Fire Protection System Deactivation Process April 2007 Rich Kobelski Hanford Fire Marshal 1.

Slides:



Advertisements
Similar presentations
Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
Advertisements

Revised Bloodborne Pathogens Standard WAC Safer Medical Device and Sharps Injury Recordkeeping Requirements.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Page 1 County of Los Angeles Corrective Action Plan Program Enhancements John Sterritt CEO Risk Management.
OSHA’s Revised Bloodborne Pathogens Standard Outreach and Education Effort 2001.
May 2012 Dave Mertz, Deputy Fire Marshal Hanford Fire Department.
Instructional Materials Process and Progress Update Chief Academic Officer Quarterly Meeting November 13, 2012.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Defense Nuclear Facilities Safety Board
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Safety and Loss Control
Division of Occupational Safety and Health (Cal/OSHA) March HEAT ILLNESS PREVENTION TRAINING.
OH&S Management System
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
Basics of OHSAS Occupational Health & Safety Management System
10 CFR 851 Worker Safety and Health Program Overview.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
WHAT IS SYSTEM SAFETY? The field of safety analysis in which systems are evaluated using a number of different techniques to improve safety. There are.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
TEN-T Experts Briefing, March Annual Call Award Criteria.
© 2010 Delmar, Cengage Learning Instructor Resources for Lesson E Managing the Risk.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
COMPANY READINESS. Before the alarm…. Readiness of personnel Readiness of assigned resources.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Chapter 13 The Incident Command System. Introduction Incidents come in all types and sizes As you become more skilled in size-up and applying strategic.
© 2008 Delmar, Cengage Learning Fire Protection Systems and The Model Code Process Chapter 2.
1 NEI Process Discussion. 2 Topics for Discussion Relationship to NFPA 805 Relationship to Regulatory Guide Technical Process currently in NEI
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
OHT 12.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Introduction Types of external participants Risks and benefits of introducing.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Work Planning and Control Tim Flake, Principle Technical Advisor Maintenance.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
Fire Hazards Analysis the ORNL Approach Jeff Sipes Fire Protection Engineer April 17, 2007.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
Richard Sanchez Chief, Environmental Health Division Dennis Green Chief, Hazardous Materials Division Dana Booth Supervising Environmental Specialist Susan.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
04-25 Right to Know Right to Know  General  The purpose of this guideline is to insure that the Brunswick Fire Company No. 1 provides a safe.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
ITEM 6.a AT GREEN BUILDING ORDINANCE City Council – August 25, 2009.
João Paulo F. A. Carvalho The 5 step model on Risk Assessment How to assess the risks (5 steps model) and Completion of the 5 steps.
Ordinance Amending Chapter 37 of the Orange County Code Orange County Board of County Commissioners Public Hearing April 3, 2012.
1 Standards and Construction Specifications Manual Orange County Utilities February 13, 2007.
OH&S Management System
Fort Stanwix National Monument Energy Audit Contract
Planning Commission Public Hearing September 9, 2016
Occupational Radiation Protection during High Exposure Operations
Flooding Walkdown Guidance
OH&S Management System
IAEA Safety Guidance on Licensing and Oversight Activities
Accreditation Update Regional Municipality of Durham March 15, 2018.
Nick Bonvoisin Secretary to the Convention on the
Research and Test Reactor Decommissioning Inspections
TRTR Briefing September 2013
What Is VQIP? FDA required to establish a program to provide for the expedited review of food imported by voluntary participants. Eligibility is limited.
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Fire Protection System Deactivation Process April 2007 Rich Kobelski Hanford Fire Marshal 1

History of Changes/Requirements Prior to 1995 – Fire system deactivation was based on building value and environmental release limits. March 1995 – DOE published interim guidelines for abandoned facilities and facilities in the D&D process. –Should consider public, worker, and firefighter safety –“Stand-off and protect” tactical approach introduced September 1995 – DOE G , issued with Chapter 10 reflecting interim guidelines. Deactivation process at Hanford based on DOE Headquarters and local mandatory directives. 2

FH Process for Fire System Deactivation Groundwork to implement a comprehensive deactivation process including the non-mandatory guidance in DOE G began in early 2004, but initial process judged to be too cumbersome with too many approvals. March 2005 – Fire Marshal Advisory Bulletin issued to redefine the deactivation process. January 2006 – Chapter 10 of DOE G added to FH Requirements Applicability Matrix – Chapter 10 of the Guide is now a mandatory set of contractor requirements. 3

FH Process for Fire System Deactivation (cont.) The need to continue the development of a more formal comprehensive deactivation process grew as: –Hanford Site work transitioned to facility deactivation and demolition activities –Facility/project management sought cost savings for increasing number of unoccupied buildings primarily through: Elimination of heating and utility costs Elimination of Fire Systems Testing and Maintenance costs 4

Late 2006 – New process flow diagram was created to establish the basic deactivation steps. Fire system deactivation is not allowed if nuclear safety requirements cannot be achieved. Fire system deactivation may be allowed without a timetable for building demolition only if: –DOE loss criteria will not be exceeded, –Adequate water supply is available without the fire system, –No unacceptable exposure hazards exist, –Adequate fire control and firefighter safety is anticipated with existing resources, and –The financial or political risks are considered acceptable. 5 FH Process for Fire System Deactivation (cont.)

6

FH Process for Fire System Deactivation Requirements Document HNF-RD-9717, Fire Prevention for Construction, Occupancy, Demolition Activities then revised to define the new process. –Facility submits request for fire system deactivation; –FPE prepare FHA revision per HNF-RD-9390, Fire Hazard Analysis as applicable or –FPE prepares fire system deactivation analysis, including: MPFL determination Exposure assessment (SOG 4.10) Water supply analysis (SOG 4.10) Life Safety Code review Firefighter Safety determination (SOG 4.10) 7

New Process Requirements (cont.) –Review analyses against DOE requirements –Nuclear safety evaluation for acceptability of deactivation as applicable –Perform USQ/PAAA screening as applicable –Evaluate company level financial and political risks if hazardous and/or radioactive materials are present and submit risk acceptance letter to HFD as appropriate 8 FH Process for Fire System Deactivation (cont.)

–Evaluation of deactivation request by the HFD for proposed tactical approach in the absence of the fire system including a possible “stand-off and protect” approach –Prepare FM Permit for deactivation –Obtain HFD Fire Chief concurrence for fire system deactivation based on: Sequential fire system deactivation in conjunction with building section demolition as applicable Fire system deactivation with the requirement that building demolition begin within 30 days Fire system deactivation with no timetable for building demolition 9 FH Process for Fire System Deactivation (cont.)

FH Process for Fire System Deactivation HFD Internal Procedure – SOG 4.10, Deactivation of Facility Fire Protection Features, created to further detail the features of the process. –Provides pertinent definitions –Establishes individual/organizational responsibilities –Identifies and details Deactivation Evaluation and Decision requirements –Provides required analyses and assessment forms to be completed (minimum fire water flow, exposure analysis, and response assessment for firefighter safety and possible “stand-off and protect” posture) 10

Summary of Process Implementation Since November 2006, HFD has received 10 formal requests for fire system deactivation. –1 declined (large wooden structure – HFD resource issues) –3 approved for fire system deactivation provided building demolition begins within 30 days –6 approved for fire system deactivation with no timetable for facility deactivation 11