Presentation and review of TTA-report: Exploration and Reservoir Characterisation Summary Background Project Proposal.

Slides:



Advertisements
Similar presentations
Seismic Stratigraphy EPS 444
Advertisements

Automated Software Testing: Test Execution and Review Amritha Muralidharan (axm16u)
, Beograd Dr. Wolfgang Bauer CEO 360plus Consult GmbH
Donald Cooper Pamela Schindler
Geothermal Energy Technology and International Development Forum ThermaSource, Inc.: A Drilling Point of View Louis Capuano, Jr Chief Executive Officer.
Working Group 1: Exploration – focusing on RDT in areas of geophysics and geology  Who are we  Our Mission  Goal for this workshop  Process  Speakers.
Steinar Njå Norwegian Petroleum Directorate Licensing system in Norway.
1 SYS366 Week 1 - Lecture 2 How Businesses Work. 2 Today How Businesses Work What is a System Types of Systems The Role of the Systems Analyst The Programmer/Analyst.
An Introduction to the Hennepin County Hennepin County GIS Technical Advisory Group (eGTAG) 10/20/2009.
Evaluation. Practical Evaluation Michael Quinn Patton.
OVERVIEW OF PETROLEUM ENGINEERING.
Geologic Analysis of Naturally Fractured Reservoirs 2nd Edition, R. A
Action Research In Organizational Development. Action Research Coined by Kurt Lewin (MIT) in 1944 Reflective process of progressive problem solving Also.
Marginal Field Development Advances in 3D Geological Modeling: How it can help?
More on Data Mining KDnuggets Datanami ACM SIGKDD
Mantova 18/10/2002 "A Roadmap to New Product Development" Supporting Innovation Through The NPD Process and the Creation of Spin-off Companies.
New Directions and the Importance of Geology Susan Smith Nash, Ph.D. AAPG.
Sedimentology & Stratigraphy:
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
Sheila Roberts Department of Geology Bowling Green State University.
Copyright © Optim Inc. and University of Nevada John N. Louie University of Nevada, Reno Satish Pullammanappallil Bill Honjas Optim Inc.
Investment Portfolio Methodologies Pertemuan Matakuliah: A Strategi Investasi IT Tahun: 2009.
1 POSC Special Interest Group Practical Well Log Standards (PWLS) Norwegian Petroleum Directorate Tuesday June Eric Toogood, Project Manager Diskos.
Evaluation methods and tools (Focus on delivery mechanism) Jela Tvrdonova, 2014.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Forum for Reservoir Characterisation, Reservoir Engineering and Exploration Technology Cooperation Officially opened by Jens Stoltenberg 17. November 1995.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
EVALUATING PAPERS KMS quality- Impact on Competitive Advantage Proceedings of the 41 st Hawaii International Conference on System Sciences
OIL AND GOVERNANCE State-owned Enterprises and the World Energy Supply GEMBA 11.
Classification: Statoil internal Status: Draft
Business Process Change and Discrete-Event Simulation: Bridging the Gap Vlatka Hlupic Brunel University Centre for Re-engineering Business Processes (REBUS)
Classification: Statoil Internal Status: Draft Technology Strategy Co-operation Force meeting
5.2 Recommended projects The gaps suggested in this report are suggested as the basis for further discussions and generation of project proposals. A stratigraphic.
Geosciences group Organization. Organization of reservoir engineering tasks The too many shortcuts taken by BEOC in their basic evaluations, and the absence.
February 2002 Joint Chalk Research Experiences and Plans.
Mysoltani.ir سایت فیلم روشهای مشارکتی Technology Foresight Foresight is about preparing for the future. It is about deploying resources in the best.
Chapter 3 ©The McGraw-Hill Companies, Inc., 2001Irwin/McGraw-Hill Donald Cooper Pamela Schindler Business Research Methods.
Has gender been mainstreamed in YOUR organization? CAPWIP MGGR Nov 2007.
Future Challenges in Cooperative Petroleum Research Future Challenges in Cooperative Petroleum Research StatusStatus ProgressProgress Grafisk
Force Workshop “Future directions in Petroleum Research”, April “Cooperation between Universities and Research Institutes for the.
Geophysical SIG Towards reduced cycle time In Geophysical Work Processes.
Induced Seismicity Consortium (ISC) Quarterly Review Meeting, Q Quantifying Seismic Hazard from Subsurface Fluid Injection and Production (SFIP)
Fractures play a major role in many tight reservoirs such as shale, carbonate, and low permeability sand by providing fluid flow conduits, for this reason.
WYE CITY GROUP on Statistics on Rural Development and Agricultural Household Income Naman Keita FAO, Statistics Division Way forward for the Wye City Group:
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Launched on 17th November Phase II Phase III Phase IV FORCE has 22 members; 20 oil companies, NPD and NRC (observer).
Careers in Petroleum Geology Slides from aapg.org Presented by Rick Abegg Chevron.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
New Strategies in Petroleum Research Introduction By Kristian Kolbjørnsen, Chairman FResCo.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Joel Ben-Awuah. Questions to Answer What do you understand about pseudo-well? When to apply pseudo-well? What are the uncertainties in reservoir modeling?
Geophysics Present Status Gap Analysis Future Focus Outcome: Message and Feedback.
Martin Tygel Unicamp - Brazil), Rui Pena Reis (Univ. Coimbra - Portugal), Bjorn A. Rasmussen (Simula - Norway) Martin Tygel Unicamp - Brazil), Rui Pena.
Evaluating GIS for Disaster Management Bruce Kinner GEOG 596A.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Data Management: Data Processing Types of Data Processing at USGS There are several ways to classify Data Processing activities at USGS, and here are some.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,All Rights Reserved. Part One INTRODUCTION TO BUSINESS RESEARCH.
GEOINFORMATIC DISCIPLINES FOR OIL&GAS GEOLOGISTS PEOPLES’ FRIENDSHIP UNIVERSITY OF RUSSIA Engineering Faculty Department of Mineral Deposits and Exploration.
Evaluation What is evaluation?
Contact: Prof. Quentin FisherDr Rachael Spraggs e: t: t: Theme: Deep Water Centre.
11/19/2016 kochjo Earth and Reservoir Modelling Committee Past, Present And Future Jens-Ole Koch, Committee Leader.
Past and Future Phase 2 – Summary & Phase 3 – Future of FORCE
GeoFluids 2020 Management Summary
of these basic elements
The Swedish National audit Office Theme – SAI and Government Oversight Promotion of IT IT support in the Judicial Chain Presentation at the 7th Performance.
Hydro research focus 2004 Force area topics
WOC 1: Exploration & Production of Natural Gas
Presentation transcript:

Presentation and review of TTA-report: Exploration and Reservoir Characterisation Summary Background Project Proposal

Technology Strategy for Exploration and Reservoir Characterization Lead Party: FORCE ( Work Group: Arild Haugen (NPD/FORCE) John R Berry (BP) Per Arne Bjørkum (Statoil) Robert J Hofer (ConocoPhillips) Robert P Johannessen (Total) Kristian Kolbjørnsen (Lundin Norway AS) Arnd Wilhelms (Norsk Hydro)

Contents: 1.Executive Summary 1.1Background: 1.2Status and gaps: 1.3Conclusions: 2.Introduction 2.1Background 3.Inventory mapping 3.1Present Status 3.2Ongoing initiatives 4.Gap analysis 4.1Geophysics 4.2Sedimentology and Stratigraphy 4.3Structural Geology 4.4Basin analysis: Source rocks, generation and migration 4.5Rock Physics 4.6Geomechanics 4.7Reservoir Simulation and Modelling 5.Recommended activities and focus areas 6.Recommendation for projects Appendix 1 - Technology Gaps – Tables

Background In 20 years more than 50% of the production will come from resources yet to be found (Exploration) Large resources will presently remain in the existing fields after projected shutdowns. There is a need for a combination of new and enhanced IOR technology together with enhanced Reservoir Characterization Methodology. This report will only focus on knowledge and technology.

