THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.

Slides:



Advertisements
Similar presentations
STARLight PDR 3 Oct ‘01I.1 Miller STARLight Control Module Design Ryan Miller STARLight Electrical Engineer (734)
Advertisements

GoetzFIELDS iCDR - TDS Solar Probe Plus - FIELDS Instrument CDR Time Domain Sampler TDS Keith Goetz University of Minnesota 1.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
CCD and CCD readout : Engineering diagnostics during development, commissioning and operation Pierre Antilogus C. Juramy, H.Lebbolo, S. Russo, V.Tocut.
TRIO-CINEMA 1 UCB, 2/08/2010 STEIN Intro Davin Larson Space Sciences Laboratory University of California, Berkeley.
ISUAL Sprite Imager Electronic Design Stewart Harris.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
ISUAL Spectrophotometer Electronics C. Ingraham. 2NCKU UCB Tohoku CDR 9 July, 2001 Spectrophotometer Electronics C. Ingraham SP Electronics Functions.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
1 Hall D Drift Chamber ElectronicsFJ Barbosa Drift Chamber Review6-8 March 2007 Electronics for CDC and FDC Hall D 1.Motivation 2.ASIC Development 3.Preamp.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Earth Atmosphere.
MPSREFI- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW “Our Gateway to the Cape…” The Electric Field Instrument (EFI) John Bonnell University of California.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
1 Dec SPP-Fields Antenna Electronics Board (AEB) Concept Status Report J.W.Bonnell, S. Harris, S. Heavner Space Sciences Laboratory UC Berkeley.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Solar Probe Plus FIELDS DFB Report Quarterly Management July 18, 2013.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
Preamps (PRE) and Sensors Rachel Hochman John Bonnell Space Sciences Laboratory University of California, Berkeley CDR September 30-October1, 2009 RBSP-EFW.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Instrument PER 1/21/ EFW Instrument Calibration John W. Bonnell Space.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 213 Low Voltage Power Supply & Power Controller Board Peter.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes LVPS+PCB Peter BergRBSP/EFW CDR /30-10/1 IDPU LVPS AND PCB Critical Design Review.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
1 Status Report on ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
FIELDS iPDR – RFS Analog Dennis N. Seitz 1 Solar Probe Plus FIELDS Instrument PDR Radio Frequency Spectrometer Analog Dennis N. Seitz UC Berkeley SSL
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Engineering Peer Review Overview Dr. John W. Bonnell and the.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
BonnellFIELDS iCDR – AEB Solar Probe Plus FIELDS Instrument CDR Antenna Electronics Board AEB J. Bonnell, D. Seitz UC Berkeley, SSL
Boom Electronics Board (BEB) Engineering Peer Review Oct
Solar Probe Plus – FIELDS Main Electronics Package
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
FGM CDR FGM Electronics (FGE) Ronald Kroth MAGSON GmbH Berlin Germany.
Calorimeter Mu2e Development electronics Front-end Review
Analogue Electronics Circuit II EKT 214/4
INSTRUMENT DATA PROCESSING UNIT (IDPU)
Electric Field and Waves Instrument (EFW)
Instrument Data Processing Unit (IDPU)
Boom Electronics Board (BEB) EFW-EMFISIS E-Field I/F (EFW-EMF)
Boom Electronics Board (BEB)
Preliminary Design Review
Radiation Belt Storm Probes Electric Field and Waves Instrument
Development electronics SIPM-MU2e
Low Voltage Power Supply & Power Controller Board
THEMIS Electric Field Instrument
Digital Sub-System Dorothy Gordon.
Presentation transcript:

THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard

THEMIS Instrument CDR 2 UCB, April 19-20, 2004 BEB Requirements Functional Requirements Spin Plane Booms, for each provide: –Floating Ground Driver –“Bias”, “Guard”, “Usher” programmable potentials –“Braid” programmable, switchable potential –AC test signal source Axial Booms, for each provide: –Floating Ground Driver –“Bias”, “Guard”, “Usher” programmable potentials –AC test signal source

THEMIS Instrument CDR 3 UCB, April 19-20, 2004 BEB Requirements, con’t.

