PHASED ACTIVITIES AND BASELINE DOC’s FOR UTIILITIES ACQUISITION BULK SERVICE LIF-CYCLE APPROACH IDENTIFICATION & ANALYSIS APPLICABLE TECHNOLOGY / RESEARCH.

Slides:



Advertisements
Similar presentations
AIR OPERATOR CERTIFICATION
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
PRESENTATION ON TURNKEY CONSTRUCTION.
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
New Mexico Infrastructure Finance Conference, October 28, 200.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
MTF Rail Development Forum
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Rail Safety Committee Mid Year Meeting December 2011
BAE SYSTEMS Overview of Systems Engineering at BAE SYSTEMS & ALENIA MARCONI SYSTEMS 8/10/2015/MS By Leigh Watton Friday 27th July 2001.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Project Management. Managing Capital Projects  What is a Project?  Something that: has a beginning and an end, and is carried out to meet established.
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
Oncor Electric Delivery Oncor Electric Delivery Restructure An Engineering & Construction Perspective SWEDE Conference May 11, 2007 San Antonio Mark Burt.
Dr. Hany Abd Elshakour 9/7/ :22 PM1. Dr. Hany Abd Elshakour 9/7/ :22 PM2 Engineering Project: Participants and Life Cycle.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
© Palaniappan R Kannan PMP.,CFSE 1 IEC Standard – What is it? IEC is a Standard for the functional safety of Electric / Electronic / Programmable.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Software Configuration Management
Section 2 Capital Project Life Cycle. PROJECT PHASES Project development تطوير المشروع Turn Over التسليم والضمان Detailed design التصميم التفصيلي Preliminary.
Tom MAZOUR IAEA, Division of Nuclear Power
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
Fluid Mechanics –I Surveying –I Mechanics of Solids Building Materials
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
Specification & Quantities Estimating
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Laura J. Weber Solid Waste Project Manager St. Regis Mohawk Tribe ITEP Tribal Transfer Station Course.
International Hotel Design and Development
PAGE 1 New Plant - CM Configuration Management For The Next Generation Of Nuclear Facilities Joseph Burack Consulting Engineer Configuration Management.
Handbook for Developing a Transportation Management Center Operations Manual Sponsored by the TMC Pooled-Fund Study Single.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
Thirdwave CaSPr Sustainable Construction In Universities and Colleges High Performance Buildings for Universities and Colleges: A Guide to Making the Case.
SOCCER WORLD CUP: NMBM NMBM PRESENTATION To the National Assembly The Joint Meeting of the Portfolio Committees on Provincial & Local Government.
Construction of a Transfer Station
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
1 1 Presenter / date if required Independent, integrated thinking.
Dr. Mohamed Riyazh Khan DoMS
Lecture(3) Sequence of Studies for a Single Major – Infrastructure Projects 1 A preliminary (or reconnaissance) report. 2 A feasibility report.
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
Conventional Facilities Jan Molander Design Manager Conventional Facilities December 10, 2013.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Construction and the Built Environment Diploma September 2006.
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
RCT Pvt Ltd (MULTIDISCIPLINARY CONSULTANCY COMPANY) PROFILE AND SERVICES OVERVIEW.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Phases of construction
Corporate Presentation
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Camera PDR/CD1 Planning 19 September 2008
Workshop Activity 1 (in groups – 4 students in each) – 15 minutes
Review From the previous chapter, we understand that maintenance policy stream down from corporate strategy. It has to be integrated with management so.
ChE 473K Plant Design R. Bruce Eldridge.
Safety and Security- From Assessment to Implementation
Manajemen Konstruksi Project Life Cycle
Controlling Project Cost and Schedule
Water & Environmental Affairs
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Stakeholder Engagement
Presentation transcript:

