Basic Concepts of Economics Use basic economic concepts to explain changes in natural resource base and environmental quality Prepared by Husam Al-Najar.

Slides:



Advertisements
Similar presentations
Cost Behavior and Cost-Volume-Profit Analysis
Advertisements

Chapter 7 The Cost of Production. Chapter 7Slide 2 Topics to be Discussed Measuring Cost: Which Costs Matter? Cost in the Short Run Cost in the Long Run.
PERILAKU BIAYA : Analisis dan Penggunaan
Cost Behavior: Analysis and Use
Cost Behavior: Analysis and Use Mar 3, 2004 Chapter 5.
Chapter 5. Merchandisers Cost of Goods Sold Manufacturers Direct Material, Direct Labor, and Variable Manufacturing Overhead Merchandisers and Manufacturers.
Module 14 Cost Behavior and Cost Estimation
Prepared by Diane Tanner University of North Florida Chapter 10 1 Cost Estimation.
Cost Behavior, Activity Analysis, and Cost Estimation
Cost Accounting Dr. Baldwin University of Arkansas – Fort Smith Fall 2010.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Basic Concepts in Economics: Theory of Demand and Supply
Cost Estimation Chapter 5 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin
Cost Behavior: Analysis and Use
Chapter 3 Cost behaviour, cost drivers and cost estimation
Managerial Accounting
Cost Behavior Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division of Thomson Learning. All rights.
Economics Winter 14 January 13 th, 2014 Lecture 3 Appendix to Ch. 1, Ch. 2.
1 CHAPTER M4 Cost Behavior © 2007 Pearson Custom Publishing.
CHAPTER TWO The Nature of Costs. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 2-2 Outline of Chapter 2 The Nature of.
Mathematics for Economics and Business Jean Soper chapter two Equations in Economics 1.
3 CHAPTER Cost Behavior 3-1.
Activity Cost Behavior
3-1 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Activity Cost Behaviour 3 PowerPresentation® prepared by David J. McConomy, Queen’s.
Chapter 5 Cost Behavior: Analysis and Use. © The McGraw-Hill Companies, Inc., 2005 McGraw-Hill /Irwin Types of Cost Behavior Patterns Recall the summary.
Cost Behavior Analysis
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Supply and Demand. Law of Demand The rule people will buy more at lower prices than at higher prices if all other factors are constant You must be able,
Copyright © 2003 Pearson Education Canada Inc. Slide Chapter 10 Determining How Costs Behave.
E-con. Intro to E-con Economics is the study of scarcity and choice. At its core, economics is concerned with how people make decisions and how these.
Lecture 6 Dr. Haider Shah.  Understand what are the primary tools for forecasting  Understand regression analysis and when and how to apply it.
Module 14 Cost Behavior, Activity Analysis, and Cost Estimation.
0 CHAPTER 4 Cost Behavior and Relevant Costs © 2009 Cengage Learning.
1 C H A P T E R 1 1 Supply, Demand, and Market Equilibrium C H A P T E R 4 © 2001 Prentice Hall Business PublishingEconomics: Principles and Tools, 2/eO’Sullivan.
Cost Behavior Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division of Thomson Learning. All rights.
3-1 Cost Analysis Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University 3.
© 2007 Pearson Education Canada Slide 3-1 Measurement of Cost Behaviour 3.
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin DSS-ESTIMATING COSTS.
2-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.
Chapter 6: Perfectly Competitive Supply
1 COST BEHAVIOR PATTERNS Chapter 2 Accounting Principles II AC Fall Semester, 1999.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Activity Cost Behavior
Chapter 10: Determining How Costs Behave 1 Horngren 13e.
fall ‘ 97Principles of MicroeconomicsSlide 1 This is a PowerPoint presentation on fundamental math tools that are useful in principles of economics. A.
Basic Concepts of Economics Session Objective: l Use basic economic concepts to explain changes in natural resource base and environmental quality.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
1 Chapter 4 Prof. Dr. Mohamed I. Migdad Professor in Economics 2015.
Copyright © 2013 Nelson Education Ltd.
© 2003 McGraw-Hill Ryerson Limited. Production and Cost Analysis I Chapter 9.
Chapter 4 Cost Terminology and Cost Flows. 1.What is the relationship between cost objects and direct costs? 2. How do you classify product costs into.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
PPT 3 -1 Don R. Hansen Maryanne M. Mowen COST MANAGEMENT.
Cost Behaviors Management Accounting. Cost Classifications Association with cost object Cost object is anything for which management wants to collect.
Use with Management and Cost Accounting 8e by Colin Drury ISBN © 2012 Colin Drury Part Six: The application of quantitative methods to management.
Prepared by Diane Tanner University of North Florida ACG Cost Estimation 4-1.
Analyzing Mixed Costs Appendix 5A.
Cost Estimation & Cost Behaviour
16 The Behavior of Costs.
Mixed Costs Chapter 2: Managerial Accounting and Cost Concepts. In this chapter we explain how managers need to rely on different cost classifications.
Analyzing Mixed Costs Appendix 5A.
Chapter 16 The Behavior of Costs
Cost-Volume-Profit Relationships
Cost Behavior: Analysis and Use
Cost Volume Profit (CVP) Analysis
Cost estimation and behaviour
Determining How Costs Behave
© 2017 by McGraw-Hill Education
Cost Behavior: Analysis and Use
DSS-ESTIMATING COSTS Cost estimation is the process of estimating the relationship between costs and cost driver activities. We estimate costs for three.
Presentation transcript:

