Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
WAO Travis Shrey RHIC Machine Specialist Collider-Accelerator Dept Brookhaven National Laboratory 10/30/2014.
July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
Outages During the Run Coping with the Power Company August 9, 2012.
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
Accelerator Support and Maintenance Run 14. Maintenance/Changeover Day Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Machine-Experiments January 19, 2005 Machine status.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow AGS hrs CA Specific Jobs only. AGS hrs CA Specific Jobs only. RHIC.
RHIC Run th Time Meeting Tuesday 5 June 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 06/05/2012 Time Meeting, Run 12.
Maintenance and Accelerator Support RHIC StartUp10.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Maintenance and Accelerator Support RHIC Start Up 12.
May 06, 2013 Photo by Greg Vogel. Thursday, April 18, some tunnel work had to be suspended and many planned jobs had to be postponed due to the flooding.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
4K Wave Cold in both rings PS gave us e-lens PS work during Day PP12 lattice test evening First Collisions Overnight Stores 109x109 Start Physics The Story.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
 Safety  Schedule: Past, Present and Future  RHIC and Experiments Reports  Machine and Systems Reports  AOB.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Run 10 Start-up Status
Haixin Huang AGS Cold Snake: Status and Plans.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Accelerator Support and Maintenance Startup for Run 13.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Accelerator Support and Maintenance Startup13. Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
Injector Status Jan. 19, 2016 Time Meeting Haixin Huang.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
Injector Status Jan. 26, 2016 Time Meeting Haixin Huang.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Maintenance and Efficiency
Presentation transcript:

Maintenance and Accelerator Support RHIC Start Up 12

Accelerator Status: EBIS, LINAC, Booster and AGS are presently setting up with beam. EBIS, LINAC, Booster and AGS are presently setting up with beam. Access to AGS and Booster scheduled around failure. Access to AGS and Booster scheduled around failure. Submit desired jobs to the job request system. Submit desired jobs to the job request system. AGS extraction setup next week AGS extraction setup next week No Access to U downstream, W, X and Y lines. No Access to U downstream, W, X and Y lines. Any access to be scheduled. Any access to be scheduled. Booster Maintenance Next Wednesday 1/18/ hrs Booster Maintenance Next Wednesday 1/18/ hrs

RHIC status: Tunnel and IRs on Restricted Access. Tunnel and IRs on Restricted Access. Shielding in place, awaiting inspection. Shielding in place, awaiting inspection. No Access, eves and nights starting January 20 th. No Access, eves and nights starting January 20 th. Presently ODH0 in the tunnel. Presently ODH0 in the tunnel. Berm areas of RHIC are secured, scheduled access only. Berm areas of RHIC are secured, scheduled access only. Tomorrow and Thursday : Emergency generator transfer switch tests, momentary ACS outages possible. Tomorrow and Thursday : Emergency generator transfer switch tests, momentary ACS outages possible.

Next week: Controlled/Radiation area postings at RHIC, ring road. Controlled/Radiation area postings at RHIC, ring road. Wednesday – Saturday (Following 4k wave): Wednesday – Saturday (Following 4k wave): Secure any normally locked/fenced areas as necessary. Secure any normally locked/fenced areas as necessary. Power supply and Cryogenic work during the day/evening. Power supply and Cryogenic work during the day/evening. Beam work evenings/nights starting 1/21 Beam work evenings/nights starting 1/21 Select areas of the ring secured during the daytime. Schedule for securing TBD. Select areas of the ring secured during the daytime. Schedule for securing TBD. When ready for beam, secure experimental areas When ready for beam, secure experimental areas

During the Ramp Up. Injectors will remain closed and running with beam. Injectors will remain closed and running with beam. Any RHIC access will be scheduled at daily meetings. Any RHIC access will be scheduled at daily meetings. Daily schedules will be published on the Web and displayed on the CATV system. Daily schedules will be published on the Web and displayed on the CATV system. E-lens Phase shifter tests will occur after power supply checkout is complete. E-lens Phase shifter tests will occur after power supply checkout is complete. Regular maintenance days will be scheduled after the ramp up period is completed and Physics is declared. Regular maintenance days will be scheduled after the ramp up period is completed and Physics is declared.