RHIC Run th Time Meeting Tuesday 5 June 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 06/05/2012 Time Meeting, Run 12
Safety Training Ed Lessard 2 06/05/2012 Time Meeting, Run 12
SP's Slide - Delivery of Au-Cu stores to Physics was going on smoothly, until, last Friday, ~1700, an eagle and a groundhog came around (the next, modern technology based - Lafontaine fable ?). The power dip generated a huge amount of work : * ~3500 alarms went on on Friday at ~1700 * RHIC beams were recovered only late OWL, Sunday morning, ~36 hrs later * We are in still the process of fully recovering – more in next presentations. - NSRL is running, - BLIP too. Program for the coming week : - Tomorrow Wed. 6 is Maintenance Day, Access at experiments STAR needs 4-6 hrs, PHENIX can do with much less - Wednesday next week, 13 June, is (last) APEX,
Experiments and Machine, Status RHICYun Luo STARYifei Zhang PHENIXXiaochun He RCFMichael Ernst BLIPLen Mausner APEXMei Bai Operation Peter Ingrassia MaintenanceRaymond Zaharatos 4 06/05/2012 Time Meeting, Run 12
MAINTENANCE, Wed. 6 June 0700 Secure Booster and AGS equipment as necessary for access. Begin Booster LOTO as necessary Secure AGS equipment for LOTO as necessary. LOTO AGS prep for any needed access 0830 Dump RHIC, ramp all down to zero. Prepare for RHIC access- CA to most areas, HP surveys as necessary. STAR open at PHENIX on XA 1300 Begin RHIC sweeps as necessary Restore equipment after transfer switch tests Tunnel secured, hysteresis ramp. Sweep exps 1600 Physics restoration
6 Next Time Meeting Tuesday 12 June 1:30 Snyder MANY THANKS FOR YOUR PARTICIPATION AND FOR YOUR CONTRIBUTIONS MANY THANKS FOR YOUR PARTICIPATION AND FOR YOUR CONTRIBUTIONS 06/05/2012 Time Meeting, Run 12