Software Quality Assurance Lecture # 6 By: Faraz Ahmed.

Slides:



Advertisements
Similar presentations
Process and Product Quality Assurance (PPQA)
Advertisements

Project Scope Management
Requirements Specification and Management
QA and Need for a QA Framework A Walkthrough. What is QA? Quality Assurance is a process driven approach Ensures that the developed product meets the.
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
By Waqar Hussaian International Islamic university Islamabad.
Software Testing and Quality Assurance
1 Test Planning CSSE 376, Software Quality Assurance Rose-Hulman Institute of Technology March 9, 2007.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Execution and Reporting Adrian Marshall.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Design & Documentation Adrian Marshall.
Testing - an Overview September 10, What is it, Why do it? Testing is a set of activities aimed at validating that an attribute or capability.
SOFTWARE PROJECT MANAGEMENT Project Quality Management Dr. Ahmet TÜMAY, PMP.
 QUALITY ASSURANCE:  QA is defined as a procedure or set of procedures intended to ensure that a product or service under development (before work is.
CBIIT Quality Assurance Process Preston Wood NCI CBIIT Government Quality Representative (GQR) January 2014 RS.
Laboratory Information Management Systems (LIMS) Lindy A. Brigham Div of Plant Pathology and Microbiology Department of Plant Sciences PLS 595D Regulatory.
Security Assessments FITSP-M Module 5. Security control assessments are not about checklists, simple pass-fail results, or generating paperwork to pass.
Slide 1 Test Assurance – Ensuring Stakeholders get What They Want Paul Gerrard Gerrard Consulting PO Box 347 Maidenhead Berkshire SL6 2GU UK e:
CBIIT Quality Assurance and Compliance Process August 8, 2012.
S/W Project Management
CC20O7N - Software Engineering 1 CC2007N Software Engineering 1 Requirements Engineering Practices with Techniques.
Extreme Programming Software Development Written by Sanjay Kumar.
Lesson 5.6 EbD Stakeholder Analysis 1 ® ®. Essential Question: ® What tools can I use to better understand the stakeholders in my project?
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
PRODUCTION PROCESS SchedulingInventory Incoming QC BinningPre-assemblyCalibration Final Assembly Final QA Packaging & Shipping.
Security Assessments FITSP-A Module 5
Objectives Understand the basic concepts and definitions relating to testing, like error, fault, failure, test case, test suite, test harness. Explore.
Software Testing Life Cycle
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Software Inspections. Defect Removal Efficiency The number of defects found prior to releasing a product divided by The number of defects found prior.
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Software Quality Assurance Lecture #2 By: Faraz Ahmed.
CEN rd Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Phases of Software.
US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit.
Quality Activity Matrix Presented by Sandra Toalston President, SanSeek 1.
The IT Quality Assurance FDA Validation Specialists Phone: 877-MGD-TEST ( ) n n n n Web Site:
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
Develop Project Charter
QA and Testing. QA Activity Processes monitoring Standards compliance monitoring Software testing Infrastructure testing Documentation testing Usability.
October 2004J. B. Wordsworth J4ISDPAD1 Information Systems Development Processes and documents.
Test Manager’s Role Best Practice By Gabriel Rodriguez.
Principles of Computer Security: CompTIA Security + ® and Beyond, Third Edition © 2012 Principles of Computer Security: CompTIA Security+ ® and Beyond,
Project Scope Management 1. 2 Learning Objectives Understand the elements that make good project scope management important. Explain the scope planning.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
1 Software Testing and Quality Assurance Lecture 17 - Test Analysis & Design Models (Chapter 4, A Practical Guide to Testing Object-Oriented Software)
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
Cyberinfrastructure Release 2 Production Readiness Review 12 December 2013.
Software Test Plan Why do you need a test plan? –Provides a road map –Provides a feasibility check of: Resources/Cost Schedule Goal What is a test plan?
Software Reviews Ashima Wadhwa.
PREPARED BY G.VIJAYA KUMAR ASST.PROFESSOR
Software Verification and Validation
Testing Process Roman Yagodka ISS Test Leader.
Chapter 5: Project Scope Management
PROJECT SCOPE MANAGEMENT
Pega 9/14/2018 8:48 AM Definition of Done = ready for PO acceptance
SQA Role during Software Requirements Phase
Engineering Processes
Software Quality Assurance
SQA Role during Software Code and Unit Test Phase
Unit 1 :Basic Of Software Testing
PROJECT SCOPE MANAGEMENT
QA Reviews Lecture # 6.
Engineering Processes
The Software Testing Life Cycle
Strategy.
PSS verification and validation
Configuration Management
Test Cases, Test Suites and Test Case management systems
Software Reviews.
Presentation transcript:

Software Quality Assurance Lecture # 6 By: Faraz Ahmed

Contents 0 Test Readiness Review 0 Class Activity– Requirements Gathering

Test Readiness Review 0 Ensures that correct information is being passed off to the next group(testing group). 0 Exit Criteria and Entry Criteria 0 QA ensures that this process is correctly performed 0 QA also ensures that this process is up to date.

Entry 0 Required Hardware 0 Software 0 Artifacts 0 Personnel 0 Test environment (plus data)

Exit 0 Required output 0 Documentation Complete 0 Bugs resolved

Sample Review Document

Software Traceability Matrix

More Documents! 0 System Concept Review: to ensure that the operational requirements have been clearly understood. 0 Preliminary Design Review 0 Critical Design Review

Scope To inspect the test products and test results from the completed test phase for completeness and accuracy, and to verify that the test cases, test scenarios, test scripts, environment, and test data have been prepared for this next test phase