Basic Concepts of Economics Use basic economic concepts to explain changes in natural resource base and environmental quality Prepared by Husam Al-Najar

Content What is economics? Basics of microeconomics Three basic theories –Rational behavior –Opportunity costs –Marginal analysis Making choices Supply & demand model Cost estimation methods

Definitions Economics: A social science that studies and influences human behavior Microeconomics studies how individuals use limited resources to meet various needs and consequences of their decisions Macroeconomics studies the determinants of aggregate level of economic activities

Basics of Microeconomics A fundamental contradiction in life: Resources are limited or scarce Human wants are unlimited or insatiable Therefore, choices must be made! Economics is about making choices!

Example: Gaza Water Crisis

Theory 1: Rational Behavior People know what they want; Their behaviors are consistent with what they want; Assume information is given.

Opportunity Cost The cost of anything in terms of other things given up or sacrificed. What would you be doing right now if you did not come to this lecture? “No pain, no gain” “There is no such a thing as free lunch!”

Marginal Analysis Effects of per unit change in activity –effects of converting another 100 ha of forests –effects of consuming another 100 liter of water –effects of catching another 100 tons of fish –effects of reducing another 100 tons of pollutants The effects have two sides: benefits & costs

Diminishing Marginal Benefits As you increase your activity while other things remain constant, the benefits from each additional unit of your activity declines. The benefits of eating the 2nd, 3rd, and 4th pizza?

Increasing Marginal Costs As you increase your activity while other things remain constant, the costs of carrying out each additional unit of your activity increases. Costs of attending to the 2nd, 3rd, and 4th week of the lecture?

Making Choices How to do? choose the least cost combination of capital, land, labor, and technology

Law of Supply The quantity supplied will increase if the price does up, holding other things constant. This relationship reflects increasing marginal cost of supply (MC) Determinants of supply: factors other than price that influence supply: number of producers, cost of production, and technology

Law of Demand Demand will increase if the price goes down, holding other things constant. This relationship reflects diminishing marginal benefit from consumption Determinants of demand: factors other than price that influence demand: income, number of consumers, and preferences

Supply and Demand Model in a perfectly competitive market Price Quantity Supply = MC Demand = MB P’ Q’

Individual Producer in a perfectly competitive market Price Quantity P’Demand = MB Supply = MC Q’

Fixed Cost BehaviorVariable Cost Behavior £ £ Relevant Range Activity Activity Cost Behavior

Total Costs £Cost Number of Units Produced Fixed Costs Variable Costs Linearity Assumption Y = F + VX The Behavior of a Mixed Cost

£Cost Number of Units Produced Linearity Assumption Narrow Width Step-Variable Costs

£Cost Number of Units Produced Linearity Assumption Wider Width Step-Fixed Costs

Cost Estimation Method Used by managers to predict/plan costs at various activity levels Useful when cost information is not broken into fixed and variable components Five common methods –Engineering method –Account analysis – Scattergraph – High-Low – The Method of least squares (Regression)

Goal = create a cost equation TC = FC + VCx TC = total costs FC = fixed costs VC = slope of line (variable costs) x = units produced/sold The Goal of Estimation

1. Engineering Method This method is based on the use of engineering analyses of technological relationships between inputs and outputs – for example, methods study, work sampling and time and motion studies. The approach is appropriate when there fiscal relationship between costs and the cost driver. The procedure when under-taking an engineering study is to make an analysis based on direct observations of the underlying physical quantities required for an activity and then to convert the final results into cost estimates. Engineers, who are familiar with the technical requirements, estimate the quantities of materials and the labour and machine hours required for various operations; prices and rates are then applied to the physical measures to obtain the cost estimates. The Engineering method is useful for estimating costs of repetitive processes where input-output relationships are clearly defined.

