Who we are Orrix Homes Jeremy Laviolette Dylan Kugler Board of Directors John Giesbrecht Rick Kugler.

Slides:



Advertisements
Similar presentations
Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
Advertisements

The process whereby human beings convert raw materials into finished products or useful goods designed to make ____ product ______ one on-site.
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Putting Houses on the Path to Lower Energy Consumption. Awareness and Long term planning helps to maximize energy opportunities.
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 10 Improvement Analysis.
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Introduction to Mutual Self-Help Housing Created by NCALL Research, Inc. Updated October 2007.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Civil Engineering & Architecture 2.3 Residential Design.
Energy Rating Index Performance Path Speaker Name Speaker Affiliation.
G. H. Schettler House Case Study © Robert. A. Young All rights reserved.
Construction Drawings for Graphic Communication A building or construction project requires a complete set of specialised drawings. These drawings are.
Single Family Homes in the Shenandoah Valley Va, Florence Ave Waynesboro, Class Sq.Ft. Zip 244.
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Kristen Lyons. + Who are we? + Target Market ✖ ★ ★ ★ ★ ★ ★ ★ ★ ★ ★ ✖ ★ ★ ★ ★ ✖
IET 120 CONSTRUCTION PROJECT Name: David Marcum. Dwelling  Number of Floors 2 Place image of your floor plan in this space.
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Dave Brake, Darren Adams, Sean Tobin Charmaine Dean, Jessie MacDonald.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
How to build a two storey house
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 11 Improvement Analysis.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Building Green Lesson 1 – Green Architecture © 2012 Project Lead The Way, Inc.Green Architecture.
Smart Fitness Routine, Recover, Relax. What we offer? Healthy LifestylePhysical Well-beingSocial Aspect.
© OnCourse Learning. All Rights Reserved. Basic House Construction Learning Objectives  List the primary styles of residential architecture  Describe.
Renovating a Foreclosed Property versus Buying Prime Real-estate Jonathan Lee,Jimmy Luong,Vincent Rodriguez, Bryan Vine Team #5.
BUDGET PROPOSAL FROM YEAR 1 TO YEAR 5
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
Building Plans.
Allison Morrow’s Senior Project 5/18/15 – 6/9/15.
Brockton Redevelopment Authority The BRA is a quasi-public agency contracted by the City of Brockton that is tasked with community development and economic.
Vereco Homes Smart Green. What do we do?  Design and supply net-zero homes at affordable prices  What does “ net-zero ” mean?
Explain the benefits of exterior home care Analyze home maintenance techniques.
CASE CREATIONS JUANITA WOLFE. WHAT IS CASE CREATIONS?
+ Parkview Personal Care Home Micheline Gaudet. + Welcome Home.
Buffington Homes Homebuilding 101. Homebuilding 101 Topics About Buffington Homes. Our Customer Touch Points. Construction Process. Warranty Process.
5 Steps to Clear Communication. David Lupberger
Emmaus House of Saginaw 733 S. 14 th Street, Saginaw, MI The name “Emmaus” is from the Bible, Luke 24: In the Bible, it designates the.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Architectural Drafting Mr. Higgins
Orthographic Drawings
Building Your Future with Mountain Peak Homes Corinne T. Moritz Bella Vista Subdivision, Mountain Peak Homes1.
PH Building Assessment Buildings 25,70, 155, 166 and 187 Safety Analysis.
Turtle Creek Apartment Project Update Able Construction September 15, 1999.
JLC CONSTRUCTION FIELD GUIDE The most comprehensive and trusted reference guide to best practices for the construction market ANY TIME. ANY PLACE. ANY.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Administration Offices Proposed by: Wyatt Marvin and Mitch Sander.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
Construction Planning
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
Foundations of Technology Construction
Tavis Karnes.
203(k) Renovation Financing
Major Steps In Building a SFR
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Universitas Komputer Indonesia
Construction Drawings for Graphic Communication
“THE BOBCAT DEN” Tiny House ARI Grant
التقييم المالي للمشروع
10 The Cost Approach—Part I: Reproduction/Replacement Cost
House Construction Budget Plan
Ltd. “RV BLOKS” IDEA DESCRIPTION.
New White Lake Township Library
Foundations of Technology Construction
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
Housing Rehabilitation Program
© OnCourse Learning.
Presentation transcript:

Who we are Orrix Homes Jeremy Laviolette Dylan Kugler Board of Directors John Giesbrecht Rick Kugler

Marketing

Production Process Foundation - 7 days Framing, Windows, Doors & Roof - 21 days Plumbing Rough Ins - 14 days Electrical Rough Ins - 14 days Heating & Cooling - 14 days Insulation & Drywall - 5 days Finish Exterior Walls - 5 days Painting & Flooring - 5 days Kitchen & Bathrooms - 10 days Contractors will finish all lighting, plumbing - 4 days Touch Ups - 1 week

Competition 59 Construction Companies Pure Developments Lexis Homes North Prairie Developments

1 st Key Factor Sensitivity Analysis Customers/ye ar Average 5 Year Income Net Payback Internal Rate of Return 1(182,151)(1,745,980)- 2(30,850)(481,052)37% 386,646592,568224% 4191,8171,509,393245%

2 nd Key Factor Sensitivity Analysis Full time Staff/year First Year Income Average 5 year Income Net Payback IRR 114,600195,5871,685,519216% 2(29,167)179,4901,563,008188% 3(75,116)157,4901,410,712154% 4(121,064)124,5021,204,021117% 5(167,013)85,068882,67379%

Financials Feasibility Internal rate of Return 216% Non-leveraged IRR 44% 5 year Net Income $195,587 Net Payback 1,685,593

Market Price

Equity Holders Compensation

Terminal Value 1,000,018 Terminal Value

Target Market High income families or individuals