PHASED ACTIVITIES AND BASELINE DOC’s FOR UTIILITIES ACQUISITION BULK SERVICE LIF-CYCLE APPROACH IDENTIFICATION & ANALYSIS APPLICABLE TECHNOLOGY / RESEARCH PRELIMINARY STAGEPRE-IMPLEMENTATION STAGEIMPLEMENTATION STAGE MS1 RESIDENTS AND MC NEEDS & REQUIREMENTS DESIGN STANDARDS MS2 FEASIBILITY STUDY DETAIL DESIGN TENDER PROCESS CONSTRUCTION / INSTALLATIION COMMIS- SIONING & RETENTION OPERATION & MAINTENANCE SERVICE REQ. BL MS4MS5 MS3MS6 UPGRADING / MODIFICATION INVESTIGATION MS7MS8 % Demographic studies % Socio-economic studies % Land-use studies % Corridor studies % Routing & layout % Environmental studies % Routing & layout % Environmental studies % Geo-technical studies % Hydrological studies % Intermodal transport studies % Masterplan development % Expropriation of land (investigation on macro level) % Stakeholder involvement % Affordability and subsidy study NEED: (GENERAL) PHYSICAL PLANNING AND GPMC REQUIREMENTS / SERVICE DEFINITION Applicable and viable technology results STRUCTURE / DEVELOPMENT PLAN MASTER PLANS (BULK SERVICES) (RECENTLY UPDATED; AUTHORISATION FOR PROJECT): % Sewerage % Electricity % Solid waste % Water % Roads and Stormwater % Cemeteries % Sport grounds % Emergency services % Libraries % Houses, etc. UTILITY REQ. BL UTILITY SYST. FUNC. BL UTILITY PROC. BL UTILITY DET. DES. BL UTILITY AS BUILT BL 1 UTILITY AS BUILT BL 2 UTILITY AS & M BL Refer para service demand CURRENT TO 30 YEARS % Daily demand % Peak demand % Intermodal facility demand RESIDENT VALUE SYSTEM % Comfort % Convenience % Safety % Security % Affordability GPMC TECHNOLOGY CONCEPTS % Upgrade % Modification SUB-STRUCTURE OPERATIONAL CONCEPTS % Security % Safety % Client services % Information % Maintenance % Cleaning LABOUR BASED ACTIVITIES PROJECT EXECUTION % Turn key % Labour based % Emergency contractors STAKEHOLDER INVOLVEMENT STRATEGY BUDGET MOTIVATION % Goals % Target dates Project Req. Statement (as per para policy doc. FUNCTIONAL DESIGN: CONCEPTS WHICH CONFORM TO: % 30 year demand % Service requirements % Operational concepts % Upgrade strategy % Trade-off studies -30 year life-cycle costs -Cost-effectiveness SPECIFICATIONS: % System spec. % Functional layout drawings STANDARDS OPERATIONS AND MAINTENANCE PLANNING UPDATE REPORTS % Demographic studies % Socio-economic studies % Land-use studies % Transport studies % Corridor studies % Commuter studies % Routing & Layout % Environmental studies % Geo-technical studies % Hydrological studies % Services availability % Expropriation of land % Intermodal transport studies % Affordability and subsidy study % Stakeholder involvement % Conceptual design for construction method PRELIMINARY (OR BASIC PLANNING) DESIGN REPORT: -affordability in terms of available capital for commissioning and operation -Functionality -Environmental impact -Integer. With exist. Systems -Value for money -Client satisfaction -Economic life Detail architectural design Engineering design Structural design Electrical design Mechanical design Surveying Civil design GPMC / SS furnished item / product integration Service integration Integration Detail; specification Quantity surveying Operations and maintenance development Metro furnished item procurement planning Training plans Tender documents Design correspondence Design report Adjudication of tender documentation Tender report Construction GPMC / SS furnished item procurement and installation Testing Commissioning plan Procurement of operations and maintenance facilities and equipment Operations and maintenance planning Start-up planning Minutes Correspondence Completion reports As-built drawings Maintenance manual Operations manual Start-up plan Start-upOPS: Data Logging Maint: Data logging Cost: Data logging Service Audit Completion certificates MANAGEMENT INFORMATION: % Ops. Report % Maintenance report % Cost report Upgrade / Modification needs report SAACE Project Management Rev 4 Project Management Rev 3 Project Management Rev 5 Project Management Rev 6 Project Management Rev 2 Goals and budgets programme plan (K1 / K2) Project management Rev 1 (refer para 4.3) MC STRATEGIC PLANNING % Purpose % Goals % Objectives % Sub objectives

BULK SERVICE LIFE-CYCLE APPROACH: TECHNICAL REVIEWS BULK-SERVICE IDENTIFICATION & ANALYSIS PHASE APPLICABLE TECHNOLOGY / RESEARCH PHASE PRELIMINARY STAGEPRE-IMPLEMENTATION STAGE IMPLEMENTATION STAGE MS1 PROJECT BRIEF: RESIDENT AND MC NEEDS & REQUIREMENTS DESIGN STANDARDS PHASE MS2 FEASIBILITY STUDY PHASE DETAIL DESIGN PHASE TENDER PHASE CONSTRUCTION / INSTALLATIION PHASE COMMIS- SIONING PHASE OPERATION & MAINTENANCE PHASE SERVICE REQ. BL MS4MS5MS3 MS6 UPGRADING / MODIFICATION INVESTIGATION PHASE MS7MS8 UTILITY REQ. BL UTILITY SYST. FUNC. BL UTILITY PROC. BL UTILITY DET. DES. BL SERVICE REQUIREMENTS REVIEW Warranty & retention management UTILITY AS BUILT BL 1 UTILITY AS BUILT BL 2 UTILITY AS B & M BL PHASE OUT PHASE MS9 END OF LIFE BL PROJECT REQUIREMENTS REVIEW UTILITY SYSTEM DESIGN REVIEW PRELIMINARY DESIGN REVIEW CRITICAL DESIGN REVIEW TENDER ALLOCATION REVIEW PRELIMINARY QUALIFICATION REVIEW FORMAL QUALIFICATION REVIEW