph.D.—National Center on Educational.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
US Army Corps of Engineers BUILDING STRONG ® Planning Products & Milestones Planning Principles & Procedures – FY11.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Proposal Pricing Training February 2004 Lance I. Stadler Pricing Manager, Corporate Headquarters Stanley Headquarters 300 North Washington Street, Suite.
NASA Update NDIA PMSC Quarterly Meeting February 4, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis Team)
Page 1 JUSTIFY define and validate REQUIRE- MENTS define initial management DOCUMENTS define INFRA- STRUCTURE allocated maintenance changes management.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® U.S. ARMY CORPS OF ENGINEERS CIVIL WORKS TRANSFORMATION: SMART PLANNING AND RESCOPING CHARETTES.
1 Cross-Cutting Issues 5310-JARC-New Freedom U.S. Department of Transportation Federal Transit Administration SAFETEAU-LU Curriculum August 7, 2007.
U.S. Department of Agriculture eGovernment Program eDeployment Kickoff August 26, 2003.
US Army Corps of Engineers Comprehensive Everglades Restoration Plan Master Recreation Plan.
The following training presentation is for all 1Prospect subcontract employees and is taken upon joining a contract or task order to which 1Prospect is.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
RECOVER Role/Science Guidance during Design, Construction and Implementation Phases RECOVER Science Meeting March 1, 2016.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
ERA Project Team Meeting Project Management Plan April 23, 2002.
US Army Corps of Engineers BUILDING STRONG ® 1 Inland Marine Transportation System Capital Investment Strategy Jeanine Hoey, PE, PMP Program Manager 15.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Principal Investigator ESTCP Selection Meeting
Overview of SB 191 Ensuring Quality Instruction through Educator Effectiveness Colorado Department of Education Updated: June 2012.
Processes and Procedures for Contracting at UO
Principal Investigator ESTCP Selection Meeting
Project Management Lifecycle Phases
Chesapeake Bay Program Budget & Finance Workgroup Meeting
Enterprise Content Management Owners Representative Contract Approval
CLINICAL INFORMATION SYSTEM
CIS12-3 IT Project Management
What is Project Cost Management?
Principal Investigator ESTCP Selection Meeting
Principal Investigator ESTCP Selection Meeting
System Safety Regulation
Standards Review Subcommittee Update
Step 3. Initiate Proposal
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Model Certification Jodi Staebell Operational Director, Ecosystem Restoration Planning Center of Expertise Rock Island, IL August 7, 2009

BUILDING STRONG ® Model Certification  Process to review, improve, validate analytical tools and models  Toolbox - Ensure high quality methods and tools available to enable informed decisions  Technical quality ► Theory ► Computational correctness  System Quality  Usability

BUILDING STRONG ®  Information Quality Act (PL )  OMB Information Quality Bulletin for Peer Review  Report of the Planning Models Improvement Task Force  Engineer Circular  Updated EC under development  Protocols for Certification of Planning Models  HQ Memo Policy Guidance on Certification of Ecosystem Output Models, Aug 08 Model Certification References

BUILDING STRONG ®  Definition - any model or analytical tool used to ► Define problems and opportunities ► Formulate alternatives ► Evaluate effects ► Support decision-making  Planning models, not engineering models  Review is cost-shared  In-house or contracted Model Certification Basics

BUILDING STRONG ® Stages of Model Development  Requirements stage  Development stage  External Testing  Implementation Model categories  Corporate  Regional/local  Commercial off-the-shelf  Models developed by others Model Basics

BUILDING STRONG ®  Provided by model proponent  Documentation includes ► Background ► Theory, assumptions, analytical requirements, formulas ► Software/hardware, testing/validation process, ► Availability of input data, usefulness to support project analysis, tech support, training  Software/spreadsheets also provided Model Documentation

BUILDING STRONG ®  Planner/Formulator  Functional Field Expert(s) (internal and/or external)  Software programmer/spreadsheet auditor Model Review Team

BUILDING STRONG ® Ecosystem Output Models Flowchart to Determine Level of Review IEPR required? Single use of multiple use model? Detailed model review is required. Yes Goal to recommend model for certification/ approval for use on future projects Goal to approve application of model on specific project Multiple Use Single Use Model Review $60-120k 7-10 months Single use or multiple use model? No Single Use ATR Team staffed and charged to conduct model review, supplement ATR team with outside experts, as appropriate Detailed model review is required. Multiple Use Model certified/ approved for use? No Yes ATR Team reviews model application Approved models include IWR Planning Suite and USFWS Published HSI ModelsUSFWS Published HSI Models

BUILDING STRONG ®  Develop Model Certification Plan  Assemble Review Team (In-house/Contract)  Charge to Reviewers  Kick-off Meeting  Conduct Review  Draft Model Review Report  Meeting to discuss findings  Final Model Review Report  Revise model, as needed (lather, rinse, repeat!)  PCX recommend that HQ certify model Model Certification Process

BUILDING STRONG ® District request PCX Model Review Model Review Process PCX assign Model Review Manager Model Review Plan approved by HQ Model Review Contract Executed Model Review Conducted Final Review Report submitted Model Review Plan Scope/Cost/Schedule/Method Scope of Work Independent Government Estimate Contractor Cost proposal Initial Findings Meeting held Draft Review Report submitted Draft Model Review Report Revised Model Documentation Final Model Review Report Model and model documentation revised as needed District MSC PCX Headquarters Review Group Recommend model for certification/approval for use? Model Documentation Published reports Table 2 information Model software or spreadsheet

BUILDING STRONG ® Model Review Process (continued) PCX recommend approval to HQ PCX posts approved model and documentation in PCX Toolbox HQ certify model/appro ve for use? Yes Model and model documentation revised as needed PCX memo describing model limitations submitted to MSC Recommend model for certification/approval for use? Yes No or District MSC PCX Headquarters Review Group

BUILDING STRONG ® Schedule  Start SOW to Notice to Proceed – 8-12 weeks  NTP to Final Model Review Report – weeks  Revise model – depends on PDT  PCX recommendation to HQ – 4 weeks  HQ review and certify - ? Timing  Requirements and/or development stage  Identify models at (prior to) Feasibility Scoping Meeting  Initiate model review prior to Alternative Formulations Briefing Scheduling and Timing

BUILDING STRONG ®  ATR – 3 reviewers extra time to review model  In-house - $30-50k  Contract - $80-140k  PCX labor ~$10-15k  Model proponent labor ► Prepare model documentation ► Assist in Model Cert contract ► Revise model and documentation Model Certification Cost

BUILDING STRONG ® 3 National models certified  IWR Planning Suite  Beach-FX  HEC-FDA All published USFWS Habitat Suitability Index models approved for use Many reviews of single use models Model Certification Experience

BUILDING STRONG ® ECO-PCX Model Reviews  Island Community Index Model, NAB  3 Everglades models  Upper Miss Fish Passage Effectiveness Index  Wetlands Value Assessment, MVN  Habitat Evaluation and Assessment Tools (HEAT) ERDC  Floodplain forest and wet coastal prairie community models, SWG  Des Plaines Community HSI and HGM, LRC  Arid Streams HGM, SPL  4 Ecological Models, MVM

BUILDING STRONG ® Available Models  Ecosystem Restoration Gateway, Tools Tab 

BUILDING STRONG ®

 Identify models early  Prepare model documentation  Test/validate model  Check software  Identify expertise needed  Be open to process  Pool funds for multiple-use models How can the model proponent help?

BUILDING STRONG ® Questions?Questions?