Petroleum and Natural Gas Regulatory Board Regulations for CGD Network 1.

Slides:



Advertisements
Similar presentations
The appropriate Government shall, within a period of one year from the date of coming into force of this Act. To constitute an Authority to be known as.
Advertisements

Securities and Exchange Commission REGULATORY FRAMEWORK FOR SECURITIES BORROWING AND LENDING IN THE PHILIPPINES By: JOSE P. AQUINO Director, Market Regulation.
Indian gas regulatory framework: Industry issues.
Share Capital and Debentures
PRIVATE PLACEMENT CS Vasudeva Rao Devaki D V Rao & Associates
Prepared by Barış EKDİ 1 Competition Law & Policy in Natural Gas Market Cengiz SOYSAL Coordinator of Dept. No. I
1 The Regulatory Authority for electricity and gas:, The Regulatory Authority for electricity and gas: objectives, tasks, independence, accountability.
The regulatory framework of the Italian railways: an outline of the main aspects Angela Stefania Bergantino (University of Bari) First Conference on Railroad.
TRANSACTION AND INDUSTRY REVIEW CONFERENCE NIGERIAN POWER SECTOR REFORM: AN OVERVIEW OF TCN AGREEMENTS.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Guido Pier Paolo Bortoni President of Italian Regulatory Authority for Electricity Gas and Water (AEEGSI) UNIVERSAL ENERGY ACCESS A Focus on Universal.
What How When DELISTING. IN. SEBI(DELISTING OF EQUITY SHARES) REGULATIONS, 2009 SCRA[ SECURITIES CONTRACT( REGULATION ACT) 1956] LISTING AGREEMENT COMPANIES.
IAS 31 - Joint Ventures. Academic Resource Center Consolidations and joint ventures Page 2 Executive summary ► The accounting guidance for jointly controlled.
Petroleum & Natural Gas Regulatory Board Act 2006 Past Evolution and Future Developments By B S Negi Member Petroleum and Natural Gas Regulatory Board.
INTERNAL TRADE - LARGE SCALE RETAIL ORGANISATION
Natural Gas Business Line 1. Strategies- NG Business Line Consolidation of CNG Marketing through our existing Retail network HPCL’s Participation in CGD.
Märt Ots Estonian Competition Authority Baltic Electricity Market Fora Vilnius Latest developments in Estonia.
1H Results 2005 Strong growth in all businesses March 2010 The Endesa Experience of the Ombudsman.
Energy Conclave 2006 organised by IRADE 26 th July, 2006 LEGAL AND REGULATORY FRAMEWORK FOR THE PETROLEUM SECTOR Hemant Sahai Associates Advocates New.
RELATED PARTY TRANSACTION
Energy Regulation Legislation in Sri Lanka
|Date faculty of law groningen centre of energy law 1 Security of Supply – EU Perspective and Legal Framework First EU-Russia Energy Law Conference,30.
Working together. Achieving results. CPUC Recycled Water OIR (R ) Workshop 3: Recycled Water Costs/Rates Water IOU Panel General Principles January.
CONSUMER PROTECTION ACT Objectives of the Act Minimum expenses Speedy Redressal of the grievance Simple Procedures Protection of interest of the.
1 THE IMPACT OF THE DOWNSTREAM GAS ACT ON GAS PRODUCTION AND SALES ‘Gbite Adeniji PartnerAELEX Legal Practitioners Lagos, Nigeria
Room No.6, 4 th Floor, Commerce House 2A, Ganesh Chandra Avenue, Kolkata Connect : (033) ; (033) ;
1 BULGARIAN NATURAL GAS MARKET STRUCTURE STRUCTURE Nikolai Pavlov Commissioner, SEWRC, Bulgaria Commissioner, SEWRC, Bulgaria Gas Regional Initiative –
Sustainable Procurement and Community Benefits Getting ready for Procurement Reform in Scotland Jennifer Marshall.
Hüseyin Arslan, LLM Legal Counsel ERGO Turkey. Hüseyin Arslan, LLM. “Insurance Arbitration [Turkish Practice]”  Insurance litigation in Turkey has long.
Nov/Dec 2003ElectraNet BSP-2 Workshop (khb) 1 EU Telecoms Regulatory Status Governing Legislation Package 2002  Directive 2002/19/EC Access to, and interconnection.
REGULATORY FRAMEWORK ON OIL & GAS SECTOR by B.S. NEGI Member Petroleum and Natural Gas Regulatory Board, India 1.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
