Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov. 2001 GLOBAL TRIGGER.

Slides:



Advertisements
Similar presentations
J. Varela, CERN & LIP-Lisbon Tracker Meeting, 3rd May Partitions in Trigger Control J. Varela CERN & LIP-Lisbon Trigger Technical Coordinator.
Advertisements

Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
ALICE Trigger System Features Overall layout Central Trigger Processor Local Trigger Unit Software Current status On behalf of ALICE collaboration:D. Evans,
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
Vienna Group Trigger Meeting CERN, 6 Dec Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
LECC 2004 – Boston – September 13 th L.Guiducci – INFN Bologna 1 The Muon Sorter in the CMS Drift Tubes Regional Trigger G.M. Dallavalle, Luigi Guiducci,
Vienna Group Trigger Meeting CERN, 18 July 2006 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
DT Track Finder, Global Muon Trigger, Global Trigger H. Bergauer, L. Boldizsar, M. Dallavalle, Ch. Deldicque, J. Erö, L. Guiducci, A. Jeitler, I. Jimenez.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Technical Part Laura Sartori. - System Overview - Hardware Configuration : description of the main tasks - L2 Decision CPU: algorithm timing analysis.
On-line Software Requirements for the Global Trigger, the Global Muon Trigger and the Barrel Muon Trigger Track Finder Claudia-Elisabeth Wulz & HEPHY Vienna.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Global Trigger H. Bergauer, L. Boldizsár, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Wilco Vink 1 Outline Optical station Vertex processor board Output board Latency.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Hannes Sakulin CERN Annual Review CERN, 24 Sep Global Trigger Global.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
Compact Muon Solenoid Christian Hartl CERN Austrian Doctoral Student June 2009 Institut für Hochenergiephysik, ÖAW CMS Global Trigger Control and Monitoring.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Implementation and Test of the First- Level Global Muon Trigger of the CMS Experiment Hannes Sakulin 1), 2), Anton Taurok 2) 1) CERN 2) Institute for High.
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.
Global Trigger, Global Muon Trigger H. Bergauer, L. Boldizsar, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer,
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
SLHC Meeting CERN, 21 May 2008 Presented by C.-E. Wulz Global Triggers,  TCA Technology M. Stettler, M. Hansen (CERN) C. Foudas, G. Iles (Imperial College)
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Trigger Group of the Institute for High Energy Physics, Vienna presented by Claudia-Elisabeth Wulz CPT Week, Plenary Session CERN, 18 April 2002 GLOBAL.
L1 Global Muon Trigger Simulation Status URL of this presentation:
Global Trigger, Global Muon Trigger H. Bergauer, Ch. Deldicque, J. Erö, A. Jeitler, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
Global Trigger Upgrades for SLHC
Production Firmware - status Components TOTFED - status
HCAL Data Concentrator Production Status
CMS EMU TRIGGER ELECTRONICS
Regional Cal. Trigger Milestone: Production & Testing Complete
ATLAS: Level-1 Calorimeter Trigger
Global Trigger and Global Muon Trigger
Global Trigger and Global Muon Trigger Latency
The Trigger Control System of the CMS Level-1 Trigger
Presentation transcript:

Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER

Internal Review, 6 Nov Claudia-Elisabeth Wulz2 URL’s and Publications This talk may be found at: General information about the Global Trigger and the Global Muon Trigger is available at: The following papers have been published: C.-E. Wulz: “Concept of the First Level Global Trigger for the CMS Experiment at LHC”, Nucl. Instr. Meth. A473/3 (2001) A. Taurok et al: “Implementation and Synchronization of the First Level Global Trigger for the CMS Experiment at LHC”, Nucl. Instr. Meth. A473/3 (2001)

Internal Review, 6 Nov Claudia-Elisabeth Wulz3 Board Layout of the Global Trigger Processor PSB (Pipeline Synchronizing Buffer)Input synchronization (6 boards including GMT) GTL (Global Trigger Logic) Logic calculation (1-2 boards) FDL (Final Decision Logic) L1A decision (1 board) TCS (Trigger Control System Module)Trigger Control (1 board) NEW: L1A (Level-1 Accept Module)Delivery of L1A (1 board) TIM (Timing Board)Timing (1 board) GTFE (Global Trigger Frontend) Readout (1 board)

