SYSTEM ANALYSIS.

Slides:



Advertisements
Similar presentations
Systems Analysis and Design in a Changing World
Advertisements

Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
Chapter 2 Analyzing the Business Case.
Environmental Management System (EMS)
ISO General Awareness Training
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 18-1 Accounting Information Systems 9 th Edition Marshall.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Systems Development I—Overview Ken PeffersUNLVMarch 2004.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
The Analyst as a Project Manager
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Pertemuan 15 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Lecture 3 Strategic Planning for IT Projects (Chapter 7)
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Imran Ghaznavi Course Code: MGT557 COMSATS Strategic Human Resource Management.
Sharif University of Technology Session # 4.  Contents  Systems Analysis and Design Sharif University of Technology MIS (Management Information System),
The Recruitment and Selection of Travel and Tourism Staff Human Resource Management -Session 4 Suhel Khan.
SYSTEM ANALYSIS AND DESIGN
Systems Analysis and Design: The Big Picture
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Initiating and Planning Systems Development projects
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
S/W Project Management
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Process Standardization Project
Chapter 13: Developing and Implementing Effective Accounting Information Systems
ACCOUNTING INFORMATION SYSTEMS
1 ECGD3110 Systems Engineering & Economy. 2 Lecture 1 Introduction to Engineering Economics.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 3 Systems Planning and Selection 3.1.
Module 4: Systems Development Chapter 12: (IS) Project Management.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
IS2210: Systems Analysis, Systems Design and Change Twitter:
SYSTEMS ANALYSIS AND DESIGN LIFE CYCLE
Computers Are Your Future © 2008 Prentice Hall, Inc.
Proposals on standardisation process in ESS, The Hague_ ESS net Preparation of Standardisation 1 Proposals on standardisation process.
 Job evaluation is the process of systematically determining the relative worth of jobs to create a job structure for the organization  The evaluation.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Senior Design II proposal A step-by-Step review. What is Senior Design?  Senior Design is a sequence of two courses during two consecutive semesters.
Develop Project Charter
Application of System Study in Libraries By Bhupendra Ratha, Lecturer S. L. I. Sc., D.A.V.V., Indore Id:
Professional Certificate in Electoral Processes Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
The techniques involved in systems analysis Explanation of a feasibility study:Explanation of a feasibility study: –economic, –legal, –technical, –time.
1 Week 7 - System analyst IT2005 System Analysis & Design.
Evaluation of Budget Process for Information Technology Projects Proposed Final Report February 16, 2006 Joint Legislative Audit & Review Committee Karen.
TOTAL QUALITY MANAGEMENT
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
David M. Kroenke and David J. Auer Database Processing Fundamentals, Design, and Implementation Appendix B: Getting Started in Systems Analysis and Design.
The Feasibility Study The objective of a feasibility study is to find out if an project can be done and if so, how The objective of a feasibility study.
Introduction to System Analysis and Design MADE BY: SIR NASEEM AHMED KHAN DOW VOCATIONAL & TECHNICAL TRAINING CENTRE.
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Topic 2 – Techniques involved in Systems Analysis Unit 1 – Database Analysis and Design Advanced Higher Information Systems St Kentigern’s Academy.
Accounting systems design & evaluation 9434SB 18 March 2002.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
Lorelyn T. Dumaug IDENTIFICATI ON FORMULATION APPRAISAL AND APPROVAL FUNDING IMPLEMENTATION EVALUATION.
Systems Analysis and Design in a Changing World, Fifth Edition
C. What is a Feasibility report
Fundamentals of Information Systems, Sixth Edition
FEASIBILITY STUDY Feasibility study is a means to check whether the proposed system is correct or not. The results of this study arte used to make decision.
the Public Procurement Audit Practical Guide
Chapter 2 par Overview.
Chapter - 2 The System Development Life Cycle
Presentation transcript:

SYSTEM ANALYSIS

SYSTEM ANALYSIS The basis objective of system analysis is to determine the feasibility of a system, and how it will meet the requirement of system users. System analysis involves the following aspects of system development: Feasibility study. Requirement analysis. Structured analysis.