Status The NCS is one of the leading technology areas in the world especially within the seismic industry. Policies related to data sharing, availability and storage are exceptional. However still unresolved issues… Advanced workstations and software tools have made computerized reservoir models a standardized part of all petroleum exploration and production.

Gaps Uncertainty handling. Integration of interdisciplinary data. Basin analysis and depositional modelling. Fault-seal prediction.. Modelling techniques that honour all available data.. Lithology and fluid prediction from geophysical data. Seismic Imaging Data preparation and maintenance of high-quality databases Open standards for data communication between software tools. Education and research in critical areas

Gaps Calibration of seismic data with lithology and fluid information. Seismic Imaging (e.g. multiples, complex geometries). Lack of underground data in parts of the NCS (Vøring and Møre basins). The scarcity of wells in these areas leads to uncertainties in the geological understanding.

Conclusions – Focus Areas Advances in seismic acquisition, processing and workflows need continuous attention in order to provide better images in complex areas Improved Lithology and Fluid Prediction using full elastic wave field (4C, EM) 4D and Life of Field Seismic integration with Rock Physics Depth migrated seismic as the new standard for interpretation (special attention on the velocity model construction) Field wide 4D-VSP’s surveys / 4D tomography (down hole receivers in several wells)

Conclusions - Integration A fully integrated Reservoir Model all the way from Seismic, through Geo Model to Flow Model is needed. Improved modelling and simulation of reservoir heterogeneities with focus on the behaviour of fault and fractures on reservoir performance. Development of an integrated tool to handle fault seal analysis, fracture analysis, drilling engineering, logging, and seismic data. Integrated Geomechanics software and work flows are needed as part of an integrated reservoir modeling work flow. Calibration of stratigraphy, reservoir, source rock and thermal history in under-explored basins.

Conclusions - Recommendations It is recommended to perform a feasibility study and evaluation of the possible benefits of a stratigraphic well through the basalt area in the Vøring and /or Møre Basin to gather data, promote research and stimulate exploration activity. The establishment of a database of ongoing projects at universities and research institutes is needed to increase knowledge sharing and reduce redundancy There should be a strong focus on knowledge creation, competence building and collaboration between companies, contractors and academia. Norwegian knowledge and technology has already had a great international influence and most of the proposals in this document will have worldwide applications. In order to continue to achieve this it is required to take into account worldwide knowledge, data and technology developments.

Introduction Background

Project Proposal A well through the basalt

NPD Play Models

A stratigraphic well through basalt Recommendation: –Feasibility study –Evaluation of possible benefits Purpose: –Gather data, –Promote research –Stimulate exploration activity. Benefits: –Natural laboratory for academia and industry in cooperation. –A wealth of information pertaining to rock physics, sedimentology, heat flow etc

A well through the basalts – invitation. In order to evaluate the potential and possibilities for such a well we would like to invite you to participate in a working group. NPD will actively participate and is also prepared to act as the project leader during an initial stage. NPD will be able to contribute with seismic and OBS-data together with geo-expertise personnel..

Mandate – Schedule –The working group should have the mandate to define: Possible location(s) for a stratigraphic well Need for additional data collection before deciding drilling location Need for additional resources (cost, service companies involvement etc) Project plan for operational phase (organizational model, operator, timing, budget, ownership of data etc) Possible future research projects based on the new data. –Schedule Feasibility study and planning for area location – define necessary data acquisition (August – Dec 2005). First decision gate to proceed. Data acquisition and analysis for evaluation of specific target area (2006 ). Drilling and data acquisition Research Projects 2008 –

Response Postive : ExxonMobil, ChevronTexaco, Total, Statoil... Negative: BP