Internal Review, 6 Nov Claudia-Elisabeth Wulz4 Global Trigger 9U Crate

Internal Review, 6 Nov Claudia-Elisabeth Wulz5 New: GMT solution with 1 logic board

Internal Review, 6 Nov Claudia-Elisabeth Wulz6 Main Global Trigger Rack Monitoring PC Private PC

Internal Review, 6 Nov Claudia-Elisabeth Wulz7 Auxiliary Global Trigger Rack In “official” version of rack layout ( two racks were foreseen for Global Trigger and Global Muon Trigger. The auxiliary Global Trigger Rack replaces the GMT rack, since the GMT is now entirely housed in the main Global Trigger rack. The proposed location of the main rack is E04 and of the auxiliary rack is E03 on the lower floor of zone 6. The auxiliary rack may house subsystem specific control modules, emulators and other units still to be defined.

Internal Review, 6 Nov Claudia-Elisabeth Wulz8 Global Trigger Progress and Milestones  Milestone March 2002: System Test This includes the backplane, the PSB-6U, GTL-6U, FDL-9U and TIM-9U. The GTFE and the GMT are not included. 4Backplane-6U: Prototype available 80 MHz GTL-plus signals, Channel Links 2mm connectors, 160 pin VME connectors Power Supplies: +5V, +3.3V, +2.5V, +1.8V

Internal Review, 6 Nov Claudia-Elisabeth Wulz9 PSB-6U 4PSB-6U: available. Channel Link receivers used. 1 Sync Chip for 2 channels. Monitoring of all Input bits for every BX Synchronisation checks for every BX

Internal Review, 6 Nov Claudia-Elisabeth Wulz10 PSB-9U Memories inside FPGA for Readout: 3-5 bx read by a L1A

Internal Review, 6 Nov Claudia-Elisabeth Wulz11 GTL-6U Automatic chip design and setup procedure developed. Layout for a 20 channel GTL (4 , 4 isol. e/ , 4 central jets, 4 fwd jets,  E T, E T miss, 8 jet multiplicities; other quadruplets can be connected alternatively for tests) is currently being finished pin Altera FPGA 20k400E included for evaluation. The layout of a conversion board to be used later in final 9U-crate is ready. It contains also memories in FPGA’s to send simulated test data to the GTL-6U board. Redefinition of jet input groups necessary for GTL-9U.

Internal Review, 6 Nov Claudia-Elisabeth Wulz12 GTL-9U Redefinition of jet input groups necessary

Internal Review, 6 Nov Claudia-Elisabeth Wulz13 FDL-9U Design with 8 final OR’s in progress. Some delay to be expected. Monitoring of all algorithm and L1A bits Prescaling of all algorithms Trigger Mask 8 L1A’s in parallel for partition modes

Internal Review, 6 Nov Claudia-Elisabeth Wulz14 TIM-9U The schematic design is in progress. The board contains a TTCrx chip and provides all timing signals for the GT crate. It will be used also in the Drift Tube Track Finder crates. An FPGA provides all necessary test functions to run the crate without the central TTC clock. It simulates also L1A requests for monitoring or to test the readout chain.

Internal Review, 6 Nov Claudia-Elisabeth Wulz15 Global Trigger Progress and Milestones  Milestone July 2002: TCS-9U ready TCS-9U: The main functions are defined but the design is still open for additional requests (calibration logic etc.) Trigger Partitions: The maximum number of subsystems is fixed (32). A preliminary agreement about the output to the DAQ Event Manager is has been reached. The input format of Fast Signals should be fixed soon. 5 coded bits per subsystem, sent as LVDS parallel data, are proposed. DSUB15 connectors are proposed. The TCS board provides data for the standard TTCvi as well as for a ”CMS- TTCvi”, but different interface boards are required. L1A driver module to be used with CMS-TTCvi has been conceived.

