Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.

Slides:



Advertisements
Similar presentations
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Advertisements

PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
Near Term* Plans for the Fermilab Proton Source Eric Prebys FNAL Accelerator Division *Near term = “prior to proton driver”
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 Accelerator upgrades for NuMI Robert Zwaska Fermilab August 6, 2006 NBI 2006.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
Commissioning of the Fermilab Accelerators for NuMI Operation Robert Zwaska University of Texas at Austin NBI 2003 November 7, 2003.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Run II DOE Review - Booster Eric Prebys Booster Group Leader FNAL Beams Division.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F Project X Overview Dave McGinnis October 12, 2007.
Proton Planning Eric Prebys FNAL Accelerator Division.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Diagnostics in the Fermilab Proton Source (Linac + Booster) Eric Prebys FNAL Beams Division.
Check lists to mouse clicks Automation Session : WAO The Fermi National Accelerator Laboratory is a U.S. Department of Energy (DOE) research laboratory,
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
F Proton Plan Eric Prebys and Ioanis Kourbanis, FNAL Accelerator Division.
MiniBooNE Meeting 4/22/05 Eric Prebys 1 Status of the Proton Source Haud ignota loquor* Eric Prebys *I say things that are known.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Source 1/12/07 E Prebys 1 Proton Delivery Because MiniBooNE is off.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Accelerator Status and Plans
Proton Improvement Plan Overview Bob Webber July 13, 2011.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
Proton Plan Expectations Eric Prebys AD/Proton Source.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Source July 21, 2006 E Prebys 1 Proton Plan Meeting Agenda:  Review of parameter list: Prebys, Kourbanis  Status of writing assignments Prebys,
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Toward a Proton Plan Eric Prebys Fermilab Accelerator Division.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
PAC Meeting, December 12, Prebys 1 The Problem.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Proton Plan Eric Prebys, FNAL Accelerator Division.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
Proton Plan 1/10/07 E Prebys 1 Proton Plan Meeting Agenda:  Project/campaign reorganization: Prebys  Status updates: all  Booster Water Proposal: Cooper.
Proton Economics Eric Prebys FNAL Accelerator Division.
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
Proton Plan (short version) (BEAMS-DOC-1441) Eric Prebys, FNAL Accelerator Division.
Presentation transcript:

Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys

Proton Study Meeting 4/19/05 Eric Prebys 2 Charge Develop a plan for a set of upgrades and operational improvements to maximize proton delivery to:  NuMI beamline (120 GeV from MI)  Booster Neutrino Beam (BNB) (8 GeV from Booster) Goal: complete the upgrades over the next 3 years, and operate through 2015 or beyond Note: this plan precedes the Proton Driver replacement of the existing Proton Source (Linac+Booster) Develop the budget and timeline for these improvements Estimate projected proton delivery (PoT) to both beam lines

Proton Study Meeting 4/19/05 Eric Prebys 3 Limits to Proton Intensity Total proton rate from Proton Source (Linac+Booster):  Booster batch size Typical ~5E12 protons/batch  Booster repetition rate 15 Hz instantaneous Currently 7.5Hz average (limited by injection bump and RF cooling)  Beam loss Damage and/or activation of Booster components Above ground radiation Total protons accelerated in Main Injector:  Maximum main injector load Six “slots” for booster batches (3E13) Up to ~11 with slip stacking (5.5E13) RF stability limitations (currently ~4E13)  Cycle time: 1.4s + loading time (1/15s per booster batch) Operational Limit

Proton Study Meeting 4/19/05 Eric Prebys 4 Plan Strategy See document: BEAMS-DOC-1441 (11/09/04) at Increase the proton delivery from the Booster (to both NuMI and BNB)  Increase acceptance by improving orbit control and beam quality  Increase maximum average Booster repetition rate Increase the beam intensity in the Main Injector for NuMI  Main Injector multi-batch operation  Slip stacking in Main Injector (probably requires RF upgrade?) Improve operational reliability  Alleviate 7835 Problem  Linac quad supplies

Proton Study Meeting 4/19/05 Eric Prebys 5 Current Budget Guidance After the cancellation of BTeV, we have the following budget guidance (M&S+SWF): Most Likely Scenario  Main Injector RF project and Booster Corrector System get delayed by one year, relative to the original plan  Booster RF Solid State PA upgrade deferred indefinitely FY05FY06FY07FY08Total Present Guidance

