Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1.

Slides:



Advertisements
Similar presentations
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Advertisements

20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
Token Bit Manager for the CMS Pixel Readout
Readout of the ATLAS Liquid Argon Calorimeters John Parsons Nevis Labs, Columbia University Representing the ATLAS LAr Collaboration ATLAS.
Beam Secondary Shower Acquisition System: Front-End RF Design (2) Student Meeting Jose Luis Sirvent PhD. Student 26/08/2013.
Beam Secondary Shower Acquisition System: Analogue FE installation schedule and Digital FE Status BE-BI-BL Jose Luis Sirvent Blasco
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
Universitat de Barcelona Università di Roma 'La Sapienza' Front End Electronics for the SPD of LHCb Electronics in Experimental High Energy.
Beam Secondary Shower Acquisition System: ICECAL_V3 Board and QIE10 Mezzanine Test preparations BE-BI-BL Jose Luis Sirvent Blasco 2.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
Uli Schäfer, Mainz Univ. / ATLAS L1 Calorimeter Trigger ATLAS L1 Calorimeter Trigger / DCS ATLAS L1 Calorimeter Trigger Overview Signals monitored by DCS.
ATLAS MDT Electronics Status ● ASD Chip Design (with Harvard) and Production – Full Rad-Hard test campaign completed – Production order for 67,400 parts.
Update on Electronics Activities Jim Pilcher University of Chicago 20-Jan-2006.
Beam Secondary Shower Acquisition System: The TWEPP14 experience BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent Blasco PhD.
CELeSTA CERN LATCHUP STUDENT SATELLITE TEST BOARD DEVELOPMENT AND CHARM PRELIMINARY RESULTS Raffaello Secondo ESA/ESTEC CERN Visit - DECEMBER 9 th 2014.
Beam Position Monitors: Front-End Components - BPM Acquisition Architecture - Components Selection - Irradiation Tests MOPOS Radiation Tests - JL Gonzalez.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
POSTER TEMPLATES BY: The ATLAS Tile Calorimeter (TileCal) at the LHC is used to measure the hadrons produced with polar angles.
6mm 【 Development of Readout Electronics for MPPC 】 We report the read out electronics of MPPC( Multi-Pixel Photon Counter ). MPPC is a new photodetector.
1 Ultra-Low-Power Radiation Hardened ADC for Particle Detector Readout Applications Esko O. Mikkola, 1 Visu Swaminathan, 2 Balasubramarian Sivakumar 2.
SPS Beam Position Monitors: MOPOS Front-End Electronics Jose Luis Gonzalez BE/BI 22/11/2013.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
10/07/2014.
CaRIBOu Hardware Design and Status
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
FF-LYNX (*): Fast and Flexible protocols and interfaces for data transmission and distribution of clock, trigger and control signals (*) project funded.
Beam Secondary Shower Acquisition System: Igloo2 SERDES Manual Initialization Student Meeting Jose Luis Sirvent PhD. Student 31/03/2014.
Work Package 3 On-detector Power Management Schemes ESR Michal Bochenek ACEOLE Twelve Month Meeting 1st October 2009 WPL Jan Kaplon.
Calorimeter upgrade meeting – Phone Conference– May 5 th 2010 First prototyping run Upgrade of the front end electronics of the LHCb calorimeter.
ASIC R&D at Fermilab R. Yarema October 30, Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
L.ROYER – TWEPP Lisbon – Sept-Oct A Dedicated Front-End ASIC for the ATLAS TileCal Upgrade L.Royer, S.Manen, N.Pillet, H.Chanal, R.Vandaële,
Mini-2 and MMFE-8 Status at U. Arizona Kenneth Johns, Charlie Armijo, Bill Hart, Karen Palmer, Sarah Jones, Kayla Niu, Jonathan Snavely, Dan Tompkins University.
TBL BPMs: electronics Antoni Gelonch, Yuri Kubyshin, Xavier Millán, Gabriel Montoro CTF3 Collaboration MeetingCERN, January 16-17, 2007 In collaboration.
LHCb Calorimeter Upgrade Meeting – 10th September 2012 – CERN LHCb Calorimeter Upgrade Electronics: ASIC solution status E. Picatoste, D. Gascon Universitat.
CHEF 2013 – 22-25th April 2013 – Paris LHCb Calorimeter Upgrade Electronics E. Picatoste (Universitat de Barcelona) On behalf of the LHCb group.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
1 Discussion on portable multichannel systems for MPGDs J. Toledo Universidad Politécnica de Valencia
FPGAs in ATLAS Front-End Electronics Henrik Åkerstedt, Steffen Muschter and Christian Bohm Stockholm University.
LHCb Calorimeter Meeting – 2 nd December 2015 Calorimeter upgrade update Universitat de Barcelona, Institut de Ciències del Cosmos ICC-UB Laboratoirede.
Beam Secondary Shower Acquisition System: Front End: QIE10+GBTx+VTRx Student Meeting Jose Luis Sirvent PhD. Student 25/11/2013.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
CALO Meeting–September 2 nd 2015 Calorimeter Upgrade Electronics: June 2015 Test Beam E. Picatoste Universitat de Barcelona, Institut de Ciències del Cosmos.
R2E Availability October 17 th 2014 ADC and Common development options G. Spiezia.
Beam Secondary Shower Acquisition System: Igloo2_UMd_Mezzanine and QIE10 preliminary testing PART II BE-BI-BL Jose Luis Sirvent Blasco
Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent.
Calorimeter upgrade meeting – LAL /Orsay – December 17 th 2009 Low noise preamplifier Upgrade of the front end electronics of the LHCb calorimeter.
Standard electronics for CLIC module. Sébastien Vilalte CTC
COTS Regulator Studies Derek Donley*, Mitch Newcomer, Mike Reilly *Hospital of the University of Pennsylvania, Radiation Oncology.
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
Beam Secondary Shower Acquisition System: RF design techniques for 40MHz ADC Student Meeting Jose Luis Sirvent PhD. Student 30/09/2013.
Beam Secondary Shower Acquisition System: ICECAL_V3 Mezzanine Board, initial developments BE-BI-BL Jose Luis Sirvent Blasco 2 Jose.
Beam Secondary Shower Acquisition System: TWEPP2013 Interesting news
Next generation rad-hard links
Student Meeting Jose Luis Sirvent PhD. Student 27/01/2014
New developments and inventory
Student Meeting Jose Luis Sirvent PhD. Student 17/02/2014
J.L. Sirvent1,2, B. Dehning1, J.Emery1, A. Diéguez2
SPS Beam Position Monitors: Front-End Electronics
Calorimeter Upgrade Meeting
VELO readout On detector electronics Off detector electronics to DAQ
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
Presentation transcript:

Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1

1.Board Concept Front-end Acquisiton Board for Secondaries (FABS) 2 POWER STAGE VTRX IGLOO2 Dev.Kit GPIO Header Power Connector ADC ADS5272 SMA TX_P SMA TX_N SMA RX_P SMA RX_N ICECAL CH_1 ICECAL CH_2P ICECAL CH_2N Genera IN_1 Genera IN2 Single to Differential Single to Differential ICECAL CH_2 Clock Conditioning ICECAL CH_1P ICECAL CH_1N ICECAL I_Bias Circuits

LHC_PIPE 3 BWS pCVD SCINTILLATOR PMT Splitter Power Adapters 2.Why we do this? Development of first prototype for proof-of-concept evaluation

3. Our Resources for this board: Original ICECAL_V2 Test-Board schematics I’ve been in contact with ICECAL’s main designers: Eduardo Picatoste & David Gascón ICECAL is a serious candidate to our system since is the natural evolution of the Readout ASIC we´re using now in the surface. The designers kindly provided 2 x ICECAL_V2 samples, schematics of their test board and many useful advices. (Thanks guys!) Version 2  1 Channel, no multiplexer, no I_Bias Cirquits, no ADC Driver, no Delay line, but useful for our prototype. Version 3  4 Channels with everything included (Smaller test board needed). Soon under evaluation. The task I’m carrying out: I’ll modify their test board to our needs. Lars also provided the schematics of his VTRX adapter module (Custom SFP-HSMC Adapter Board)

5 4. A quick look at some modifications

6

7

8

9 ICECAL_CH2 ADC 2X Single to Differential I_Bias Circuit 5. Routing Status so far: (A general overview) Linear Regulators Bank

10 5. Routing Status so far: (Linear regulators bank)

11 5. Routing Status so far: (3d View)

Voltage Regulators: TL1963-KTT  Qualified up to 1KGy by PSI for MOPOS [1,3] Analogue to Digital Converter : ADS5272  Total TID 88KGy for ATLAS, teted at IUCF / LANSCE WNR [2] Differential operationals (Gen. Inputs):THS4521  Qualified up to 1KGy by PSI for MOPOS [1,3] Readout ASIC:ICECAL_V2  RadHard development Programmable Delay Lines:3D3418  Total TID 5Krad [4] Rail-to-Rail Comparators LT1711  Not Qualified (ICECAL Clock conditioning) LVDS _CMOS Receiver DS90LV048A  Tested with 60MeV p beam up. Qualified up to TID = 0.7KGy [6] (ADC Clock Conditioning) Bias Operationals (I_BIAS Circuit) OPA602  Tested up to 2.7KGy (Neutrons), but not qualified [5] Dual Current Source / Current SinkREF200  Not Qualified There are some additional components to add to this list [1] C. Deplano ∗, J. Albertone, T. Bogey, J. L. Gonzalez, J. J. Savioz RADIATION RESISTANCE TESTING OF COMMERCIAL COMPONENTS FOR THE NEW SPS BEAM POSITION MEASUREMENT SYSTEM. CERN, Geneva, SwitzerlandRADIATION RESISTANCE TESTING OF COMMERCIAL COMPONENTS FOR THE NEW SPS BEAM POSITION MEASUREMENT SYSTEM [2] Helio TAKAI. Characterization of COTS ADC radiation properties for ATLAS LAr calorimeter readout upgrade. TWEPP13, September 2013Characterization of COTS ADC radiation properties for ATLAS LAr calorimeter readout upgrade [3] J.Albertone, T.Bogey, C.Delplano, J.L. Gonzalez. Logarithmic Amplifiers, ADC Drivers and Voltage Regulators: Radiation Test Report at PSI-PIF. 2013Logarithmic Amplifiers, ADC Drivers and Voltage Regulators: Radiation Test Report at PSI-PIF [4] J. Gu. EMU DAQ MotherBoard. ERS, CERN Nov EMU DAQ MotherBoard [5] F. J. Franco, Y. Zong, Juan Casas-Cubillos, M. A. Rodríguez-Ruiz, and J. A. Agapito. Neutron Effects on Short Circuit Currents of Op Amps and Consequences. IEEE TRANSACTIONS ON NUCLEAR SCIENCE, VOL. 52, NO. 5, OCTOBER Neutron Effects on Short Circuit Currents of Op Amps and Consequences [6] G. Di Mattia Thesis. Test del funzionamento e della resistenza alle radiazioni dell’elettronica per il trigger di primo livello dell’esperimento ATLAS. Università degli Studi di RomaTest del funzionamento e della resistenza alle radiazioni dell’elettronica per il trigger di primo livello dell’esperimento ATLAS “La Sapienza” Considering radiation: Components and Qualifications