Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
WGA West-wide Renewable Energy Zone (WREZ) Project.
The Big Picture Discussion with the Wyoming Infrastructure Authority and Joint Minerals Committee Steve Ellenbecker Wyoming Infrastructure Authority.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
JOINT LEGISLATIVE AUDIT COMMITTEE HEARING SENATE BUDGET and FISCAL REVIEW COMMITTEE Delivering Energy Savings for California AMERICAN RECOVERY & Karen.
 Jeremy Turner, Executive Director Phoenix, Arizona May 21, 2010.
Kansas Renewable Energy and Energy Efficiency Conference Wind 2007 RFP Update John Grimwade - Sr. Director Strategic Planning and Development September.
Queue Reform at the Midwest ISO NARUC February, 2008.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
Western States Energy & Environment Symposium October 27, 2009.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Transmission Incentives P. Kumar Agarwal Acting Director, Division of Reliability & Engineering Services Federal Energy Regulatory Commission U.S. DOE,
The Policy Voice for Energy Storage Bulk Energy Storage for the Nation’s Electricity Grid Jason Makansi, Executive Director President, Pearl Street Inc.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Agenda August 5, Introduction – Natalie Robottom 2.Background and History – Rob Delaune 3.Present Conceptual Engineering Design Proposed Tasks -
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Western Wind and Solar Integration Study Debbie Lew National Renewable Energy Laboratory SWAT/CCPG Meeting Aug 22, 2007.
Selecting Renewable Projects at Colorado Springs Utilities APPA Conference John Romero GM Acquisition, Engineering and Planning October, 2009.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
California Energy Commission Strategic Transmission Planning and Corridors IEPR Commissioner Workshop on Landscape-Scale Environmental Evaluations for.
Stationary Sources Joint Forum Update Eric Massey Arizona Department of Environmental Quality Lee Alter and Patrick Cummins Western Governors’ Association.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
Riverside County Transportation & Land Management Agency Juan C. Perez Director Riverside County Renewable Energy Grant Update August 3, 2015.
METROPOLITAN TRANSPORTATION COMMISSION Key Steps to Delivering Project 1.Lead agency submits final project scope, budget and schedule to MTC 2.MTC.
Western Renewable Energy Zone Project October 29, 2009 John Savage Oregon Public Utility Commission.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
California Public Utilities Commission CPUC Climate Change Activities Paul Clanon Executive Director August 28, 2007 Presentation to the Senate Energy,
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Imperial Irrigation District 2016 Integrated Resource Plan: Imperial Irrigation District April 18th, 2016.
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 18,
Status Report on 2007–2016 Long-Term Reliability Assessment Mark Lauby August 16, 2007.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Scott Raines, Director of School Planning and Construction “Investing in West Virginia’s Future”
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Protocol Revision Subcommittee Tom Burke November 29, 2012.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
Nebraska Wind Conference Wednesday, November 16, 2011
An Inland Port in Salt Lake County
City-wide LED Street Light Conversion Program
Use of EDWG Data by the LTPT
Open Letter - Summary of Responses
Presentation transcript:

icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure Authority Board of Directors November 10, 2009

icfi.com 2 Contents Background Current Status Going Forward

icfi.com 3 Background

icfi.com 4 Renewable Energy Development State Renewables Portfolio Standard (RPS) –California 33% by 2020 –Potential National RPS Production and Investment Tax Credits GHG Emission Reduction Legislation

icfi.com 5 Wyoming Proposed Transmission Lines 7 extra-high voltage Issues: impact, reliability, cost, and spacing of lines Spacing affects BLM ROW application processing

icfi.com 6 Transmission Line Separation WIA Board of Directors funds independent study to address issues Published August 2009

icfi.com 7 WGA and DOE - Western Renewable Energy Zones (WREZ) WREZ Phase I Report Published June 2009 Includes Hub Map of Renewable Resource Potential

icfi.com 8 Western Area Power Administration and the ARRA TIP Purpose: “…constructing, financing, facilitating or studying construction of new or upgraded transmission facilities to deliver or facilitate delivery of renewable resources… Applications submitted April 2009

icfi.com 9 Wyoming Wind Collector and Transmission Task Force Develop a coordinated, staged, conceptual plan for a collector system Accommodate the interstate transmission lines and corridors required to collect and export these new resources

icfi.com 10 Current Status

icfi.com 11 Current Status WIA contracted with ICF to develop a conceptual design of a collector system One meeting and several conference calls held to date Scope of Work is complete and ICF began work in October

icfi.com 12 Scope of Work Tasks 1. Technical Analysis* 1.1: Develop Analysis Scenarios* 1.2: Perform Reliability Analyses* 1.3: Update Energy Corridor Map 1.4: Estimate Costs* 1.5: Summarize the Collector System Design Alternatives* 2. Commercial Structure 3. Administrative/Outreach * Funded subtasks Start October 2009 Task 1 Technical Analysis Task 2 Commercial Analysis Task 3 Administrative Support Collector System Design Alternatives

icfi.com 13 Current Effort – Subtasks 1.1 and Develop Analysis Scenarios ( in progress ) Examining two wind resource development options Analyzing two collector system design options: radial vs. networked 1.2 Perform Reliability Analysis (start 11/09) Performing engineering feasibility analysis to ensure basic security and reliability of conceptual design for a 15GW system Developing a starting point for evaluating collector system design options from a cost basis

icfi.com 14 Going Forward

icfi.com 15 Going Forward 1.4 Estimate Cost of Collector Design Options Estimate cost of design options Rank options based on cost 1.5 Summary of Technical Analysis Identify collector system elements common to all scenarios Discuss possible integration with existing grid Discuss possible staged development of the collector system Describe radial and networked design options and discuss trade-offs

icfi.com 16 Going Forward (Cont’d.) Considerations Outside Scope of Work Integration of wind generation with other energy sources