M.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep 2008 1 M. Apollonio IC - London beam line optics.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
ISIS Related Issues for MICE Adam Dobbs Proton Accelerator Development Meeting, RAL 24 th March /03/20111A. Dobbs.
MICE Beam Loss vs Particle Rate Adam Dobbs, ISIS Meeting, 18 th December 2009.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Particle Rate and ISIS Beam Loss Adam Dobbs, Target – ISIS Meeting, 17 th September 2010.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
Paul drumm, mutac jan MICE Beamline Optics Design Kevin Tilley, RAL, 12th June MICE Needs Generic Solution Pion Injection & Decay Section (a) Inputs.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
124/3/2010CM26 - Riverside1 m. apollonio ( ,P) matrix.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
M.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ M. Apollonio – MICE Operations Manager University of Oxford MICE beam line commissioning.
K.Walaron Fermilab, Batavia, Chicago 12/6/ Simulation and performance of beamline K.Walaron T.J. Roberts.
Beam line characterization with the TOFs1 Demonstrating the emittance-momentum matrix Mark Rayner, CM26 California, 24 March Initial.
Beamline-to-MICE Matching Ulisse Bravar University of Oxford 2 August 2004 MICE performance with ideal Gaussian beam JUNE04 beam from ISIS beamline (Kevin.
M. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Magnets Dry Run ISIS Scheduling Meeting Latest news on Target Ready to run ? Summary of: Magnets.
M.apollonioImperial College - London1 M. Apollonio University of Oxford the MICE diffuser: issues and operation MICE beamline review Nov. 16 th 2007 Imperial.
1June 1 st 2009MICE CM24 - RAL1 MICE Beamline m. apollonio.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
CMPB Alain Blondel 14 April STATUS OF MICE.
The MICE beam line status a)Muon BL: P=208 MeV/c, emi_N= 7 mm rad “... the mother of all the beamlines “ b)Proton BL: derived from (a) by rescaling magnet.
1 MICE Beamline Design: General principles & expected capabilities Kevin Tilley, 16 th November Charge to beamline & desirable beam General principles.
The MICE beam line status a)Muon BL: P=208 MeV/c, emi_N= 7 mm rad “... the mother of all the beamlines “ b)Proton BL: derived from (a) by rescaling magnet.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
Motors, bearings & Sensors By Peter Lau. Disc 2 Disc 1 Dummy Disc Disc 5 Disc 3 Disc 5 Motor A Motor B Motor C.
(+) session, PAC09 Vancouver – TH6PFP056 Introduction The Muon Ionisation Cooling Experiment (MICE, fig. 1c) at RAL[1]
M.apollonioCM17 -CERN- (22/2-25/2/2007)1 M. Apollonio – University of Oxford sizes for PID & shields.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
MICE Beamline Commissioning Linda R. Coney NFMCC Meeting 16 January 2010.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
(+) session, EPAC08 Genoa – WEPP108 eq. 1 A slab of material placed across the beam will not only inflate its emittance.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE CM /10/ RAL1 M. Apollonio IC - London beam line optics.
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
1 Beamline 1. Beamline Target/Misalignment problem 2. Magnet measurements 3. Everything that’ critical and outstanding – eg d/str beamline monitors final.
Beam line commissioning Preparations for Phase1 Kevin Tilley For Paul Drumm & the beam line group.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
MICE Run Plan Sept/Oct 2009 m. apollonio – IC MACHINE PHYSICS USERs RUN NO SHIFT A B C D E.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
M.apollonioMICE UK- RAL- 2/5/20071 MICE beam diffuser M. Apollonio,P. Lau, W. Lau, J. Tacon, S. Yang – Univ. Oxford.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
14/01/2008MICE CM23 - Beam Line Parallel Session1 Simulations: tools and status Marco Apollonio, Imperial College - London.
1June 2 nd 2009MICE CM24 - RAL1 m. apollonio Beamline+( ,P) matrix.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
1June 1 st 2009MICE CM24 - RAL1 Beamline Optics m. apollonio.
1 1 Optics related work: the major threads: -Current (ε,p) status - G4BL/TTL Simulation comparisons - Beam steering/correction -Collimation d/stream &
M.apollonioNuFact??1 ABSTRACT In the Muon Ionization Cooling Experiment (MICE) at RAL, muons are pro­duced and transported in a dedicated beam line connecting.
Marco apollonioAnalysis Meeting (9/12/2006)1 transmission vs amplitude with a finite size diffuser M. Apollonio – University of Oxford.
Beam-Line Analysis m. apollonio 7/7/2010 CM27 - RAL 1.
MICE Beamline Status m. apollonio 17 December 2009 MICE VC
Luminosity Monitor Status
Completing the Step IV Programme
A BeamLine update m. apollonio 7/7/2010 CM27 - RAL 1.
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
Presentation transcript:

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep M. Apollonio IC - London beam line optics

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep beam line status: ∙ estimated proton flux from measurements ∙ rates from GVA1/GVA2 analysis (reminder) ∙ optics availability ∙ sw availability future plans ∙ causes of reduced rate and actions ∙ AoB conclusions layout

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep reminder on desired features P  = [140 MeV/c, 240 MeV/c],  p = +/- 10% easily tunable matched emittance: 1 mm rad <  N < 10 mm rad deliverable to MICE high purity muon beam high rate “600 muons” per target actuation [1 Hz, 1 ms window] acceptable losses for ISIS Beam Features Beamline Target Optics Diffuser Beamline Status Conclusions

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep Beam Features Beamline Production Optics Diffuser Beamline Status Conclusions  production/capture  decay  transport match to MICE MICE:  –  decay beam line beam line constituted by 4 parts

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep ms 20 ms target working principle 1 ms titanium blade dipping at 1 Hz in the ISIS proton beam intercept just ~1ms of ISIS accelerated beam withdrawal must be quick to avoid scraping next filling  extreme accelerations (80g) beam loss must comply with ISIS requirements [P. Hodgson, CM22 19/10/08] Beam Features Beamline Production Optics Diffuser Beamline Status Conclusions

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep some key questions: how many protons per spill are we generating? and then pions/muons? rate in april/may with a D1-D2 line for protons how much beam can we “shave” before “disturbing” ISIS operations [K.Long, CM22 19/10/08]? initial simulation of ISIS beam with ORBIT and comparison with signals from BLMs [A. Dobbs, CM22 19/10/08] how well we understand the line? alignment magnets Beam Features Beamline Production Optics Diffuser Beamline Status Conclusions

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep IC2: >29/3 BM1: >29/3 GVA1: > 4/4GVA2: > 29/3 BM2:>29/3 MICE beamline: magnet configuration and detector locations (march/april) D1 D2 I D1 =400 A  P D1 =480 MeV/c I D2 =170 A  P D2 =450 MeV/c  p~30 MeV/c Beam Features Beamline Production Optics Diffuser Beamline Status Conclusions

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep proton target 50/128 Hz 2ms acq. gate GVA1/2 active for 100 s R8BLM1 signal ~ 50 mV GVA1=14 p/dip(1ms), GVA2= 4p/dip(ms) it corresponds to 2.6E9 (+/-1.3E9) PoT (G4Beamline) x500 less Beam Features Beamline Production Optics Diffuser Beamline Status Conclusions

Scaled beam loss: HEP Test Beam target: 200 mV beam loss at 50 Hz Corresponds to ‘loss’ of: 2.4 × 10 9 protons per dip 1.2 × protons per sec MICE target Beam loss: Corresponding to ‘loss’ of 1.2 × protons per sec … i.e. per dip (at 1 Hz) is 2 V i.e mV 600 good μ/spill from 1.7 × protons Beam Features Beamline Production Optics Diffuser Beamline Status Conclusions

