Loading data into the ETC and into the MPM Baseline.

Slides:



Advertisements
Similar presentations
CREATING A PAYMENT REQUEST FOR A NEW VENDOR
Advertisements

How to validate in Budget Manager Hopefully now you have reached this stage you will have downloaded the inpatient and outpatients excel files for you.
Shift Maintenance.
Electronic Timesheet User Manual
CLINIC MANAGEMENT SYSTEM APPOINTMENT SCHEDULING. How will this start? Any schedules already built will not be carried over to the CMS Portal You will.
FLEET User Manual July 1, Part One – User Names & Passwords I.User Names & Passwords A. Creating an Account B. Forgot Password C. Updating .
Step – by – step Tutorial.  Enter Username  Enter Password  Select OK.
Top Reasons why users call ECCA. Agenda Reason for the call: What is the question or problem? Reason for the call: What is the question or problem? Answer.
Gateway Program Go to along the left side, in the third section, click on The Gateway.
Purchasing Goods and Services. Overview In this session you will learn how to utilize the eProcurement Module to create requisitions for purchasing goods.
Exit Microsoft Outlook Skills Using Categories for Sorting, Filtering and Creating Group Oklahoma Department of Corrections Training Administration.
TFACTS Private Provider Financial/Invoicing Overview 1.
Payment History Wizard June 20, Payment History Wizard  Payment history can be entered in ACT 7 for prior years by using the Addback wizard. 
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Accounts Receivable Presented by: Robert Myers Presented by: Robert Myers.
NextGen Trustee Receipting
USC’s Internet-based Time and Attendance Management System.
IMPROVED SYSTEM NEW LOOK
Adjustments and Year-End Procedures
Inventory Throughout this slide show there will be hyperlinks (highlighted in blue) follow the hyperlinks to navigate to the specified Topic or Figure.
1Allocating Expenses. Create Report Header Page To access this screen, click on ‘New Expense Report’ from your Expense Module Tab This page will come.
Education Google Calendar (GCal) English. Education Upon completion of this course, you will be able to:  Navigate the GCal interface  Search your calendar.
McGraw-Hill/Irwin Introduction to QuickBooks Pro, 2004 © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 4 Bank Reconciliation.
Silent Dismissal Administrator Quick Start Guide.
Month End/Year End Procedures VMS (GUI) Presenter: Linda Kennedy.
NextGen Trustee Department Disbursements This class will cover the various methods of handling department disbursements. Whether entering them manually.
E-Pay 2.0 Upgrade.
Nextgen GL ACCOUNT CREATE, EDIT,& SEARCH. GL Account Creation Adding the account to the COA Creating & adding the account to the GL Nextgen.
Welcome to State of Michigan Time & Expense Processing Employee Expense Modification With Advance Tutorial Brought to you by the Office of Financial Management.
ICP Kit 2011 HHC Data Entry Module The World Bank ICP Kit Training African Development Bank.
Intro to C++. Getting Started with Microsoft Visual Studios Open Microsoft Visual Studios 2010 Click on file Click on New Project Choose Visual C++ on.
Mail merge I: Use mail merge for mass mailings Perform a complete mail merge Now you’ll walk through the process of performing a mail merge by using the.
Kevin Long Project Controls eCAM Notebook Training Manual.
ABI Instructions- Setting up your Gradebooks *skip to slide 10 for setting up a new quarter By Sarah Rosenkrantz
Open the Goodyear Homepage Click on Teacher Tools.
Access Online Cardholder Transaction Approval Training 1 Client Logo.
Walk Through of VEEP Online System Updated June 2015 Registering as a ‘New User’ Logging On and Reporting.
1 TEISS Case Project Introduction Melinda Ronca-Battista and Angelique Luedeker ITEP/TAMS Center.
Page 1 Non-Payroll Cost Transfer Enhancements Last update January 24, 2008 What are the some of the new enhancements of the Non-Payroll Cost Transfer?
Step by Step Instruction: How to Conduct Direct Certification using File Upload: Standard Format Released January 2014 “How to Conduct Direct Certification.
District 1 Officiating Program Assigning Games. Administrative Roles and Functions.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
Darek Sady - Respondus - 3/19/2003 Using Respondus Beginner to Basic By: Darek Sady.
Page 1 Billing Drop Shipments RLM System. Page 2 Drop Ship Billing Drop Ship billing is very similar to Outside Contractor Billing, except that billing.
Training Guide Copy/Print. Log into Inside Augsburg.
Indicator 13 Secondary Transition. Main Menu SPP13 has a navigation toolbar located at the top of each screen. If you use the toolbar to navigate to another.
Davisware GlobalEdge 2008 Payroll Main Menu Time Entry and Payroll Processing.
Walk Through of VEEP Online System Updated May 2011.
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
Bank Reconciliation Chapter 4. PAGE REF #CHAPTER 4: Bank Reconciliation SLIDE # 2 Objectives Reconcile your checking Create bank reconciliation reports.
Invoices Training Presentation for Supply Chain Platform: BAE Systems May 2015.
Compile your monthly P-Card Packet 1,2,3 For in depth screenshots and details on Step 1 click here 1.Open your transactions for the Current Billing Cycle.
NextGen Trustee GL/Accounting This class will cover NextGen Financial Management for Trustee Offices. We will look at GL accounts, Transactions, Bank Reconciliation,
Perform a complete mail merge Lesson 14 By the end of this lesson you will be able to complete the following: Use the Mail Merge Wizard to perform a basic.
Standard Operating Procedure
3A – Advanced Quoting Techniques
TEST PREP SEMINARS 2017 PayPal Buttons Lets Begin!
Setting up Categories, Grading Preferences and Entering Grades
Standard Operating Procedure
Download/Upload Inventory
Course Topics Course Topics ECARS Enhancements
How do I get started? Log in to your Google Account and click on Calendar OR, from your Inbox, click on Calendar in the top left corner Choose your view.
NextGen Purchasing Calendar Year End 1099 Process
NextGen Trustee General Ledger Accounting
Quick reference: entering a requisition In escape RECEIVING AN ITEM
Approving Time in Kronos Manager/Supervisor Reference Guide
Upload/Download Inventory
Upload/Download Inventory
To modify a requisition, enter the requisition number and click OK or press enter. You can enter sign to return to the last requisition you were.
Jewel - INTERMEDIATE.
Presentation transcript:

Loading data into the ETC and into the MPM Baseline

1 Loading the ETC into the MPM Baseline These instructions cover: Loading a potential PCR into the MPM ETC Creating the MPM import file from P3 and C\SIT Importing the data Checking the data Bringing the ETC into the MPM Baseline Importing the data Manual adjustments Checking the date, phase codes, and EVM

2 This lesson deals with loading a potential PCR into the MPM ETC and then into the Baseline. The MPM current baseline project is TRNSLB. ETC before being set to baseline. The ETC may be different than the current baseline. In MPM Project Replan - set the ETC equal to the Baseline.

3 Copy the baseline (TRNSLB) as a new project (TRNSLE). ETC after being set equal to baseline. In Project Maintenance go to Edit – select Copy Project

4 Select the next available blank line. Go to Edit – Paste Project. Name the Project, select the path and hit OK. The new project will now show on your Project Maintenance screen.

5 Create a P3 Global to set the MPID (used in C\SIT to link the P3 activity to the MPM WBS) equal to the activity. After the global is run – you can review the results (as shown)

6 Create a P3 Global to identify the Lab performing the work. This global links the resource to the Lab through the cost account (ACC). C\SIT links the Lab to the Resource Dept in MPM. After the global is run – you can review the results (as shown)

7 Create a P3 Global to set the calendar. When multiple calendars are used, the import into MPM through C\SIT could provide erroneous results.