2. Account Analysis Used to estimating fixed and variable costs Step 1: Classify costs as variable or fixed –Requires professional judgment Step 2: Determine variable costs per unit  Step 3:Determine fixed costs  Add all fixed costs together Total Variable Costs Activity Level Total Variable Costs Activity Level The function is the total of variable and fixed costs TC = VCx + FC

3. Scatter graph Approach Used to estimate fixed and variable costs to determine how costs and activity levels change Step 1: Acquire cost information over several periods Step 2: Graph the data Step3 : Eyeball a linear relationship

Linear Relationship

Nonlinear Relationship Total production cost 0 Unit produced * * * * *

Upward Shift in Cost Relationship 0 * * * * * * Unit produced Total production cost

Presence of Outliers 0 * * * * * * Unit produced Total production cost

4. High-Low Method  Used to estimating fixed and variable costs at various levels of activity  Uses two data points, the high and low levels of activity and their related total overhead costs Results: Variable cost = Line slope Fixed costs = Y-intercept Results: Variable cost = Line slope Fixed costs = Y-intercept

High-Low Method Step 1: Select the high and low data activity points. Step 2: Subtract the smallest from the largest cost and the smallest from the largest activity and use the changes in the following formula. Change in volume = Variable cost per unit Change in Cost Select high and low ‘activity’ levels first, then corresponding costs.

High-Low Method Step 3: Pick one point: Substitute the total cost of one of the points for “y” in the equation: y = mx + b Step 4: Substitute the variable cost from step 2 into the formula for “m” Slope Step 5: Substitute the number of activity units for the data point chosen for “x”

High-Low Method Continued Step 6: Solve for fixed costs “b” Step 7: Determine the cost formula to use in estimating the mixed costs at various levels in the following format: y= m x + b Only two letter variables will be displayed in the formula–X and Y. The other letters—m and b should be replaced by the respective amounts.

Month Utility Costs Units Produced January £2, February 2, March 4, April 5, May 7,5001,000 Example: High-Low Method

Y= F + VX Variable Cost Rate (V)= (Y 2 - Y 1 )/(X 2 - X 1 ) V= (£7,500-£2,000)/(1, ) V= £5,500/800 V= £6.875 per unit The High-Low Method (continued) Y=F + VX £7,500= F + £6.875 (1,000) F=£7,500 - £6,875 F= £625 The cost formula using the high-low method is: Y = £625 + £6.875 (X)

5. The Least –Squares Method The method determines mathematically the regression line of best fit. It is based on the principle that the sum of the squares of the vertical deviations from the line that is established using the method is less than the sum of the squares of the vertical deviations from any other line that might be drawn. The regression equation for a straight line that meets this requirement can be found from the following two equations by solving for a and b. Ey=Na+bEx………..(1) Exy=aEx +bex2……(2) Where N is the number of observations.

Example: The Least Square Hours x Maintenance Cost y

Solution to the Problem Hours x Maintenance Cost y X2 xy , , , , , , Ex = 1260 Ey = Ex2 = Exy =

Solution (Continued) Using Normal Equation, we have: = 12a b…………Equation (1) = 1260a b…..Equation (2). To solve for b, multiply equation (1) by 105 (1260/12), to give: = 1260a b……Equation (3) Subtracting equation (3) from equation (2), the ‘a’ terms will cancel out to yield = 31500b. Therefore, b = £10. Substituting this value of b into equation (1) and solving for a, we have = 12a x 10 As a result, a = 600. Substituting this values of a and b into regression equation y = a + bx, we find that the regression line (i.e. cost function can be described by Y = £600 + £10x. We can now use this formula to predict the cost incurred at different activity levels, including those for which we have no past observations.

Thank you