MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date: 2015-09-07.

Slides:



Advertisements
Similar presentations
Joint Legal/Participation Ad-Hoc 21 March 2012 Report.
Advertisements

IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: IEEE Down Selection Process Date Submitted: January 18, 2005.
Release 2: Work Items best practices Group Name: TP15 Source: Scarrone Enrico, Telecom Italia Meeting Date:
Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 1 PARTNERSHIP PROJECT DESCRIPTION During the meeting held in Copenhagen, 2.
Methods Of Work Ad hoc Report TP#11 Source: Enrico Scarrone, Telecom Italia, Meeting Date:
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
M2M Global Initiative OneM2M April 24, 2012
Progressing the Work on the MAS TR-0006, TR-0007 Group Name: Management Abstraction and Semantics Source: Tim Carey, ALU,
Report of Methods and Procedures Subcommittee Group Name: Steering Committee Source: Laurent Laporte, Sprint, Meeting Date:
Doc.: IEEE Submission March 2004 Tom Siep, TMS ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)
Joint ITU-T and ISO/IEC JTC 1 Leadership Meeting Accessibility Alex Li ISO/IEC JTC 1 SWG-Accessibility Convenor 2011 San Diego.
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AS 18 March 2014 Authors: NameCompanyPhone .
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
9-Oct-03D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security (Report from the LCG Security Group) FNAL 9 October 2003 David Kelsey CCLRC/RAL, UK
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
MoW&M&P Report Group Name: TP18 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
Summary of main questions on the Partnership Agreement and the secretariat support.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Liaison Report – Work Related to Date Submitted:
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
Doc.: IEEE /0281r1 Submission James D. Allen (Appairent Technologies, Inc.) Project: IEEE P Working Group for Wireless Personal Area Networks.
UPDATE ON GAVI ALLIANCE, THE GLOBAL FUND AND WORLD BANK COLLABORATIVE EFFORT FOR MORE EFFECTIVE HSS SEPTEMBER, 2009 Exploring a potential common platform.
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AB 20 March 2014 Authors: NameCompanyPhone .
MoW Report Group Name: TP21 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
WG1 status report to TP#20 Group Name: oneM2M TP20 Source: Joerg Swetina (NEC) Meeting Date: to Agenda Item: TP#19, Item 10.4, Reports.
TP WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO,
Technical Plenary Terms for the collaboration with P2413 From: oneM2M TP Chair Source: Meeting Date: Agenda Item:
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
Methods of Work Report Group Name: TP#10 Source: Enrico Scarrone, Telecom Italia, Meeting.
MoW Report Group Name: TP20 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
Doc.: IEEE /1454r0 Submission Jan 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 15 January 2013 Haasz et al, IEEESlide.
31 January Table of Contents (1) 3- Draft Partnership Project Description22- The Partnership Project Agreement (1)3- Draft Partnership Project Description22-
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Release Timeline Discussion R2 and beyond
WPM ad-hoc group report TP#25
Project: IEEE P Coexistence TAG
Alignment of Part 4B with ISAE 3000
Office of Grant Resources
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
FGDC Metadata Working Group Meeting
Memorandum of Understanding
Liaison Report from Date: September 20, 2012 September 2012
Proposed TGv Selection Process
IEEE MEDIA INDEPENDENT HANDOVER DCN:
What is a CA document? Date: Authors: March 2005 March 2005
IEEE MEDIA INDEPENDENT HANDOVER DCN:
IEEE 802 2nd Vice Chair last name at ieee dot org
IEEE 802 2nd Vice Chair last name at ieee dot org
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Proposed TGv Selection Process
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Update of PWG Process and IP Policy
Formalizing the Wireless Chair’s Meeting
Alignment of Part 4B with ISAE 3000
SAE Standards Works Training Module - Useful Tabs
Presentation transcript:

MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:

MoW Activities – 3 calls held from the last SC meeting jointly with M&P – MoW activity was concentrated to give guidelines about the transition workflow among subsequent releases, in particular the relation about the 3-stages starting date relations. The result is included as a new sectionat the end of the updated MoW in TP (v1.3.2), presented for approval at this TP 19. © 2015 oneM2M Partners REQ MOW_report_with_WG1_considerations 2

Guidelines When adopting a 3-stages approach developing a specification release it is necessary to concentrate the effort of the specific stage under development, and to develop each new requirement, new functionality and new protocol on consistent basis. The following guidelines are therefore given to govern the workflow among subsequent releases development (Release x+1 respect to Release x): Release x+1 stage 1 normative work cannot be initiated before the freezing of Release x stage 3 Release x+1 stage 2 normative work cannot be initiated before the ratification of Release-x Non normative work on stage 1 of Release x+1 can be performed at any time of Release x Non normative work on stage 2 Rel x+1 can be performed after the freezing of stage 3 Release x Testing is seen as an independent process not directly linked to the 3 stages model. These guidelines are general principles for all the Releases, the TP may decide different timelines for a specific release based on identified needs/opportunities. © 2015 oneM2M Partners REQ MOW_report_with_WG1_considerations3

WG1 considerations Release x+1 stage 1 normative work cannot be initiated before the freezing of Release x stage 3 Non normative work on stage 1 of Release x+1 can be performed at any time of Release x This gives the flexibility to perform non normative work to prepare stage 1 for future releases while stage 2 and 3 are under normative development. Examples of potential examples/solutions are: - Continue to develop use case, which should contain potential new requirements for oneM2M - Create a new TR “potential requirement for future releases” © 2015 oneM2M Partners REQ MOW_report_with_WG1_considerations4

M&P Activities – Update of M&P DRAFTING RULES -submitted for approval at SC 27 (SC ) but sent back for revision, planned to be submitted at TP 28 (30 th of September).SC Editorial updates – adding TSDSI, change copyright date. Removal of the mathematical formulae print screens as this option is no longer available in MS Word, Updated paragraphs to remove the possibility of hanging paragraphs Clarifications on normative references and editors notes Added information on Test Methods descriptions Updated the definitions, to assure that the definitions are identified with a capital initial letter © 2015 oneM2M Partners REQ MOW_report_with_WG1_considerations5

M&P Activities – New partner type for member based organizations - current understanding: 1) A new type of partnership for member based organizations and government agencies (PT3, or associated partners as appropriate) 2) No financial and IPR obligations 3) No possibility of direct technical contribution for the organization and its members (still possible to collaborate via liaisons and have contribution via oneM2M members/PT2) 4) No need to sign the PA (separate document or , as appropriate) 5) No rights of vote at SC and TP 6) Rights to attend TP and SC 7) PT3 needs to be approved by SC 8) No need for PT1 and PT2 to sign again the PA, the approval is made during SC meetings or by 9) The PT3 have the right to refer to oneM2M in their document in their Webste, etc. partnership 10) The PT3 have the obligation to agree on the principle of oneM2M as described in the PA and support actively the promotion and visibility of oneM2M. © 2015 oneM2M REQ MOW_report_with_WG1_considerations 6

M&P Activities – New partner type for member based organizations -open issues 1) Clarification of requirements (which are re potential interested organizations?, what are their expectations?) 2) Is there a real difference respect to the rights/obligations of associated members? 3) A new type of membership (e.g. sponsor members) could be enough? © 2015 oneM2M REQ MOW_report_with_WG1_considerations 7

Future planned work – Next calls jointly with MoW: 14 September 1015 ( Focus on new partner type) 21 September 1015 ( Focus on capitalization of definitions) Other two calls before TP20 are foreseen.. © 2015 oneM2M Partners REQ MOW_report_with_WG1_considerations