Internal Review, 6 Nov Claudia-Elisabeth Wulz16 TCS-9U environment

Internal Review, 6 Nov Claudia-Elisabeth Wulz17 L1A Driver Board

Internal Review, 6 Nov Claudia-Elisabeth Wulz18 Global Trigger Progress and Milestones  Milestone October 2002: 9U backplane ready The design with the GTLp 80 MHz and Channel Links is in progress.  Milestone June 2003: Complete GT prototype available Integration tests possible from this date. GTFE-9U: Conceptual design of readout board done.  Milestone July 2004: 12-channel PSB-9U available PSB-9U: Conceptual design done. Will have memories inside FPGA’s.  Milestone Nov. 2004: Complete GT available Includes GTL-9U module with all 32 input channels (4 , 4 isol. e/ , 4 non-isol. e/ , 12 jet channels,  E T, E T miss, 8 jet multiplicities). The Global Muon Trigger will have been completed by Nov

Internal Review, 6 Nov Claudia-Elisabeth Wulz19 Input / Output of Trigger Objects Muons from RPC, DT, CSC regional triggers to Global Muon Trigger –The muons are transferred as 40 MHz parallel LVDS signals using 68-pin SCSI-3 connectors and screened round twisted pair cables (type to be defined). Cable lengths less than 10 m. Calorimeter trigger objects from the Global Calorimeter Trigger to GT-PSB boards and MIP/ISO bits from the Global Calorimeter Trigger to the Global Muon Trigger – The trigger objects are transferred by 28-bit Channel Links. Redefinition of jet groups is necessary. Data rate is 40 MHz. To minimize latency the links run at 80 MHz and send each word twice. A skew clear cable will be used, the connectors are not yet defined. Cable lengths less than 5 m. Muon trigger objects from the Global Muon Trigger to the Global Trigger – The muons are transferred in parallel on the backplane.

Internal Review, 6 Nov Claudia-Elisabeth Wulz20 Input / Output of L1A and Control Signals The Global Trigger exchanges signals with the subsystem partitions, the TTC and DAQ systems. FAST SIGNALS from 32 subsystem partitions – 5 parallel LVDS signals carry coded status and/or command words – Cables and connectors to be defined L1A and Commands (B-Go) to 32 TTCvi – 32 cables. Details will depend on chosen TTCvi option. 2 serial links to DAQ PC – 1 S-link to DAQ readout, 1S-link to Event Manager (standard defined by DAQ) TTC – 1 optical link

Internal Review, 6 Nov Claudia-Elisabeth Wulz21 Latency, Installation and Commissioning The latency for the Global Trigger is still 8 bx. Internal checks within the system can all be done on the surface, even in the laboratory. Checks needing input from subsystems can also be done on the surface, but timing should be as close to the real one as possible (programmable delays on input, …). Final synchronzation needs to be done in the underground area. Time needed for commissioning will depend also a lot on other subsystems!

Internal Review, 6 Nov Claudia-Elisabeth Wulz22 Status and plans of software Use cases have been collected for the Global Trigger and Global Muon Trigger (and the Drift Tube Track Finder). A draft internal note “On-line Software Requirements for the GT, the GMT and the DTTF” can be found at: Transparencies have been shown in Sept and can be found at: wulz_swreq_sep01.ppt We plan to start to develop needed software next year, in collaboration with the CMS-wide effort.

Internal Review, 6 Nov Claudia-Elisabeth Wulz23 GT and GMT Manpower  System Engineer: A. Taurok  CERN Doctoral Student: H. Sakulin (Logic and hardware design of GMT, simulation studies)  Technicians: (shared with DTTF and other activities) H. Bergauer, M. Padrta, K. Kastner (in Vienna) Ch. Deldicque (at CERN)  Physicists: M. Fierro, A. Jeitler, C.-E. Wulz (mainly working on GT/GMT) N. Neumeister, P. Porth, H. Rohringer, L. Rurua (partly working on other activities) L. Boldizsar (GT simulation, about 4 months per year in 2001 and 2002)

Internal Review, 6 Nov Claudia-Elisabeth Wulz24 Conclusions Progress in hardware design essentially as planned Layout of GTL-6U almost ready, conversion board for 9U ready Timing module designed L1A Driver Board designed Other modules also on track (except maybe FDL) Design of TCS system updated Crate and rack layout updated Software concept (in coordination with DTTF and GMT and CMS-wide solutions) starting to be developed