ConSysTec 3 rd Israel ITS AnnualMeeting Israel ITS Architecture Development Rob Jaffe, Ph.D. President, ConSysTec Shenorock, NY USA.

Slides:



Advertisements
Similar presentations
Overview What is the National ITS Architecture? User Services
Advertisements

Vehicle-infrastructure integration: creating co-operative mobility systems and services Hearing EU Parliament, 22 January 2009 Hermann Meyer, CEO.
Course: e-Governance Project Lifecycle Day 1
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
Chapter 2 – Software Processes
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Green Software Engineering Sheryl John Introducing green elements and guidelines in Software Engineering.
Chapter 6: Design of Expert Systems
R R R CSE870: Advanced Software Engineering (Cheng): Intro to Software Engineering1 Advanced Software Engineering Dr. Cheng Overview of Software Engineering.
Urban landbuilding facilitiestransportation networkssystems technology National and Regional ITS Architectures Bart Cima, IBI Group February 26, 2007.
Ch7: Software Production Process. 1 Questions  What is the life cycle of a software product?  Why do we need software process models?  What are the.
Office of Research and Information Technology Wireless Roadside Inspection Pilot Tests Chris Flanigan FMCSA/Office of Analysis, Research, and Technology.
中国智能运输系统体系框架 National ITS System Architecture of China 全国智能运输系统专家委员会 National ITS Committee of Experts.
Traffic Signal Standards. History Chaos NEMA (TS 1) 170 (CALTRANS / NY) 170E i NEMA TS ATC 2070N Memory Plug-in Others... Electromechanical.
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
Release & Deployment ITIL Version 3
What is ITS ? Intelligent Transportation System (ITS) means electronics, communications, or information processing used singly or in combination: to enhance.
“Here’s why you need the new wheels, too…” Shawn and Steve Image from
Update on MOITS Strategic Plan Development Andrew J. Meese, AICP COG/TPB Staff MOITS Technical Subcommittee September 9, 2008 Item # 5.
1 State of Good Repair Research Vincent Valdes Associate Administrator for Research, Demonstration, and Innovation July 9, 2009.
GeoResources Institute Spatial Technologies for Freight Transportation Efficiency, Planning, and Safety Chuck O’Hara, Ph.D. Associate.
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
Envisioned Role for NTI Concerning ITS Deployment in Egypt by Dr. Mahmoud EL-HADIDI Professor of Telecommunications at Cairo U & Consultant at NTI 3 rd.
Business Systems Development SDLC and introduction to the Microsoft Solutions Framework Team and Process Models.
Role of the Highway-Rail Intersection in the National ITS Architecture IEEE WG14 June 20, 2000 Bruce Eisenhart Lockheed Martin Architecture Development.
National ITS Architecture Update Research and Innovative Technology Administration ITS Joint Program Office Professional Capacity Building Program Talking.
©Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 6 Slide 1 Requirements Engineering Processes l Processes used to discover, analyse and.
Border Information Flow Architecture Pilot Project Funding Program Transportation Border Working Group, Québec October 27, 2010.
Reducing ITS Project Risk By using and developing consensus based regional ITS architecture and a systems engineering process Robert S. Jaffe, Ph.D., CSEP.
EB Workshop on eSafety Conclusions. 2 How do you interpret the CEDR vision with regards to your national approach? Basically in line with national strategy.
Installation and Maintenance of Health IT Systems
USDOT, RITA RITA: Oversight of USDOT’s R&D programs  University Transportation Centers $100M  UTC Consortia $80M  UTC Multimodal R&D $40M  Intelligent.
Kelly J. Harris SEARCH Deputy Executive Director
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
ITS Program Update Moving Towards Implementation of Wireless Connectivity in Surface Transportation Talking Freight Webinar January 19, 2011.
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
Basic of Project and Project Management Presentation.
1 IntelliDrive SM Research Program Shelley Row Director, ITS Joint Program Office Research and Innovative Technology Administration U.S. Department of.
TBWG Meeting Burlington, Vermont National ITS Architecture June 10, 2003.
Database Administration COMSATS INSTITUTE OF INFORMATION TECHNOLOGY, VEHARI.
Quality Activity Matrix Presented by Sandra Toalston President, SanSeek 1.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
Enterprise Systems Architectures EGN 5621 Enterprise Systems Collaboration (Professional MSEM) Fall, 2012.
Traffic Management Transit Management Emergency Management Fixed Point-to-Fixed Point Communications Roadway Toll Administration Remote Traveler Support.
Lecture Introduction to Software Development SW Engg. Development Process Instructor :Muhammad Janas khan Thursday, September.
Lecture 2 –Approaches to Systems Development Method 10/9/15 1.
Security and the National ITS Architecture ITS America 2003 Session 19: The State of the Practice: ITS and Homeland Security May 19, 2003 Minneapolis,
Chapter 2 – Software Processes Lecture 1 Chapter 2 Software Processes1.
Traffic Management Transit Management Emergency Management Fixed Point-to-Fixed Point Communications Roadway Toll Administration Remote Traveler Support.
National ITS Architecture Update ITS Joint Program Office Professional Capacity Building Program Talking Technology and Transportation (T3) Presentation.
Connected Vehicles Workforce FHWA Vehicle-to-Infrastructure
Stakeholders Meeting in Addis Ababa October 26, 2012 SSATP Progress Report Urban Transport – Mobility & Accessibility Cluster.
Software Engineering Lecture # 1.
Software Testing and Software Quality Assurance Process.
China Standardization activities of ITS China National ITS Standardization Technical Committee Research Institute of highway, MOT YangQi
1 Overview of Maintenance CPRE 416-Software Evolution and Maintenance-Lecture 3.
1 The Requirements Problem Chapter 1. 2 Standish Group Research Research paper at:  php (1994)
ITS ePrimer Module 2: Systems Engineering September 2013 Intelligent Transportation Systems Joint Program Office Research and Innovative Technology Administration,
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Engineering College, Tuwa. Design Engineering 1 - B  Guided by, SUBMITTED BY, PRAGNESH PATEL SHAH HETAXI ( ) RAJPUT VIVEK ( ) SOLANKI.
1 USDOT Next Generation Initiative Laurie Flaherty EMS Division, NHTSA.
Traffic Management Transit Management Emergency Management Fixed Point-to-Fixed Point Communications Roadway Toll Administration Remote Traveler Support.
Review of Definitions Software life cycle: –Set of activities and their relationships to each other to support the development of a software system Software.
 The processes used for RE vary widely depending on the application domain, the people involved and the organisation developing the requirements.  However,
Transportation Technology: An Inevitable Solution to Climate Change Cascadia Discovery Institute September 4, 2008 Scott Belcher President and CEO Intelligent.
Managing the Project Lifecycle
Requirements Engineering Process
IEEE Std 1074: Standard for Software Lifecycle
ARC-IT Training June 2017 ARC-IT Training
System architecture, Def.
Presentation transcript:

ConSysTec 3 rd Israel ITS AnnualMeeting Israel ITS Architecture Development Rob Jaffe, Ph.D. President, ConSysTec Shenorock, NY USA

3 rd Israel ITS ArchitectureWorkshop ConSysTec 2 What is ITS? Intelligent Transportation System Could be: Integrated Transportation System One Definition: “The application of data processing and data communications to surface transportation, to increase safety and efficiency.”

3 rd Israel ITS AnnualMeeting ConSysTec 3 Systems Engineering (SE) We practice SE to Reduce the Risk of: –Cost/Schedule Overage –Building the Wrong System ITS Architecture is the first step of SE

3 rd Israel ITS ArchitectureWorkshop ConSysTec 4 System Validation Concept of Operations Systems Engineering Project Lifecycle Time Line Decomposition and Definition Integration and Recomposition System Requirements System Verification/ Deployment Subsystem Verification Unit / Device Testing High-Level Design Detailed Design Software / Hardware Development Field Installation System Validation Plan System Verification Plan (System Acceptance) Subsystem Verification Plan (Subsystem Acceptance) Unit / Device Test Plan Implementation Document/Approval Operations and Maintenance Changes and Upgrades Retirement/ Replacement System Validation Regional Architecture(s) Feasibility Study / Concept Exploration Concept of Operations

3 rd Israel ITS AnnualMeeting ConSysTec 5 Cost of Correcting System Defects Phase that Defect is Corrected Phase that Defect is Created ConOps Requirements Design Construction 1x ConOpsRequirementsDesignConstructionO&M 100x+ Cost to Correct Fix It Here (Adapted from McConnel, Steve, “Code Complete”)

3 rd Israel ITS AnnualMeeting ConSysTec 6 ITS Architecture is a Consensus Institutional Architecture Needs and Services to meet the needs Stakeholders: –Their Roles and Responsibilities and –Their ITS Elements Information Flows between ITS elements to do services ITS Standards selected to encode the information flows ITS Element Functional Requirements to issue and receive the information flows Agreements required between ITS stakeholders Technology Neutral Must be a Consensus ITS Architecture

3 rd Israel ITS ArchitectureWorkshop ConSysTec 7 Concept of Operations System Requirements High-Level Design Architecture Use in Project Development Step by Step Regional ITS Architecture Detailed Design

3 rd Israel ITS AnnualMeeting 8 Project Critical Success Factors - From a Standish Group Report Project Success FactorsSuccess Points 1. User Involvement19 2. Executive Management Support16 3. Clear Statement of Requirements15 4. Proper Planning11 5. Realistic Expectations10 6. Smaller Project Milestones9 7. Competent Staff8 8. Ownership6 9. Clear Vision & Objectives3 10. Hard-Working, Focused Staff3 Total100%