Conclusions: Goal: Increase particle rate in MICE Muon Beam HEP Test Beam target: Indicates that to achieve desired rate may require upgrade to collimation system Radiation surveys: To date: No evidence for dose in DSA or MICE Hall No evidence for activation of ISIS Tools for the understanding of beam loss and particle rate In place … … but, improvements still required (e.g. r/o BPM) Beam Features Beamline Production Optics Diffuser Beamline Status Conclusions

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep ISIS Beam Beam Features Beamline Production Optics Diffuser Beamline Status Conclusions

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep Beam Features Beamline Production Optics Diffuser Beamline Status Conclusions

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep Beam Features Beamline Production Optics Diffuser Beamline Status Conclusions

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep june 2 nd june 3 rd count rates: G4beamline predictions vs measurements MC / meas: discrepancy x2 Comparing G4Beamline to DATA (june): see how well we understand the Q-poles Beam Features Beamline Production Optics Diffuser Beamline Status Conclusions

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep Comparing G4Beamline to DATA (june) MC DATA r = r = (x6.60) 833(x11.57) r = (x3.65) 2603 (x4.66) r = 3.13  6.3%  -29% 2016 (x6.60) 1297 (x18. / x1.56) r = (x4.01) 5077 (x9.07/ x1.95) r = 0.57  11% greatest effect, amplified by a long drift CASE1 CASE2 CASE3 Beam Features Beamline Production Optics Diffuser Beamline Status Conclusions

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep What do we know of Q1-3 ? magnet measurements g (meas.) = / (u.s.) / (d.s.) 50 A g (specs) = A Leff(specs) = mm [no measurement available] magnet positioning geometrical survey  slight misalignment Q1-3 axis to tgt point G4Beamline implementation follows values as given in NOTE 066 (T. Roberts) uses a ??? model for B1-2 I assume it uses a “standard” model for quadrupoles with k 2 =g /B  Beam Features Beamline Production Optics Diffuser Beamline Status Conclusions

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep TEST: vary Q1-3 Leff to check possible systematics Leff (mm) GVA1 (MC) GVA2 (MC) R1 [data] (GV1/306) R2 (GV2/72) -10% % [4.0] 15.2 [9.1] +5% Question: can we be so wrong in determining Leff ?

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep Other reasons? a) efficiency of GVA1/GVA2? No we consider relative increase in count rate b) alignment? Less certain... HOWEVER: bear in mind, a factor 2 while we miss ~ x500 so Pion production (i.e. Target dipping) is AN ISSUE for the Beam Line. This changes the way we have been considering it so far

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep Hi Marco Sorry for the late response but I have just returned from a week on leave. Peter has already filled you in on the mechanical "run on" tests we completed a week or so ago so I won't write anymore on that. The relay driver board design was finished just before we started the tests, but as there are still a few issues with the diffuser that may need some redesign I have put the manufacture of the board on hold until I know whether I need to make any additions to the design. The tests indicated that the control logic will need to be changed (if we don't add anymore solenoid valves to the air crate) so I will be working on this over the next few weeks, while the electronics crate will also need some minor changes. Both these tasks will be carried out between other CEG work commitments. I'm sorry I can't put a definite date on completion of this work at the moment. I have received several s from RAL requesting answers to questions regarding the installation (electronics issues) so I will try to answer these as soon as possible. Cheers, Mike. Hi Marco, The device has currently tested with running the air motors. We found several problems with the design, some of them you may have known. The linear driving of the carrier disc forwards and backwards along the cylindrical drum:- We are now trying to use an encoder to govern the travelling of the carrier to prevent it hitting the bottom (it will jam there if it goes too far). The 2 micro-switch will still be used for emergency only The driving of the bayonet pin:- The length between holding point of motor shaft and the point of reaction force was too long and the holding area was too small that cause the motor shaft bouncing offs the gear due to large deflection on the shaft. The motor/gear box holder has been re-designing to increase the stiffness. The driving of the carousel:- The gear box used hasn’t got enough output power to drive the carousel when the heaviest lead disc was put on 1 holder leaving other holders empty. Also the motor shaft was bent due to the same phenomena as above stated in item 2. The worm wheel and gear with 65:1 ratio will be used to replace the old design and also a new motor holder bracket has been re-designing to increase the stiffness. For the response time / residue air in the air tube when the motors stop:- It had also been tested that the 16 meter long air tube would affect the response time when the motors stops. With a short pipe ~ 3 meters, the overrun distance is about 0.02mm when the air stops. With 17 meter, the overrun distance is ~ 0.04 to 0.08 mm when the sir stops. The micro-switch has 0.3 mm travelling distance before it reach its end. Therefore, the 2 micro switches will still be safe to place at the bottom of the cylindrical drum. This is also found that the back pressure was created when the valve shuts before the air exhausts out. Mike Dawson will design the logic sequence to ensure the residue air exhaust from the pipe before the valves shut. The magnetic effect on the air motors:- It is proved that the motors can be kaput when running under magnetic field. We will replace all 3 motors by non-magnetised one and Mike Tacon had contacted the supplier Briggs Air motor last week to specify our requirement. We are working in the positive direction to solve the above problems though there was some setback during tests. It’s not too bad as we discovered the problem earlier and all seems to have solutions. You are welcome to give us advice on any tests that you think we may need to go through. Regards, Peter

