Photos of Rig. The FRB Stack The FRBs The SiPMs The PotentiometersDry Air Tube Cooling Pad Fixel Trigger Board FRB to BBB Ribbon Cables.

Slides:



Advertisements
Similar presentations
Preparing the Big Bite Hadron Detector Package Gordon Lott, Virginia Tech Mentor: Douglas Higinbotham All the signals from the PMTs are sent via cable.
Advertisements

LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Intro to Digital Logic. What does Digital mean? A method of storing, processing and transmitting information through the use of distinct electronic or.
Test Setup for PHOBOS Hybrid/Module Testing at MIT Pradeep Sarin 31 July 98.
Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
R&D of Strip/Block Scintillators E.P.Jacosalem, S.Iba, N.Nakajima, H.Ono, A.L.Sanchez, A.M.Bacala & H.Miyata GLD Calorimeter Group 8 th ACFA Workshop on.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
60 Hz Variations in Pins Plugged probe into temperature controller output pins: pins 1, 2, 3, 4 all show 1V p-p variations Plugged probe into pins at other.
WALTA DAQ. Input 4 BNC Connections for PM signal GPS Connection for Time Signal Serial port for programming.
Dry type transformers Zaragoza Accessories and options
Integrated test environment for a part of the LHCb calorimeter TWEPP 2009 Carlos Abellan Beteta La Salle, URL 22/9/2009TWEPP09 Parallel session B2a - Production,
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
UoA calibration system1 Modular calibration/monitor system for the GlueX BCAL +FCAL University of Athens * G.Voulgaris E.G.Anassontzis P.Ioannou E.Kappos.
03 September 2007 Digital I/O Wiring Exercise. Copyright © 2007 Alien Technology Corporation. Advanced Academy Student use only. Not for redistribution.
Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos.
Detectors - what detectors are available diamond / silicone - transport / shipping - 3 ROCs at UT? ROC Operation / Readout Modules (ED) - what modules.
GE1/1 Services and Strips PCB Andrey Marinov On behalf of CMS GEMs collaboration.
What does Boris do? a progressively more technical answer.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
RAD hardening Half of dual HV supply or quarter of quad HV supply w breakout Output connector Input connector Ion Pump: RAD area Standard cable RAD-hard.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
CCNA 1 v3.0 Module 4 Cable Testing. Objectives Waves.
NET 433 OPTICAL NETWORK Lab 3 Networks and Communication Department 1.
1 Pad #0 IN WIRE PAD NUMBER 23 CARDIAC OUT 0 1 Output Connector Pad #1Pad #3Pad #2Pad #5Pad #4 HV Side Q1-M4-R4 Cabling Gas Side Cable.
The Adventures of Sparky LeCroy TK Hemmick for the Stony Brook Crew and Maxim.
Dual PD Amp Circuit Board Test Results By Alexa Staley LIGO G v1 1.
Grounding Studies Metal box sensor SVX4/hybrid Analog cable GND(20W)
PMT HV Base Prototypes Evaluation Instrumentation Workshop LBNL July 23-24, 2003 Nobuyoshi Kitamura University of Wisconsin-Madison SSEC.
FPD PROGRAM / FPD MOTION DIAGRAM / FPD MOTION - NEW DIAGRAM / FPD RANDOM PROGRAM / FPD PROGRAM Lionel PEYRICHOUX 03/22/2001.
TECHNOLOGY GUIDE FOUR Basics of Telecommunications and Networks.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
1/10/2016Collaboration Meeting Feb 2011 Start Counter 1 Start Counter Update W. U. Boeglin L. Guo E. Pooser Measurements on EJ-212 scintillator bars Attenuation.
STGC Front end boards sTGC Front end boards NSW Electronics workshop November 2013 L. Levinson Weizmann Institute NSW Electronics workshop, November 20131L.
Linearity Tests The laser induced high noise pulses on the APD rendering it useless. We tried several methods to shield and filter the noise. With a stabilized.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
0-10V Ballast Dimmer HDL-MRDA HDL-MRDA channel 10A DC0 - 10V output module is a multifunction control module. It has 6 channel relay.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
FT Prototype Test Purpose: test the prototype of the FT Calorimeter and Scintillator Hodoscope Technique: prototype is installed under the Hall B photon.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Upgrade: Calo Trigger Calorimeter detector 20 Link = 4 copper wire Serial LVDS 280Mhz 32
Preparation for TS3 Mariana Rihl. Known issues Implications on light leaks on all modules – Visible on current feedback of bias – Confirmed by study performed.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
IFR Detector R&D status
LHCb Outer Tracker Electronics 40MHz Upgrade
ETD PID meeting We had many presentations dedicated to the PM test .
MICE RF System Power Supplies, Control and Monitoring Status report
ECAL Front-end development
Digital signal processing for a thermal neutron detector using ZnS(Ag):6LiF scintillating layers read out with WLS fibers and SiPMs J.-B. Mosset, A. Stoykov,
Radius disco Radius agujero Motor Controller Sensor Motor soporte.
KRB proposal (Read Board of Kyiv group)
Christian Veelken last updated 11/09/06
Increasing the Spatial Resolution of the Tile Calorimeter
News on second coordinate readout
Module 4 Cable Testing.
Front-end electronic system for large area photomultipliers readout
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
HCAL HV splice box.
EVLA MONITOR & CONTROL CDR
Testing of the EMCO Prototype Boards
WP2 – Operational Context & Scenario
TOF & BB FEE Safety Review
Characterization of Wired-OR prototype board
Presentation transcript:

Photos of Rig

The FRB Stack The FRBs The SiPMs The PotentiometersDry Air Tube Cooling Pad Fixel Trigger Board FRB to BBB Ribbon Cables

Trigger Signal Very Large Scintillating Fibers Copper Cooling Tubes Dry Air Tube Empty Box PMT used with HV as Trigger Signal

The Fixel Trigger Board Power Wires Black=ground Red=V+ White/Yellow=V- One Shot Input Wire Output Wires Black=ground White=Signal

V-bias Controller Digital (V-) Power Supply Analog (V+) Power Supply Chiller

Digital Thermometer Spider Box Beaglebones FRB stack Power strip Ethernet Box BBB Power Source