Brazil-Japan: Roadmap for an Economic Partnership Agreement Keidanren
Regulatory Challenges Indian Scenario. Regulatory Challenges  Index Indian Oil & Gas sector Infrastructure Market state of development Government Policies.
1 Cost Recovery in Jordan March 2009 Eng. Kamal Zoubi Former CEO / Jordan Water Company.
Quo Vadis, Baltic Gas market, Riga Juris Ozolins.
Natural Gas – Some Regulatory Issues Oil & Gas Industry Practice.
25 th September, 2008 Gas Infrastructure & Allied Issues 7th Petro India 2008 conference Gas In India- Issues, Opportunities & Challenges.
COMPANIES ACT, 2013 Appointment and Remuneration of Managerial Personnel CA. Arun Saxena Saxena & Saxena Chartered Accountants 811, Ansal Bhawan 16, Kasturba.
October 22nd, 2015 Burlington Telecom Advisory Board Setting the stage for discussion on criteria of the sale of BT 1.
Dividend Policy  Dividend is proposed by the Board of Directors and declared by the Shareholders at the Annual General Meeting.  AGM cannot increase.
ROLE OF OIL & GAS SECTOR REGULATOR TO ACCELERATE INVESTMENT IN INDIA.
BATLIBOI & PUROHIT Chartered Accountants. Companies Act 2013 Topics: KMP & Directors ( Incl. Independent Directors), Appointment & Remuneration of Managerial.
Meaning Stock exchange is an organised and regulated market for trading in various securities issued by companies and other institutions.
Underwriting. 1. The process by which investment bankers raise investment capital from investors on behalf of corporations and governments that are issuing.
1 CHAPTER VI BUSINESS- GOVERNMENT TRADE RELATIONS INTERNATIONAL BUSINESS.
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
INDIAN TAKEOVERS Meaning Of Acqusition: When an “acquirer” takes over the control of the “target company”, it is termed as takeover. When an acquirer.
REGULATORY FRAMEWORK. Mission and objectives of SEBI Securities & Exchange Board of India (SEBI) formed under the SEBI Act, 1992 with the prime objective.
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
© 2015 Haynes and Boone, LLP Standard cover slide Mexico Energy Reform “Let the Bidding Begin” - Round 0, Round 1 and Beyond: Analyzing the Bidding and.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
Energy Market Regulatory Authority of TURKEY (EMRA) Yusuf GÜNAY President, Energy Market Regulatory Authority Budapest, Hungary May 19, th Annual.
What is a Company? A Company is a voluntary association of persons formed for the purpose of doing business, having a distinct name and limited liability.
Electricity licensing and trading rules in Latvia Mini-Forum, July 3, 2006 Sandija Audzere, Head of Energy Unit, Legal Department Public Utilities Commission.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Directorate-General for Energy and Transport Mark van Stiphout – C2 Electricity and Gas GSE Workshop on storage investment 24 May 2007 Policy framework.
Powerpoint Templates Page 1 Powerpoint Templates Alternative Investment Fund (AIF)
Investment Management
Margin Trading System Based on Securities (Leveraged Markets and Pledging) Rules, 2011 and Concept Paper.
Latest developments in Estonia
European Union Law Week 10.
Meaning Stock exchange is an organised and regulated market for trading in various securities issued by companies and other institutions.
Budget 2017 – Important Tax Implications
LATEST UPDATE IN LATVIA
Overview of the Electricity Regulation Bill
The competition enforcement in regulated sectors
Faculty:- CMA R GOPAL MFM M.Phil., FCMA Practicing Cost Accountant
European Electronic Communications Code (EECC) DIRECTIVE (EU) 2018/1972 Auswirkungen auf CH-Nummerierung TSP Headgroup 28. März 2019.
Takeover Regulation.
Presentation transcript:

Petroleum and Natural Gas Regulatory Board Regulations for CGD Network 1

Application of CGD rules Regulation shall apply to entity which is Laying, building, operating or expanding or which proposes to Lay, build, operate or expand a CGD network. CGD network shall be designed as per PNGRB technical standard and specifications, safety standards for supplying natural gas on a sustained basis. 2

Volumetric Threshold Less than 50,000 SCMD per customer To be supplied only through CGD network More than 50,000 SCMD & Less than 100,000 SCMD per customer Consumer’s choice to take from CGD network or a separate consumer pipeline More than 100,000 SCMD per customer Through separate consumer pipeline 3

Process for Grant of Authorization 4 Reject the Proposal In case of single bid Board may go for re bid

Minimum Eligibility Criteria Payment of application fees as specified under the PNGRB (levy of fee and other charges) regulations, The entity is either a body corporate or undertakes to become a company registered under the companies Act on being declared as a successful bidder. The entity should have a credible plan sourcing natural gas for supply in the proposed CGD network. The entity should not have been penalized under section 28 or punished under chapter IX of the PNGRB Act

Minimum Eligibility Criteria- Technical Entity having experience of laying & building 300km of hydrocarbon pipeline may be on cumulative basis Entity on its own / with joint venture (with 11% equity) having experience of at least one year in O&M of a CGD network Entity having at least three technically qualified personnel with experience in a) Commissioning of hydrocarbon pipeline b) O&M of natural gas pipelines, gas compressors c) Commercial issues including gas pricing, accounting d) Safety of natural gas infrastructure.

Minimum Eligibility Criteria-Financial TierPopulation (in Million) Minimum combined Net Worth of the entity along with its promoters available for investments in single CGD network (Rs in Million) I5 million or more1500 for a population of 5 million and proportionately higher for bigger cities II 1 million or more but less than 5 million 1000 III 0.5 million or more but less than 1 million 500 IV 0.25 million or more but less 0/50 million 250 V 0.1 million or more but less than 0.25 million 100 VILess than 0.1 million50

Bid Bond(E.M.D) TierPopulationMinimum Bid bond amount Rs-Million I5 million or more50 for a population of 5 million and proportionately higher for higher population II 1 million or more but less than 5 million 30 III 0.5 million or more but less than 1 million 20 IV 0.25 million or more but less 0.50 million 15 V 0.1 million or more but less than 0.25 million 10 VILess than 0.1 million5 8

Bid Parameters ParameterWeightage Lowness of the present value* of the overall unit network tariff over the economic life of the project 40% Lowness of the present value* of the compression charge for CNG over the economic life of the project 10% Highness of the present value* of the inch-km of steel pipeline during the period of exclusivity in terms of exemption from the purview of the contract carrier or common carrier 20% Highness of the present value* of the number of PNG domestic connections during the period of exclusivity in terms of exemption from the purview of the contract carrier or common carrier * Present value to be computed at discount rate of 14% 30% 9

Performance Bond TierPopulationAmount( Rs in million) (5% of the project cost or the following whichever is higher) I5 million or more100 II 1 million or more but less than 5 million 60 III 0.5 million or more but less than 1 million 40 IV 0.25 million or more but less 0.50 million 30 V 0.1 million or more but less than 0.25 million 20 VILess than 0.1 million10

Regulations for Exclusivity for City or Local Natural Gas Distribution Networks 11

Types of Exclusivity Exclusivity for laying, building and expanding CGD network Exclusivity from the purview of the common carrier or contract carrier 12

Laying, Building, Expanding CGD Network Exclusivity period for the economic life of the project is 25 years Entity to meet service obligations ; in case of default, it may lose exclusivity PNGRB may consider extending exclusivity by a period of 10 years beyond economic life of the project 13

Common Carrier or Contract Carrier Five years from the date of authorization in case of new projects(marketing exclusivity ) In case of existing projects Three years * in case the project is under operation for three years or more before the appointed day Five years * in other cases * from he date of commencement of physical laying, building, operation or expanding the network 14

Service Obligations During the period of exclusivity from the purview of the common carrier or contract carrier Provide domestic PNG connections as per bid* Lay/build steel pipeline as per inch-km bid* Reach all wards or charge areas Provide domestic PNG connectivity at demand within a distance of 25 meters of the metering unit at consumer end till the tap-off point 15

Service Obligations Post Exclusivity Continue to expand the network to meet the requirement of its own customers and those of other entities. Allow third party access on a non-discriminatory basis to other entities desirous of using the network 16

Default & Termination In case of failure of service obligation 25% of Performance bond shall be en-cashed for the first default 50% of Performance bond shall be en-cashed for the second default 100% of Performance bond shall be en-cashed for the third default and authorization shall be terminated 17

Default & Termination In addition Board may levy civil penalties u/s 28 of PNGRB act Rs 1 Cr (max penalty)+Rs 10 Lacs per day continuation of default In case default is with regard to restrictive trade practice 5 times of unfair gain made by entity or Rs 10 Cr which ever is higher In addition Board may levy Rs 25 Cr penalty (max) + Rs 10 Lacs. per day continuation of default 18

Thanks 19