THEMIS Instrument CDR 4 UCB, April 19-20, 2004 BEB Analog Electronics

THEMIS Instrument CDR 5 UCB, April 19-20, 2004 BEB Block Diagram

THEMIS Instrument CDR 6 UCB, April 19-20, 2004 Braid Bias

THEMIS Instrument CDR 7 UCB, April 19-20, 2004 Preliminary PCB Layout

THEMIS Instrument CDR 8 UCB, April 19-20, 2004 BEB ETU

THEMIS Instrument CDR 9 UCB, April 19-20, 2004 BEB ETU

THEMIS Instrument CDR 10 UCB, April 19-20, 2004 BEB Parts Analysis Parts Stress Analysis Design meets derating guidelines of GSFC PPL-21 Worst Case Temperature Analysis Parts meet Temperature Guidelines –Operating Temperature range: –30C to 85C –Survival Temperature range: –50C to 125C Only one “high” power device (Actel 54SX72) –Operating power dissipation: 63 mW

THEMIS Instrument CDR 11 UCB, April 19-20, 2004 BEB ETU Mass and Power Power Estimated worst case power at PDR: 1667mW –Includes Preamp power of 324mW Measured ETU operating power: 790mW –Including Preamp, total = 1114mW Mass Estimated mass at PDR: 504g Measured ETU mass: 426g

THEMIS Instrument CDR 12 UCB, April 19-20, 2004 BEB ETU Test Results DC Response of Floating Ground Driver, FL_GND2

THEMIS Instrument CDR 13 UCB, April 19-20, 2004 BEB ETU Test Results (con’t) AC Response of Floating Ground Driver, FL_GND2

THEMIS Instrument CDR 14 UCB, April 19-20, 2004 BEB ETU Test Results (con’t) DC Response of Bias Driver, BIAS1

THEMIS Instrument CDR 15 UCB, April 19-20, 2004 BEB ETU Test Results (con’t) AC Response of Bias Driver, BIAS1

THEMIS Instrument CDR 16 UCB, April 19-20, 2004 BEB / EFI Subsystem Test Integrated Testing Includes: –BEB, Boom wire, Preamp –Sensor Boxes with Plasma Simulator (R║C) –GSE Automated Data Acquisition Test Results –DC Tests –Isolation, Sensor biasing, Usher/Guard Biasing, Braid biasing –DC Gain/Offset –AC Tests –AC input impedance, Transfer function, Crosstalk, Noise level –Linearity, Slew rate

THEMIS Instrument CDR 17 UCB, April 19-20, 2004 EFI Test/Characterization

THEMIS Instrument CDR 18 UCB, April 19-20, 2004 BEB GSE Data Acquisition Capabilities: Supports Automated test of Flight Hardware “VME-style” backplane –Accepts BEB and DFB –DCB-simulator implements CDI command 16-Channel 16-bit ADC (±100V range) –6 Vsphere, 2 Braid, 2 Usher, 2 Guard, 2 Flt. Gnd Programmable Signal Source w/ –±60Vdc offset range –30mV to 15Vpp AC (DC-16kHz) –1mV to 500mVpp AC (100k – 500kHz) LVPS and PCB simulation –Power services programmable on/off –+5VD, +2.5VD, ±10VA, ±100VA –Current monitors

THEMIS Instrument CDR 19 UCB, April 19-20, 2004 BEB GSE Data Acquisition

THEMIS Instrument CDR 20 UCB, April 19-20, 2004 BEB Design Status Completed ETU Design and Fabrication Characterization w.r.t. DC gain and AC response –In progress Available for testing with Preamp prototypes EFI Sensor Test Program GSE Data Acquisition system completed Integrated tests with preamps and boom units Issues Actel 54SX72 failures, total of 4 out of 7 –2 failed programming –2 failed “in circuit”, cause unknown TBD

THEMIS Instrument CDR 21 UCB, April 19-20, 2004 BEB Add’l Info Additional slides included: Floating ground driver schematic Bias driver schematic TBD

THEMIS Instrument CDR 22 UCB, April 19-20, 2004 Floating Ground Driver Heritage Design CLUSTER, POLAR, FAST Minor changes in part selection

THEMIS Instrument CDR 23 UCB, April 19-20, 2004 Bias Driver Heritage Design CLUSTER, POLAR, FAST Minor changes in parts selection and DAC