Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.

Slides:



Advertisements
Similar presentations
Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
Advertisements

A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
1 PHARE and Reality by Wolfgang Philipp Senior Director EATMP EUROCONTROL.
1 BNSC 3 Programme Aviation use of Broadband Satcom Paul Ravenhill Helios Technology.
CARE ASAS Validation Framework. Partners CARE ASAS Board - Francis Casaux EURCONTROL - Mick van Gool, Ulrich Borkenhagen Consortium Partners Aena, Isdefe,
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
3rd meeting COTS team April 25, 2007, Helsinki
Mission Trajectory Step 1 From planning to deployment.
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
Sense & Avoid for UAV Systems
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
“”Capacity and services to road users” Task descriptions Paul van der Kroon, Paris November 2005.
SESAR Single European Sky Air traffic management Research
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
Business Analysis and Essential Competencies
David Bowen Head of ATM Operations and Systems
24-25 June 2010 SWIM-SUIT Final User Forum, Rome SWIM-SUIT Final User Forum.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
CLARIN work packages. Conference Place yyyy-mm-dd
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
Shaping Boeing Surveillance Strategy Drivers & Obstacles ASAS Thematic Network II.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
Process Description and Quality Guidelines – Two Birds with One Stone European Conference on Quality in Official Statistics Q2014 Rudi Seljak, Tina Steenvoorden.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
SESAR State of the Art – Civil RPAS Insertion in the European Aviation System 3 rd Workshop on European Unmanned Maritime Systems FÓRUM DO MAR Porto, May.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
© EUROCONTROL European Air Traffic Management Programme The European ATM Master Plan ASAS TN Dave Young, Business Dev. Manager, EEC.
Requirements Analysis
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
COG/TNG contribution to LPR Implementation Language Proficiency: a safety issue St. Petersburg May 24th 2011.
Dr. Stelios Panagiotou, Dr. Stelios C.A. Thomopoulos Integrated Systems Laboratory Institute of Informatics and Telecommunications National Center for.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision TECHNICAL & OPERATIONAL COMPETENCE ATS.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Collaborative Decision Making (CDM) Saulo Da Silva
Presented by United Arab Emirates
Safeguarding flight data and locating/recovering on-board recorders
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
4 - 8 November 2013 AIM relevant - Assembly conclusions
Ground System implication for ASAS implementation
ASSTAR Project Overview & User Forum Objectives
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Language Proficiency: a safety issue
Presentation transcript:

Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B

Projects EMERALD and EMERTA EMERALD WP5 Work Task WP5.1: Identification of potential ASAS applications Task WP5.2: Detailed feasibility assessment of selected ASAS applications Task WP5.3: Users’ Interview Task WP5.4: Assessment report and RTD plan Task WP5.5: Users’ feedback and final results presentation

Projects EMERALD and EMERTA EMERALD RTD Plan User Requirement or concept phase Feasibility phase Functional Requirement phase Prototyping Phase Experimentation & Validation phase Implementation phase

Projects EMERALD and EMERTA WP5 recommendations The proposed RTD plan be used as a guide for further research into the ASAS domains by the RTD funding authorities The RTD activities described in the RTD plan be undertaken quickly in order to cope with the EATMS schedule for ‘Co-operative ATM’ Co-ordination between all organisations involved in ASAS studies be undertaken

Projects EMERALD and EMERTA Project EMERTA

Projects EMERALD and EMERTA Objectives of Project EMERTA (1/3) To establish the feasibility of using emerging NGSS services ‘as they are’ to meet Air Traffic Service (ATS) and Airline Operation Center (AOC) requirements. This will include the definition of a European-level NGSS demonstration/validation project. To support a European input to international standardisation activities in such forums as ICAO and RTCA/EUROCAE, insofar as they are concerned with the technologies and concepts covered by Project EMERTA.

Projects EMERALD and EMERTA Objectives of Project EMERTA (2/3) To provide inputs to the specification of detailed requirements for a second generation of Low/Medium Earth Orbit (LEO/MEO) satellite systems and services, for deployment beyond the year To assess the practical feasibility of the early introduction, in the European ATM environment, of one or more selected ADS- B/ASAS application scenarios, paying particular attention to safety and transition aspects. This will be supported by an outline indication of the cost/benefit issues associated with the scenario(s).

Projects EMERALD and EMERTA Objectives of Project EMERTA (3/3) To develop initial indications and guidelines on how to deploy ADS-B in Europe, in the context of the ASAS concept, in terms of the potential requirement for reserved airspace and how best to deal with a mixed aircraft population (where some aircraft have an ASAS capability, but others do not).

Projects EMERALD and EMERTA TIS-B conclusions TIS(-B) has a role to play in enabling the initial implementation of ASAS applications An ongoing role to support ASAS operations could also be identified. The concept of a service volume is key. An agreed TIS(-B) concept must be defined as the international standardisation activity continues and further requirements become available.

Projects EMERALD and EMERTA For EMERTA, two applications were chosen: Enhanced Visual Acquisition (EVA) of other traffic for see-and-avoid Station Keeping on Approach (SKA ) Two applications were also taken from EMERALD: Closely Spaced Parallel Approaches (CSPA) Longitudinal Station Keeping (LSK) ASAS Applications

Projects EMERALD and EMERTA EMERTA Conclusions (1/2) Technology is available to support basic ASAS applications Major gap is in the surveillance data quality SKA has been shown to be feasible in the short- term TIS-B could be an enabler for early applications and provide a consistent traffic situation picture

Projects EMERALD and EMERTA EMERTA Conclusions (2/2) Initial applications must be chosen carefully Relevant procedures must be developed Responsibilities must be defined Issues of confidentiality Technical data-link issues must be closed Implement supporting ground systems Address CDTI HMI issues