3 rd Israel ITS AnnualMeeting 9 Contribution of ITS Architecture and Systems Engineering to Project Success Project Success FactorsPointsSuccess Potential of Your Project Yes = Add Points Value; No = 0 1. User Involvement19ITS Architecture: Involves all stakeholders 2. Executive Management Support 16ITS Architecture: Involves Executive Mgmt. & Policy Makers 3. Clear Statement of Requirements 15Systems Engineering: Requirements Mgmt. 4. Proper Planning11ITS Architecture & Systems Engineering: Planning throughout Project Life-Cycle 5. Realistic Expectations0Project Specific 6. Smaller Project Milestones 0 Project Specific 7. Competent Staff 0 Project Specific 8. Ownership 0 Project Specific 9. Clear Vision & Objectives0Project Specific 10. Hard-Working, Focused Staff 0Project Specific Total61%

3 rd Israel ITS AnnualMeeting ConSysTec 10 ITS Framework: A Regional Architecture Traffic Information Request for Traffic Information Travelers Emergency Service Providers Transit Traffic I-93 Closed at Decatur Blvd.

3 rd Israel ITS AnnualMeeting ConSysTec 11 Framework/Regional/Project ITS Architectures & Standards US National ITS Architecture Israel ITS Architecture Selected ITS Standards Project Architectures Other National ITS Architectures (e.g. Canadian) PhysicalLogical Other ITS Standards (e.g. CEN)

3 rd Israel ITS ArchitectureWorkshop ConSysTec 12 National ITS Architecture is a “Living Document” Continuing evolution of the architecture over 10 years Continuing evolution of the architecture over 10 years Version 6.0 continues support for ITS technical evolution and deployment Version 6.0 continues support for ITS technical evolution and deployment MCO Ver User Services Phase I & II Development Architecture Published HRI ADUS Ver Ver 2.0 Transportation Security Ver Version

3 rd Israel ITS ArchitectureWorkshop ConSysTec 13 Subsystem Diagram Vehicles Field Centers Commercial Vehicle Administration Archived Data Management Travelers Toll Administration Emergency Management Traffic Management Fleet and Freight Management Transit Management Maintenance & Construction Management Roadway Parking Management Emissions Management Personal Information Access Remote Traveler Support Information Service Provider Commercial Vehicle Check Vehicle to Vehicle Communications Wide Area Wireless (Mobile) Communications Vehicle Transit Vehicle Commercial Vehicle Emergency Vehicle Maintenance & Construction Vehicle Security Monitoring Dedicated Short Range Communications Toll Collection Fixed-Point to Fixed-Point Communications

3 rd Israel ITS AnnualMeeting ConSysTec 14 Regional ITS Architecture Layers Communications Layer How information transferred between ITS elements Communications Transportation Institutional Institutional Layer Policy, Relationships, Strategies Transportation Layer What information is transferred between ITS elements

3 rd Israel ITS ArchitectureWorkshop ConSysTec 15 Development Process Top Down – MOT Leadership –Identification of customization at the Framework Level –Policy Development and Implementation Bottom Up – ITS Israel Leadership –Work with Stakeholders to Develop their Projects using the ITS Architecture Methodology –Build Stakeholder Consensus

3 rd Israel ITS ArchitectureWorkshop ConSysTec 16 What ITS Israel Has Done With Stakeholders (So Far) Nov 2007 and July 2008: Two 2-Day Workshops: ITS Architecture and its use in Systems Engineering Full Stakeholder Workshops July and September: –Ayalon Highway –Haifa Municipality Short Discussions –Driver Improvement Technology –Advanced Traveler Information (Private Sector) –Transit with Israeli Institute of Standards –Tel Aviv Projected Metropolitan TCC –METRONIT – Transit Project –Carmel Tunnels Project –Highway 6

3 rd Israel ITS AnnualMeeting ConSysTec 17

3 rd Israel ITS AnnualMeeting ConSysTec 18

3 rd Israel ITS AnnualMeeting ConSysTec 19

3 rd Israel ITS AnnualMeeting ConSysTec 20

3 rd Israel ITS AnnualMeeting ConSysTec 21

3 rd Israel ITS AnnualMeeting ConSysTec 22

3 rd Israel ITS AnnualMeeting ConSysTec 23

3 rd Israel ITS AnnualMeeting ConSysTec 24 Forward Plan This is methodology is now available Contact ITS Israel (Eran Reuveni) –To participate and –Gain the benefits: Integration with your peers Reduced risk of cost/schedule overrun Produce ITS products that meet user expectations

3 rd Israel ITS AnnualMeeting ConSysTec 25 Thank You! Rob Jaffe, Ph.D. President, ConSysTec Shenorock, NY USA Consensus Systems Technologies (“ConSysTec”)