Vert Pos is the DISTANCE FROM CL == Y

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion [K. Tilley, MICE Beamline Review, IC 2007]  optics  optics Transport-Turtle optics design

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep diffuser: - interface between beamline and MICE - lead thicknesses (T)  define  N   =1.4 mm rad x x’

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep [MA, MICE Beamline Review, IC 2007] Diffuser Plates Thicknesses in ( ,P) space

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep Oxford University

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep p and e optics for calibration purposes - from  optics - currents rescaled according to local momenta TOF0 e optics used for PID detectors calibrations tuned to ~100 MeV/c at TOF0 [K. Tilley]

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep BM1: >29/3 MICE beamline detector locations GVA1: > 4/4 IC2: >29/3 GVA2: > 29/3 BM2:>29/3 TOF0+1

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep TOF0 + 1 TOF0TOF1 [see M. Rayner’s talk]

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep D1 D2 Q4 Q1 Q2 Q3 DS Q5Q6Q7Q8Q9 still not working [P. Kyberd’s talk] MICE magnet status superconducting solenoid Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion  Q9  Q8  Q7  Q6  Q5  Q4  D2  D1 Q3 Q2 Q1 commissionedRemote control Soak testPolarity check PS current Magnet cooling PS cooling Magnet completeted not completed to be done    

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion summary - all beam line magnets in place - 3 quadrupole-triplets, 2 dipoles, decay solenoid - all non-sc magnets working - first transported protons on March 29 th - most of beam line detectors in place (DAQ exercised) - first analysis: - n. of protons low  how to increase it … - MC vs measured shows a x2 discrepancy - optics for p/  /  and e ready (w and w.o. sc-solenoid) next steps - fix sc-decay solenoid - commission T2a & T2b - TOF1 installation  determine  (beam) - commission diffuser - collimators/correctors …

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep the end

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep upstream beamline (in the synchrotron vault) a) target Station: p on titanium blade   + p high P   high P   small exit angle ~25 o b) 1 st Quadrupole Triplet Q1-Q2-Q3 first focussing: maximise acceptance before the decay solenoid c) 1 st Dipole D1 first momentum selection: 60 o bending B 1 [select  ]  B 2 [select  ] 1  production/capture Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion 60 o

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion 2  decay channel   Maximise number of muons in decay section: highest decay solenoid field 5 T consistent with controllable  beam 25 o

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep  transport 4 highest  momenta  allow selection of 'backward' going  for higher purity & higher fluxes. Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion 99 % 30 o

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep match to MICE Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion Q4-Q9 define the optics prior to the diffuser diffuser used to inflate initial emittance in a controlled fashion variety of final configurations and several momenta  Five thicknesses of Pb  Changeable via remote control

m.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion MICE beamline upstream section D1Q1-Q2-Q3targetvacuum pipe