March OsC Report and Restructuring WP4. OsC Report 4.1 Tapes Bus tape designs have been completed for modules with 130nm ASICs which incorporate options.

Slides:



Advertisements
Similar presentations
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
Advertisements

CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
FF-650 Repair Procedure—CMP 30 Frame Reason for Repair—CMP 30 models with Serial Numbers in the range of 2453 through 3354 in Lot 9587, 0008 through 0120.
Restructure of WP4 – provisional ideas and numbers to promote discussion Ian Wilmut.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
SLHC Strip Tracker Module Envelopes (Tim) WP4 Meeting Glasgow, 13 th June 2011.
WP1.2 – Photon Detectors Stephan Eisenhardt University of Edinburgh  Budget  Milestones  Progress Report  Partners: International Collaborating Groups.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
HECSE Quality Indicators for Leadership Preparation.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
WP4 Equipment Bids (Tim). Bids ATLAS – Case for the Purchase of Equipment for the Testing of Cooling Loops (£15k) – Case for the Purchase of Equipment.
And now for something completely different First results from the DC-DC Stavelet Peter & Ashley with Giulio & John.
WP4 – Plans for next 6 months
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
Adrian Bevan Queen Mary, University of London SVT Mechanical Support and Strip Sensors.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Stave 130 Envelope Peter Sutcliffe Strip Mechanics 20 th February Lancaster.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
Update to NLAG board 22 nd December Sep Jan MCE Workforce and OD Oct Nov Dec IM&T Estates Finance In hospital Model Out of hospital Model Progress.
Stave Core Thermo-mechanical and Electrical Performance Requirements (Tim) 10/07/2013Liverpool WP4 Meeting (11/7/13)1.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Frames and insertion Note: Stavelet holder (working) document available on wiki:
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
Mechanics R&D Ian Wilmut. Talk Scope This talk is to provoke conversation – not to direct activities. The slides should do no more than start the conversation.
UK Participation in phase-II tracker upgrade o Brief Overview of R&D work to date1 slide o Scope of Interest of UK institutes2 slides o Task list & Institute.
1 ABC130 Module Envelope Envelope set by 2 locations 1.Power end – biggest contribution coming from shield box 2.Data I/O end – set by wire bonding from.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Upgrade Review Meeting Introduction Craig Buttar University of Glasgow RAL 10/5/11.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
WP2: On Detector Systems 2.1 Strip Sensors Layout Evaluation 2.2 ASICs Digital Design Evaluation Wafer Test 2.3 Hybrids Layout & Manufacture Die Attach.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Leading Nottingham Programme update to ACOS 7 September 2010 Angela Probert Director of HR and Organisational Transformation Contributions from Lisa Sharples.
ATLAS-UK Tracker Upgrade OverviewR.Nickerson Programme StatusI.Wilmut [hat 2] WP2Peter Phillips WP3Bart Hommels WP4Tim Jones WP5Craig Buttar [hat 3] B180Todd.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
WP4 April 2013 to March 2016 (Tim). WP4 Outline 1.Scope of UK Activity 2.How the UK work fits into the international programme 3.People involved, institutes,
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
Straw man layout for ATLAS ID for SLHC
Berkeley status Aug 10th, 2012.
WP3 - Evaluation and proposal selection
Final CALICE OsC meeting: Status and summary of project
What is Stave Carrier Frame Required to Do?
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
End-cap Mechanics FDR Overview of the Project
The University of the Future: Preparing for Curriculum Refresh
Mechanics: (Tim).
WP4 – Plans for next 6 months
Graham Beck, QMUL, WP4 RAL 2 May 2013
Services Layout – Update
Integration Plan for the
Update to NLAG board 24th November 2015
Fin & Countertop Sample Kit Instructions
Limited Streamer Tube Project Summary
Street Manager Training approach
Presentation transcript:

March OsC Report and Restructuring WP4

OsC Report 4.1 Tapes Bus tape designs have been completed for modules with 130nm ASICs which incorporate options for both DCDC and SP powering within the same tape design (4.1). The tape contains two copper layers with the top copper layer used for some high voltage (HV) and low voltage tracks as well as the ground referencing. This allows us to respect the HV clearance specifications and to design a tape which could be used for both serial power and with DC-DC converters. The shield layer has been being iterated over the last three tape designs and now is very localised and performs more as a ground plane. Progress on the robotic tape tester is being made. A full-scale alignment artefact has been manufactured and measured at Liverpool and has been used to understand the coordinate-system calibration.

OsC Report 4.2 Stave Core Assembly The design-phase for the next iteration of 13-module long stave cores for 130nm ASICs is nearing completion. Time has been taken to incorporate feedback and ideas from across the international community and inevitably this has led to some delays. Initial designs of the various pieces of tooling needed to manufacture these stave cores has been developed and these are now being integrated, together with the stave core, into a single 3D model to ensure compatibility. The manufacture of low-level parts for the stave assembly tool, which are independent of geometry (eg. Inserts, close-out corners, etc) are being manufactured. It is hoped that the design work will be completed in time for the Freiburg meeting at which it will be reviewed leading to the start of manufacture just in May.

OsC Report 4.3 Module Mounting The mounting of modules to the first 12-module stave, completed at RAL in November 2013, constitutes a major deliverable to the international strip tracker programme. It is widely acknowledged that module mounting and wire bonding proceeded smoothly and with no damaged modules. The experience gained is currently being reviewed and the development of the module pick-up tools needed for the 130nm modules has commenced. Currently, module mounting for the next 12-module serial-powered stave has commenced but this work is now on hold pending the completion of the initial electrical testing programme on 130nm ASICs.

Re-structuring Why? – Groups are putting greater effort into WP2 than was assumed 2 years ago – Knock-on from delays to the ASIC programme – Alignment task dropped in cost-cutting exercise – Impact of HVCMOS Whatever we do we need to tell the OsC.. – Mention all of above – Say we should have completed the stave core design and assembly tooling design & manufacture and be in a position to manufacture stave cores by end or September

Re-structuring The impact of delays in the delivery of fully functional 130nm ASICs (and the consequent availability of 130nm electrical modules) on the future deliverables from WP4 are in the process of being evaluated. Currently we believe that the manufacture of a large number of pre- production module-ready stave cores will be beyond the end of this current grant period. Consequently, not all the effort associated with updating the final stave engineering design, the design and manufacture of the stave assembly tooling, and the development of the final assembly and test procedures will be used. This raises the possibility of redeploying this effort into other parts of the project. Already a limited amount of effort has been redeployed to pixel mechanics and integration (WP2 and WP6) and is being used to cement the UK groups’ leadership in the mechanical development of the endcap pixel system. We are now looking to reinstate the tracker alignment task that was removed in the trimming of the project to the funding envelope but we had aspired to fund through WA should the opportunity arise. However, we are also conscious that there may be a call to contribute mechanical effort to evaluate the impacts of adopting HVCMOS technology. As the initial work on alignment will not begin until the core production and tooling programme is complete we intend to complete this evaluation of HVCMOS vs alignment during the summer with the aim of committing this effort from October 2014.