8 Create a Global to set the Quantity to Complete (QTC) equal to the Budgeted Quantity (BQ). C\SIT uses the QTC when creating the MPM import file. You may also use resource curves or resource lag/duration in P3. C\SIT will send the correct array of data to MPM.

9 C\SIT initial screen – select Next (bottom right corner) Type in 7 *’s for the MPM user ID – then select the MPM project. Select Next.

10 Type in your P3 user name (if applicable), select the P3 project path, then select the appropriate P3 project. Select Next. Select BCWP Estimates and Date Transfer. Select Next.

11 Select All. (Individual activities impacted by the PCR could be selected, however it is usually much quicker to select all). Go to Next. Again – Select All. Go to Next.

12 Select All – go to Next. In this lesson Overtime is not used. If we were using overtime to bring in Phase Codes we would select Resource Custom Data Item. Go to Next.

13 Go to Next.

14 Select Begin. After processing is complete - go to Next.

15 Note that there were no Errors/Warnings/ Exclusions. If a number shows up in any of these categories – select Details. This will show the problem(s). Fix the problem then rerun C\SIT. If there are no problems – save the file.

16 Go to Integrated Planning. Select the Project and ETC. Before importing the C|SIT file into MPM, we should delete the existing estimates in MPM.

17 Make sure there are no historical costs before you delete estimates. (Note: If there are historical costs you will need to enter the new BCWS manually. Also, be sure to delete any activities with history from the C\SIT import file (the one that was just saved). Otherwise you will change history and you may enter data twice. Select the activities that are impacted by the PCR. (Note: If they don’t exist, add them in through the WBS screen. You can add them now or finish checking history and then add them.

18 Delete the estimates on each activity by selecting the resources under the activity and hitting delete. Go to Imports – Estimates.

19 Select the project, the Import File, and ETC. Check to make sure that there are no errors after the import.

20 Go to Reports – Project Comparison. Select the ETC project (top) and the Baseline project (bottom). Condition the window as shown. Make sure that the Gate Month is set to Nov01 which was when the project set S=P=A. The report will then show actuals through Nov 01 and the new ETC from Dec 01 forward.

21 Run the report. In this PCR there is a ~$149k increase to the overall project. This report also shows the activities that changed.

22 After the PCR is approved it can be loaded into the Baseline in a similar manner. From Integrated Planning select the Project and the WBS activities that are impacted by the PCR. Select Baseline.

23 Again – delete the estimates from each activity

24 Go to Imports – Estimates. Select the project import file, and Baseline.

25 Check for errors. Run a Baseline – Project Comparison report. You can run the report at any level.

26 Check to make sure that the BQ came in correctly from P3. In Integrated Planning go to an activity and select a resource. Click on the summation sign and see how many hours are estimated. Then go to the P3 Project file and compare. Hours brought in. Type in the Phase in the Overtime Field. (Note: If you brought in the Phase from P3 this field will already include the Phase.

27 BQ = QTC = 36 hrs

28 Finish loading in the remaining phase codes.

29 To change an estimate (or add an estimate) using Autospread – select the resource to be changed in Integrated Planning. Select Autospread. Type in the amount (make sure that the units match). Select a curve and a date range, replace all or replace part and select OK. In this example 36 hours are being Increased to 136 hours.

30 The new estimate replaces the old estimate and the Estimate Type shows as Autospread Hours. The Estimate Type should be changed to avoid problems with some reports.

31 To change the Estimate Type just retype the estimate value in any given month (you only need to replace 1 month). This will automatically change the Estimate Type to whatever window you are in.

32 Next - we need to check to make sure that new activities that have been added have an earned value method (EVM). Go to Integrated Planning – select the project And select Milestones. Hit the filter at the top of the page and select EVM.

33 Filter for EVM = Empty Activities with no EVM will show. If you select the EVM from this screen it will not be saved – therefore, filter again for All Data.

34 Click on the blank EVM cell. You will get a drop down list. Select the EVM for the activity. You will get this message – hit yes. The activity will now have the assigned EVM.

35 MPM S R U LE