Cellular Probes Kansas City Evaluation Cellular Probe Feasibility Study Cellular Probe Feasibility Study.

Slides:



Advertisements
Similar presentations
INRIX Data Evaluation I-95 Corridor Coalition – Vehicle Probe Project (VPP) I-95 Corridor Coalition – Vehicle Probe Project (VPP) January 3, 2012.
Advertisements

PROJECT KICK-OFF Jason Collins, Ph.D., P.E., AICP October 14, 2008.
Ramp Metering Pilot Project May 11th, 2010 E. Jason Sims, P.E. Kansas City Scout TMC Manager.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
1 SDDOT SAFETY PROGRAM. 2 Who Am I ??? CLIFF REUER TRAFFIC & SAFETY ENIGNEER SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION OFFICE OF PROJECT DEVELOPMENT
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
February 9, 2006TransNow Student Conference Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages.
Congestion targets & Road pricing Steve Gooding Director, Roads Performance and Strategy Steve Gooding Director, Roads Performance and Strategy.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Peter Koonce TRB Annual Meeting January 9, 2005 Best Practices for Signal Operations Best Practices for Signal Operations – Lessons Learned from the Portland.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
May 22, 2003 ITSA Executive Networking Session #63 Hidden Text.
Truths and Myths about Traffic Data Truths and Myths about Traffic Data ITSA Presentation June 2007 AirSage Proprietary & Confidential.
Aaron B Wilson, EIT WesTech Engineering, Inc., SLC, UT Mitsuru Saito, PhD, PE Brigham Young University, Provo, UT ITE Western District Annual Meeting Santa.
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
May 7, 2013 Yagnesh Jarmarwala Phani Jammalamadaka Michael Copeland Maneesh Mahlawat 14 th TRB National Transportation Planning Applications Conference.
National Road Pricing Conference June 4, 2010 Mark Burris, Texas Transportation Institute Jessie Yung, Federal Highway Administration.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Wisconsin Traffic Operations and Safety Laboratory Department of Civil and Environmental Engineering University of Wisconsin-Madison The Wisconsin DOT.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
June 2005 Intelligent Transportation Systems 101 June 21, 2005.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
Minnesota Guidestar Evaluation of Non-Intrusive Technologies for Traffic Detection Farideh Amiri Minnesota Department of.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
I-394 MnPASS Technical Evaluation Preliminary Findings March 23, 2006 Doug Sallman – Cambridge Systematics, Inc.
I-394 MnPASS Technical Evaluation Doug Sallman – Cambridge Systematics, Inc.
Accuracy in Real-Time Estimation of Travel Times Galen McGill, Kristin Tufte, Josh Crain, Priya Chavan, Enas Fayed 15 th World Congress on Intelligent.
NATMEC June 5, 2006 Comparative Analysis Of Various Travel Time Estimation Algorithms To Ground Truth Data Using Archived Data Christopher M. Monsere Research.
Tolling and Pricing Opportunities Under the Federal-aid Highway Program January 2006.
ITS Georgia | June What is the role of ITS in the emerging public/private partnership transportation market in Georgia? ITS Georgia Monso_Julia.
Travel Time and Reliability: Is Data Quality a Showstopper? The Georgia Navigator Experience Angshuman Guin URS Corporation
Introduction The Austin metro area is one of the fastest growing in the country – State Highway 130; easing the pressure – Study of Sections 5-6 How GTG.
Robert L. Bertini Sirisha M. Kothuri Kristin A. Tufte Portland State University Soyoung Ahn Arizona State University 9th International IEEE Conference.
January 23, 2006Transportation Research Board 85 th Annual Meeting Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems.
Georgia’s Intelligent Transportation System
Tennessee DOT SmartWay Update Presented by: Don Dahlinger, P.E. – TDOT September 2006 Presented by: Don Dahlinger, P.E. – TDOT September 2006.
Projects of National and Regional Significance Program.
AASHTO Standing Committee on Performance Management SURFACE TRANSPORTATION AUTHORIZATION Task Force - System Operations: Francis Ziegler, North Dakota,
Testing the Hypothesis Bill Schafer Director, Strategic Planning March 21, 2007 Can Rail Reduce Congestion?
July 13, 2005ITE District 6 Annual Meeting Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
SunSatFriThursWedTuesMon January
Transpo 2012 Yan Xiao, Mohammed Hadi, Maria Lucia Rojas Lehman Center for Transportation Research Department of Civil and Environmental Engineering Florida.
Brian Kary – Freeway Operations Engineer Minnesota Department of Transportation.
COMMUNICATING PERFORMANCE TO VDOT Sanhita Lahiri, P.E., PTOE 1.
1 C RASH I NVESTIGATION AND R ECONSTRUCTION T ECHNOLOGIES AND B EST P RACTICES T ASK O RDER DTFH61-12-D T-5009 D ECEMBER 16, 2015.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Technology Solutions for Tolling and Traffic Management N Video Detection Technology and Marketplace Michael Wieck Business Development Manager, Roadway.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Safer Work Zones Through ITS Interim Traffic Management System Florida Department of Transportation Tahira Faquir.
The Downtown Seattle Bus Monitoring System A New Way of Collecting and Analyzing Transit Travel Time Data Owen Kehoe, PE, PTOE King County Metro Transit.
Traffic Management System Real Time Motorist Information
Nevada Next Generation 511 System 9 months to design, test and deploy
Overview of FHWA CMAQ & System Performance Measures
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Traffic Signal Performance Measures in a Small Urban Area
Public Workshop #1 August 18, 2010.
Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages CTS Transportation Seminar Series, January.
Presented by Ronald Boodhoo, MSc, MBA Alvin Shultz, MSPH
Issaquah-Fall City Road
Board Transportation Committee May 6, 2014
Indiana Department of Transportation
Meadow Lake Boulevard Street Extension Project
Methodology and Results
Parks Highway Reconstruction: Lucas Road to Big Lake Road
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

