1 Cathcart Road Planning Drawings CR/1/P/15 Philip Challinor 3 Cathcart Road 1 2 3 4 5m Position of photos Photo showug.

Slides:



Advertisements
Similar presentations
As one of the first steps in the retrofitting process, workers removed the existing concrete floor.
Advertisements

Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat.
Bistritsa Terrace PREPARED BY LISA FREIJ. Location Bistritsa Terrace Minutes drive to: 1.Ring road, 5’ 2.Business Park, 8’ 3.American College, 8’ 4.AAS,
Illinois Department of Nuclear Safety1 Radon Mitigation Overview So, you tell the homeowner that they have elevated radon. Now what do you tell them?
Architectural Drawing
Applications of Integration
Images and text from HKT Architects – Project Architects.
Civil Engineering & Architecture 2.3 Residential Design.
LNG in-ground tank March 6 th, 2006 Kajima Corporation.
GROUNDWATER CONTROL.
Foundation Systems.
Foundation Systems.
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
Chapter 8 Plot Plans.
CONSTRUCTION.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
Presentation Template
Floor Systems and Foundation Support
Building Walls Have one main purpose, to support roofs and ceilings such walls most often have three or more separate components. In today construction,
Chapter 18 Foundations.
Sanitary Engineering Lecture 16
Chapter 2b Foundations Shallow & Deep Foundations.
Radon Overview How Radon Enters the Home. Learning Outcomes Upon completion of this module you will be able to:  Recall the predominant source of radon.
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
Introduction to a pit installation
Balloon Frame North-American invention, 1833
Topic B2 Sub-structure groundworks
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Reading Structural Drawings
Copyright © Texas Education Agency, All rights reserved. Architectural Design The Foundation Plan.
NGfL CYMRU GCaD PLUMBING APPLIANCES & COMPONENTS.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
7 Mini Mall Design. Connection Quick View Architectural view.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
UNT in partnership with TEA. Copyright © . All rights reserved.
NUMBER OF FLOORS: means the number of floors that are counted from the vertical section of a building at a point where the building has the most floors.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
Week 6 Timber based columns
BUILDING CONSTRUCTION
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Pecha Kucha Group 1. Design Concept Features? Features?External Cycle store to the right of the face of the buildings. Encased in timber cladding as will.
Symbols and Room Finishes
By Prof.Kuldeep Nayi Sub : Building Construction ( )
Floor Systems and Foundation Support
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
CAD-Architecture Inst: Mr. Johnston Logan High School
Foundation – jay Desai.
Plumbing system fundamental and design course
APPLICATIONS OF TECHNOLOGY
Shyamaghat Rainwater Model Project
* 07/16/96 Site Development Plan * ##.
Introduction Used for covering spaces in the form of roof or floor
Chapter 10 Construction Basics.
Arch205 Materials and building construction 1 foundation
PLUMBING APPLIANCES & COMPONENTS
Arch205 building construction foundation
International Building Materials and components
Building Construction I Sofia Sebastian 1
20 Chestnut Drive, Mansfield
Building Construction I Sofia Sebastian 1
The Beehive House, Castledine Street, Loughborough
Field House, Car Colston
The sport hall.
Pier Foundations Piers Suspended floor Ground beam Next slide.
Collapse Patterns.
Concrete A structural material made by combining cement, sand, aggregate, and water.
An Introduction to Subway Construction Technology
Field House, Car Colston
Presentation transcript:

1 Cathcart Road Planning Drawings CR/1/P/15 Philip Challinor 3 Cathcart Road m Position of photos Photo showug leanng garden wall with no 56 Seymour Walk Close up shows lean is now approx. 100mm Application for Certificate of Lawful UUse Photo showug leanng garden wall with no 56 Seymour Walk Close up shows lean is now approx. 100mm Mortar cracking & falling out Wall leaning by approx. 100mm 58 SeymourNo 5 C Road N

Basement Plan Drg no CR/1/ WD 01 i Plant WM Service Lift Light tubes Light tubes 4.5m 14m Multi purpose room Light tubes Potential space for car dock 1m deepx2mx1m water tank as rainwater harvesting system wmwm 4.5m m Utility 12.5X3m wide x 1.5m deep pool Existing inspection chamber IL approx 800mm below courtyard FGL DATUM -4.5m Pool level deck-tiling FGL DATUM -3.5m Changing 100mm Hepsleve drain gravity fed to existing IC Basement level connections pumped up to floor above Specification General Waterproof concrete structures shown red Insert piling to perimeter of garden Excavate to 5m below courtyard level Underpin foundations of all perimeter walls with 550mm wide pins with top of basement slab at 4.5m below courtyard level Apply waterproof render to all perimeter walls All other walls shown blue to be conc blockwork Allow PC sum of £300,000 for pool system Upper floors 150mm concrete pot & beam flooring with structural topping Finish Lay 900x900mm porcelain tiles to basement floor Limestone flooring to garden level floor Wide plank hardwood flooring on all upper floors Plant Gas fired boiler with pressurised megaflow system Underfloor heating throughout PV panels feed to immersion heaters in separate Pool heating system Service Lift Install service lift with double stacked car Plumbing Svp pumped up to floor above for Gravity feed to Inspection chamber in courtyard 1 Cathcart Road Planning Drawings CR/1/P/1 Philip Challinor Basement Plan Extent of pillng to b completed between 1/12/2014 and 30/12/2014 shown red X X

Extent of wall rebuilding to b completed between 1/12/2014 and 30/12/2014 shown red X X

m N 1 Cathcart Road Planning Drawings CR/1/P/8 Philip Challinor Section A A 2.2m 2.6m 300mm 4m 2.6m 300mm 2.5m 300mm 2.4m 300mm 2.3m 300mm Attic 2 nd Floor 1st Floor Raised Ground Floor Garden Level Basement 4.0m Stone terrace Pavement level +1.5m Exstg Courtyard level DATUM +0m -4.5m Swimming pool 1.8 m Extent of proposed rebuilding of garden wall Line of 450 wideX200mm deep ground beam Piling to extend to 5m below datum

garden to number 56 Seymour Walkd 1m soil above slab To exstg garden level -3.5m -datum (exstg courtyard level 1.8m high Garden wall rebuilt in existing Position on new foundations 450x450mm RC ground beam Linked to continuous piles- RC piles 300mm diameter with Reinforcing cage 100mm concrete wall cast in situ Outline of trial pit to be dug Once piling and ground beams To garden area completed Hole to be refilled at end of excvatio Section x-x Scale 1:100 1 Cathcart Road Planning Drawings CR/1/P/15 Philip Challinor