Proton Study Meeting 4/19/05 Eric Prebys 6 Booster Throughput Major Improvements:  New ORBUMP system (2005 shutdown)  Relocate L13 dump to MI- 8 line (2005 shutdown)  New corrector system (2007)  19 th and 20 th cavities added Performance  Rep rate (after 2005) 7.5 Hz -> 8-9 Hz  Total protons (by end 2008) 8E16 pph -> 1.45E17 pph  Batch size (by end 2008): 5E12 -> 5.5E12 ~7E20 p/yr

Proton Study Meeting 4/19/05 Eric Prebys 7 Main Injector Loading Initial NuMI operation (“2+5”):  Two batches are slip stacked for antiproton production  Five more batches loaded for NuMI  All are accelerated together Ultimate NuMI operation (“2+9”):  Five batches will be loaded into the Main Injector, leaving one empty slot  Six more batches will be loaded and slipped with the first to make two for antiproton production and 9 for NuMI  This may exceed the capacity of the current RF system

Proton Study Meeting 4/19/05 Eric Prebys 8 Main Injector Loading (cont’d) Major Improvements:  Large Aperture Quads (2005 shutdown)  Loss monitoring and collimations system (TBD)  Multi-batch operation  Dual PA upgrade (??) Performance  2 (pbar) + 5 Numi 5E12 2 sec in 2005  2 (pbar) + 9 NuMI 5.5E12  2.2 sec in 2008

Proton Study Meeting 4/19/05 Eric Prebys 9 Main Injector RF Issues The Main Injector Upgrade path remains the single largest uncertainty in the Proton Plan  Might be possible to reach intensities of the current Plan without upgrades of any kind. Towards a decision  Proceed with two/PA prototype  Proceed with systematic studies in the Main Injector  Organize a workshop this summer Will consider the following –Potential of feed forward system –Potential and concerns with two PA solution –New RF system proposals. Will coordinate needs of current plan, Stage II Plan, and Proton Driver Generate a perfomance/price table  Goal: reach a decision for Stage I by end of FY05

Proton Study Meeting 4/19/05 Eric Prebys 10 Proton Projections Phases of Operation  Phase I (now) Booster lattice distortions ameliorated Booster limited to 7.5Hz total repetition rate Main Injector limited to 4E13 protons (2+5 operation)  Phase II (after 2005 shutdown) Injection bump (ORBUMP) replaced Drift tube cooling in Booster RF cooling finished Booster capable of 8-9Hz operation MI still limited to 2+5 operation  Phase III (after 2007 shutdown) MI RF upgrade complete 2+9 operation to NuMI

Proton Study Meeting 4/19/05 Eric Prebys 11 “Design” PoT from the document Booster Batch Size Main Injector Load Cycle Time MI Intensity Booster Rate* Total Proton Rate Annual Rate at end of Phase (AP + NuMI)(sec)(protons)(Hz)(p/hr)NuMIBNB Actual Operation July, E E E E+20 Proton Plan Phase I 5.10E  E E+172.0E+201.5E+20 Phase II 5.3E E E+172.2E+202.8E+20 Phase III 5.50E E E+173.4E+202.2E+20 Beyond Scope of Present Plan 11 Hz 5.50E E E+173.4E+205.0E+20

Proton Study Meeting 4/19/05 Eric Prebys 12 Long Term Projections Long Term Projections BNB fallback = poor performance of Booster aperture upgrades BNB only runs during shot setup This turn-on is slower than in document NuMI fallback = slip- stacking fails Note! Does NOT reflect NuMI’s recent troubles!

Proton Study Meeting 4/19/05 Eric Prebys 13 Issues beyond Stage I In the existing proton plan, total proton rates continue to be limited by beam loss in the Booster:  We believe this will go to ~1.45E16 pph over the next few years.  This is about enough for the basic Recycler retasking proposal, but it would have to go to 2E16 or more for some of the more aggressive schemes. Once ORBUMP is replaced and RF cooling is implemented, the Booster rep. rate will be limited by main power to the RF system (modulators + bias supplies):  Exact limit being determined, but believe it is 8-9 Hz  Probably significant upgrade to enable 15 Hz operation. Linac also has total throughput limitations:  Primarily beam loss in the 400 MeV labyrinth  These would have to be investigated to go beyond Stage I.