Cellular Probes Kansas City Evaluation Cellular Probe Feasibility Study Cellular Probe Feasibility Study

Cellular Probes Kansas City Evaluation

Cellular Probe Feasibility Study Project Background

Cellular Probes Kansas City Evaluation

Cellular Probe Feasibility Study Overview Project History Project Team –Kansas Department of Transportation –Cellint –Kansas City Scout –Telvent Farradyne Project Funding

Cellular Probe Feasibility Study KDOT Goals Determine the general feasibility of the cell probe technology. Determine possible applications for the cell probe average speed data. –Incident detection –Speed mapping –Travel times –Performance measures

Cellular Probe Feasibility Study Project Timeline January 2006 – Discussions begin between KDOT and Cellint. February 2006 – Scout begins providing speed data to Cellint. March 2006 – Cellint creates a website with speed bands.

Cellular Probe Feasibility Study Project Timeline (Cont.) June through August, 2006 – Cellint provides blind speed data along the I-435 study corridor. Winter 2006/2007 – Scout analyzes the blind test data and produces a preliminary report. Summer 2007 – Final report to be completed.

Cellular Probes Kansas City Evaluation

Cellular Probe Feasibility Study Data Analysis

Cellular Probes Kansas City Evaluation

Cellular Probe Feasibility Study Analysis Overview General Feasibility Analysis Review how the Cellint speed bands change during accidents and construction lane closures. Detailed Speed Data Analysis Cellint provides blind cell probe speed data so Scout can perform an independent study.

Cellular Probe Feasibility Study

Cellular Probes Kansas City Evaluation

Cellular Probe Feasibility Study Methodology

Cellular Probes Kansas City Evaluation

Cellular Probe Feasibility Study Approach Slowdown analysis –Use two algorithms –Identify slowdowns –Match slowdowns –Compare results (percent matched, average lag)

Cellular Probe Feasibility Study

Approach General characterization –Excellent, good, fair, or poor –Subjective criteria

Cellular Probe Feasibility Study Approach Category analysis –Binned speeds (from ATMS) <25mph (red) 25-35mph (yellow) >35mph (green) –Compared bin for each time interval –R=R, Y=Y, and (R+Y)=(R+Y)

Cellular Probe Feasibility Study

Cellular Probes Kansas City Evaluation

Cellular Probe Feasibility Study Conclusions

Cellular Probes Kansas City Evaluation

Cellular Probe Feasibility Study Advantages No ROW required No FTEs required No DOT maintenance required Public-private partnerships Continuous coverage –Smart Work Zones Direct measure of travel times

Cellular Probe Feasibility Study Caveats Time lag –3 to 12 min Congestion sensitivity –Why? –Pro or con? –Market saturation dependant? Volume sensitivity

Cellular Probe Feasibility Study Summary Not for all applications… ATIS Travel times  Incident detection Performance measures

Cellular Probe Feasibility Study Summary Viable technology –Clearly reflects traffic Growing data source Young technology

Cellular Probes Kansas City Evaluation

Cellular Probes Kansas City Evaluation K. Mark Sommerhauser Kansas City Scout Eric Meyer, P.E., PhD Telvent Farradyne Inc K. Mark Sommerhauser Kansas City Scout Eric Meyer, P.E., PhD Telvent Farradyne Inc Cellular Probe Feasibility Study