FOUR CHANNEL ULTRASONIC RECEIVER TEAM C BRIAN MARKUS (TEAM LEAD) DANNY VISELMAN CHEN JIA.

Slides:



Advertisements
Similar presentations
Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
Advertisements

System Block Diagram VCO As A Multiple Signal Oscillator 4 to 1 Power Combiner System Layout System Practical Operation – room 319 “To do” List Gantt.
WORK STATUS REPORT (from to ) 1 ASHWINI KUMARI AS EQUIPMENT TECHNOLOGIST SYSTEMS LAB CeNSE.
ECE 477 Final Presentation Team 6  Spring 2010 Digital Sound Projection.
Outline Project overview Project-specific success criteria Block diagram Component selection rationale Packaging design Schematic and theory of operation.
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
Hardware-in-the-Loop Testbed Team 186. Project Collaborators Team Members: o Aaron Eaddy – EE o Ken Gobin – EE/COMPE o Douglas Pence – ENGR PHYS/EE Team.
Professor Sung-Yeul Park
Electrical and Computer Engineering Preliminary Design Review Team 14: BMW Brainwave Manipulated Wagon.
Four Channel Ultrasonic Receiver Presented by: Chen Jia Team members: Brian Markus Danny Viselman.
Technical Specification / Schedule Department of Computer Science and Engineering Michigan State University Spring 2007 Team : CSE 498, Collaborative Design.
P09004 Eye Tracking. Engineering Analysis Reviewing manuals for Single Board Computer Looking at various mounting methods for cameras Preliminary.
Through Wall Radar ECE 480 Fall 2008 Design Day Presentation.
Project Management 30 January. Odds and ends Tournament on the webweb In the newsnews.
SNIFFER CARD for PCI-express channel
Transponder Beacons Control Box Head Mounted Display Inertial Sensor The IS600 Tracking System Ultrasonic Coordinate Base.
Fundamentals of Information Systems, Second Edition
High Speed Digital Systems Lab Spring/Winter 2010 Part A final presentation Instructor: Rolf Hilgendorf Students: Elad Mor, Ilya Zavolsky Integration of.
P08009 Audible Memo Board Phase II Monday, October 22, 2007 P08009: Audible Memo Board Phase II Sponsor: Tala Hopkins Jon GosligaAudio Output Lead Loic.
Thermocouple Signal Simulator Sponsor: Emerson- Kent Burr, Charles Eastberg Advisor- Dr. Semih Aslan Group: NPPH(1.7) Taylor Nash, Rey Perez, Victor Pinones,
For Electric Vehicle Team Members Pramit Tamrakar- Electrical Engineering Jimmy Skadal- Electrical Engineering Hao Wang- Electrical Engineering Matthew.
ULTRASONIC TRANSMITTER Amanda Hellberg, Brandon Ravenscroft, Jonathan Owen, and Kai Gustafson TEAM B-CDR.
ULTRASONIC TRANSMITTER Amanda Helberg, Brandon Ravenscroft, Jonathan Owen, and Kai Gustafson.
P13071 – Non-Invasive Blood Glucose Monitor Team Members Jared Bold Yongjie Cao John Louma Andrew Rosen Dan Sinkiewicz Faculty Advisor Professor George.
RF Signal Wireless Test Lab Weekly Report 1: Objective: Familiarize all group members with RF wireless transmission capabilities and components.
MSD P07302Design Review1 Motor Controller Subsystem MSD P07302 Project Sponsor: KGCOE Project Members: D. ShenoyProject Manager S. TallauSoftware Design.
1 © Unitec New Zealand Embedded Hardware ETEC 6416 Date: - 10 Aug,2011.
Bi-Directional RF Data Communication A Robot Control Device Team BDRFC.
Department of Electrical and Computer Engineering Lighting Tool Box Winter 2004 ECE 498 Team Members: Nick Sitarski Blaine Thompson Brandon Harris Dave.
Ultrasonic Tracking System Group # 4 Bill Harris Sabie Pettengill Enrico Telemaque Eric Zweighaft.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
ECE 477 DESIGN REVIEW TEAM 2  FALL 2011 Members: Bo Yuan, Yimin Xiao, Yang Yang, Jintao Zhang.
Flatiron Mobile Device Security Monitor Thomas Horacek Lucas Greve.
Department of Electrical and Computer Engineering SDP team Yngvesson Ioan Tihenea Tomas Broka Dmitriy Stupak Sergey Derivolkov IR Communication Channel.
P14452: SYSTEMS DESIGN REVIEW Take Two. OVERVIEW Updates Engineering Specifications Morph Chart Concepts Development Presentation Selections Action Items.
HA-OSCAR Chuka Okoye Himanshu Chhetri. What is HA-OSCAR? “High Availability Open Source Cluster Application Resources”
Introduction In 2008 President Geoffrey introduced the Live Green Program which called for environmentally conscious living. In light of this initiative,
FOUR CHANNEL ULTRASONIC RECEIVER TEAM C BRIAN MARKUS (TEAM LEAD) DANNY VISELMAN CHEN JIA.
USF college of engineering EEL Engineering Design1 Term & Meeting Info: Spring M 6:30pm – 9:15pm. Angelina Colannino, John Hook, Kjersti.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 3 Report Jack Hickish.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Michael Lisoski Leblanc Meneses Jason Schaer Bryan Staton.
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
Second part is the oscillator itself. Hardware circuit that converts a DC signal to an AC signal. Frequency of the oscillator.
Status Report #2 Autonomous Lawnmower Team 5 April Fowler Jose Manzanares Ranjith Raghunath Christopher Gerhardt 5 Feb 07 To design and implement an autonomous.
Daredevil Robot Direction Module (DRDM) Senior Design II Midterm Presentation.
Dual-Use Wideband Microphone System
Aircraft Carrier Draft Measurement
Aircraft Carrier Draft Measurement Ship Draft Team - Fall 2015.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Abstract The purpose of this project is to design a high-performance FPGA-controlled amplifier for Teradyne Corporation. This will constitute Phase IV.
For Electric Vehicle Team Members Pramit Tamrakar- Electrical Engineering Jimmy Skadal- Electrical Engineering Hao Wang- Electrical Engineering Matthew.
Interactive Breadboard Spring 2013 Group 21 - Simon Huynh, Norman Lee, Harrison Hilgers TA Dennis Yuan, Professor Carney.
SMART CART Group 20 Ciju Francis, Tom Rosengrant.
MSD II SYSTEM DESIGN REVIEW ANDY MIDDLETON BRIAN RELLA HYUN JIN KIM 1 P ##-2012.
ECE445: Senior Design Spring 2015 Team 17: Weather Jukebox Sang Yun Bang, Thomas Fedrigon, Shanda Lu.
Dual-Use Wideband Microphone System
Four-Channel Ultrasonic Receiver Team C: Brian Markus Danny Viselman Chen Jia.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
EMERGENCY LIGHTING SYSTEM. Power Outage Downed Power Lines due to Severe Weather Downed Power Lines due to Severe Weather Emergency Lighting (Key to Safe.
Dynamic Ferrofluid Lamp Team 59
WINDMILL (NO GEARBOX): CDR
ECE 445 Senior Design, Spring 2018
Ultrasonic Transmitter
Programmable Ultrasonic Transmitter
ECE 477 Final Presentation Team 10  Spring 2008
CSE 498, Collaborative Design
P17452 Dresser-Rand System Health Monitor Detail Design Review
GIGABIT ETHERNET DESIGN ECE Spring 2004
Top Cat Phase II P12352 Team Members: Faculty Guide: Mahdi Massey – EE
Presentation transcript:

FOUR CHANNEL ULTRASONIC RECEIVER TEAM C BRIAN MARKUS (TEAM LEAD) DANNY VISELMAN CHEN JIA

OVERVIEW Design and create a Four Channel Ultrasonic Receiver, capable of receiving signals between 30 kHz and 50 kHz. Capable of receiving a chirp signal as well as a constant frequency signal (Beacon). Will work with Team B’s Ultrasonic Transmitter.

SYSTEM DESIGN Level 0 Level 1

SYSTEM DESIGN (CONT.) Level 2

TESTING/EVALUATION Will design the system one component at a time, simulating each environment. Function generators will be used to simulate incoming signals and oscillators. We will slowly integrate each component to another, making sure each stage is designed properly. An important aspect of our testing is to verify that the synchronization circuit between Team B’s transmitter is working properly, since that is primary use for our receiver. Once everything is verified we will get with Team B and test the chirp and beacon signals.

CIRCUIT DESIGN High Level Circuit Design of a Single Receiver Channel

PCB LAYOUT Last years’ 2 Channel Ultrasonic Receiver PCB

PROJECT MILESTONES Signal acquisition Mixer/LO/Filter/Amplifier Hardware design Embedded system design (software) Over-voltage protection PCB layout design Assembly Testing and evaluation

ORGANIZATION CHART

GANTT CHART

RISK MITIGATION High risks: 1.High volume of components 2.Maximum Voltage/Current ratings of components 3.Micro-solder required (most components will be surface mount) 4.Maximum ratings of the Arduino Due 5.Avoid component interference 6.Collaboration amongst team members and with the transmitter team is crucial.

QUESTIONS ?