WHO IS SYSTEM ANALYST??? A system analyst is a person who conducts a study, identifies activities and objectives and determines a procedure to achieve the objectives. Designing and implementing systems to suit organizational needs are the functions of the system analyst. He play a major role in seeing business benefit from computer technology. The analyst is a person with unique skills.

ATTRIBUTES OF AN SYSTEMS ANALYST Knowledge of people. Knowledge of business functions. Knowledge of data processing principles. Ability to communicate. Flexibility. An analytical mind. Well educated with sharp mind.

FEASIBILITY STUDY Feasibility study is the process of determining whether a system is appropriate in the context of organizational resources and constraints and meet the users requirements. The basic objective of feasible study are to identify whether the proposed system is feasible .During feasibility study analysis, the analyst consider 3 main types of feasibility – Technical, Economical and Operational feasibility, all of which are interrelated.

OBJECTIVES OF FEASIBILITY ANALYSIS To identify the deficiencies in the current system. To determine objectives of the proposed system. To acquire a sense of scope of the system. To identify the responsible users. To determine whether it is feasible to develop the new system.

TYPES OF FEASIBILITY TECHNICAL FEASIBILITY: During this study, the analyst identifies the existing computer system(hardware and software) of the concerned department and determines whether these technical resources are sufficient for the proposed system or not. The main objective of technical study is to determine whether the project is technically feasible. ECONOMIC FEASIBILITY: Economic feasibility is the most imp. Study that determine the costs and benefits of the proposed system and compare it with the budget. costs/benefit analysis is the common method. If benefit are more than costs, then analyst decide to continue the project otherwise consider it economically not feasible.

Operational feasibility: During operational feasibility study, it is determined whether the system will operate in the way that users wants. Operational feasibility depends upon human resources for the development & implementation of the system. SOCIAL FEASIBILITY: Social feasibility is a determination of whether a proposed project will be acceptable to people or not. MANAGEMENT FEASIBILITY: It is a determination of whether a proposed project will be acceptable to management or not. LEGAL FEASIBILITY: Legal feasibility is a determination of whether the proposed project infringes on known acts, statutes, as well as any pending legislation.

STEPS IN FEASIBILITY STUDY CONSTITUTION OF A PROJECT TEAM: The objective behind constituting a project team is that future users of the system should be involved in its design and implementation. Their knowledge and experience in the operations are essential to success. IDENTIFICATION OF POTENTIAL CANDIDATE SYSTEMS: Keeping in mind the objectives for which a new system is required, alternative candidate system should be identified. A no. of system should be identified so that project team has several alt. to choose a system that best fits organization needs.

IDENTIFICATION OF CHARACTERISTICS OF CANDIDATE SYSTEMS: At this stage, the team identifies the various characteristics of candidate systems so that those systems that do nit meet the initial selection criteria are eliminated as it is difficult and time consuming to have a detailed evaluation of large no. of system. PERFORMANCES AND COST EVALUATION: At this stage, performance of each system is evaluated against the performance criteria set before the start of the feasibility –study. Whatever the criteria may be set there has to be as close as match as possible. the system also evaluated in term of costs.

WEIGHING SYSTEM PERFORMANCE AND COST DATA: Often performances and cost move in the same direction that is if cost is high, it is associated with high performance though it may not be true for all systems. This problem may be overcome by assigning certain weights to performance criteria &costs. SELECTION OF THE BEST SYSTEM: Based on the weights assigned to different system, the system may be selected that has the highest weight score. Other organizational factors like organizational policy to procure capital goods, resources constraints, suppliers reputation etc. taken into account.

PREPARATION OF FEASIBILITY REPORT: When the feasibility study is complete the project team prepares a feasibility report on the basis of which management takes suitable action including the final selection of system. Usually the project report contain the following items:- Covering Letter. Table Of Contents. Overview. Description Of Existing System. Systems Requirements.

Description Of Proposed System. Development Plan. Technical Feasibility Findings. Costs And Benefits. Operational Feasibility Findings. Alternatives Considered/Rejected. Recommendations And Conclusions.

THANK YOU