Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on

Slides:



Advertisements
Similar presentations
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Advertisements

NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
AB/ATB-EA ML, le 30/03/071 MERIT INSTALLATION. AB/ATB-EA ML, le 30/03/072 MERIT INSTALLATION Total supported weight Solenoid: 5500 kg (12000 lbs) Hg System.
Magnets for the ESRF upgrade phase II
VRVS, Jan. 2006CERN AB-ATB1 MERIT layout in TT2/TT2A/TT10 CERN AB-ATB VRVS session, Jan
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
March 2005 A.Fabich, CERN AB-ATB Introduction nToF11 collaboration meeting March 2005 A.Fabich CERN AB-ATB.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Polarity of the MERIT Magnet H. Kirk (Feb 7, 2008) Update 12 Feb: The CERN power supply group claims that the RED lead of the magnet was + (as per usual.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
The MERIT High-Power Target Experiment H. Kirk (BNL) CERN November 1, 2007.
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
Video 7.Dec. 2004A.Fabich, CERN1 CERN P186 Video Conference Access to TT2A during PS extraction POSSIBLE, see also memo at homepage: subsystem/safety/radiation.
Videoconference, 3rd May 2005A.Fabich, CERN1 Nitrogen release from the TT2A cryogenic solenoid systems A.Fabich CERN AB-ATB, Switzerland Videoconference,
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
-Fact 99 cdj Experiments with liquid jets C.Johnson CERN History CERN Mercury Jet Target - version 1985 Muon Collider Collaboration Targetry Workshops.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 1 MAGNETS FOR SPS & BEAM LINES MTTR & Spare Policy for the LHC Injectors & Exp.
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
READING QUIZ A wedge is a __________. A) truss B) frame C) machine D) beam.
10.March.2004, phone A.Fabich 1 Technical drawings of TT2A and adjacent galleries Detail – CDD number Overview surface, ----PDP Overview TT2/TT2A/ISR,
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
July 2005A.Fabich, CERN AB-ATB1 MERIT (ntof11) experiment: Diagnostics A.Fabich CERN AB-ATB July 2005.
Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO.
To TT10 Nitrogen or helium gas LN2 Storage vessel buffer storage vessel G1G2 Magnet cryostat VALVE BOX Schematic diagram of the cryogenic system.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
1 Sample Presentation Movies (avi, gif) of the mercury jet under impact of a proton beam A.Fabich, CERN August 2004.
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
Extraction and beamline progress B.Goddard TE/ABT.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
MERIT status A.Fabich CERN VRVS 9 th Oct A. Fabich, CERN, VRVS 9th Oct 2007.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos Thanks to: A.Fabich, H.Haseroth, F.Haug, J.Lettry,
New Magnet Design for FCC- ee Attilio Milanese, CERN 26 Oct presented by Frank Zimmermann.
Open Your Setting First. Sellect Phone from Your Setting.
Interaction Region and Detector
CLIC Handling Engineering Update
MERcury Intense Experiment Experiment Layout
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Experimental hall design in Japanese site
Arc magnet designs Attilio Milanese 13 Oct. 2016
16 T dipole in common coil configuration: mechanical design
Detector hall in mountain regions
Phone: + 40 (728) | +40 (733)
Why am I unable to connect and download transactions to Quicken?
Status on the PS/SPS  MERIT (nTOF11) interface
Detector hall in mountain regions
US-LARP Task: IR Commissioning
Nitrogen release from the TT2A cryogenic solenoid systems
Schematic diagram of the cryogenic system
MERIT – status and schedule
US-LARP Task: IR Commissioning
ITS Task Force Report Takeshi YAMAMOTO GSC16-PLEN-63 Document No:


Presentation transcript:

Phone 9.Sept.2004A.Fabich, CERN1 modifying beam line TT2A A.Fabich Phone conference 9.Sept.2004 All information available on

Phone 9.Sept.2004A.Fabich, CERN2

Phone 9.Sept.2004A.Fabich, CERN3 Going down, down … (in fact we are looking up here) TT2 with a slope of about 7 degree

Phone 9.Sept.2004A.Fabich, CERN4 Entrance to TT2A around the corner … around the corner

Phone 9.Sept.2004A.Fabich, CERN5 Option 2 Option 3

Phone 9.Sept.2004A.Fabich, CERN6 Elements to install/remove Blocks at entrance TT2A (around the corner) Metallic chassis of nToF cooling Quadrupole at entrance Dipole/quadrupole between option 2&3 Solenoid (4 tons) Beam attenuator (iron block 7.5 tons) Mercury loop …

Phone 9.Sept.2004A.Fabich, CERN7 contacts –Patrice Ziegler Former responsible of this tunnel –Christian Lacroix Given by Patrice Ziegler –J. Bernard (with S. Prodon) Invited by Helmut for meeting November 2003

Phone 9.Sept.2004A.Fabich, CERN8 Chat with Patrice For transport usually a track vehicle Lifting with pneumatic lifter Displacing a dipole one team for half a day –Also needed: vacuum, power cables, water Solenoid one day for transport Just recently they exchanged some quads