Report from CALICE Beam Test 2 nd DAQ taking period and Plan for 3 rd DAQ period S. Uozumi Jul-26 2008 ScECAL meeting.

Slides:



Advertisements
Similar presentations
Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
Advertisements

The performance of Strip-Fiber EM Calorimeter response uniformity, spatial resolution The 7th ACFA Workshop on Physics and Detector at Future Linear Collider.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
MC_ Muon Beam Lines 8/3/06 Want a  beam of ~300MeV/c –This requires a  beam of ~300 MeV/c Possible Sources: SY Proton Beam line components removed.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
Plans for Linear Collider Calorimetry Test Beam Work at Fermilab Andy White for U.S.+European-CALICE and other collaborators.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Offline shifter training tutorial L. Betev February 19, 2009.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
The Meson Test Beam Facility Erik Ramberg LRP Meeting – Oct. 30,2003 Delivering MI beam to MTBF User area layout Operational characteristics Detectors.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
FP420 Meeting - 13 September 2007 Beniamino Di Girolamo - CERN PH Telescope, installation and beam area B. Di Girolamo CERN.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
Preparation for CERN TB - Erika Garutti1 Preparation for CERN test beam H6 test beam area in Prevessin.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
1 CERN 2007 Installation and Run Plan Erika Garutti & Fabrizio Salvatore.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan Japan-Korea Joint Shinshu Univ.
Beam Test Plans at the KEK Fuji Beam line (as of Nov ) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.
The Scintillator-ECAL 2 nd Prototype S. Uozumi (Kobe) Jun
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
Plan for the KEK beam test in November 2007 and Beyond Satoru Uozumi (Shinshu) Oct-1 Japan-Korea KNU.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
DESY BT analysis - updates - S. Uozumi Dec-12 th 2011 ScECAL meeting.
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
Scintillator-ECAL Beam Test Scintillator-strip ECAL Beam DESY My task and achievement at DESY Contents Satoru Uozumi Shinshu University, Japan Nov-23.
or getting rid of the give-away particles in a test-beam environment
DQM4HEP Monitoring Status Tom Coates AIDA-2020 Second Annual Meeting
Online Monitoring : Detector and Performance check
Shift instructions August 16, 2017 Antoni Aduszkiewicz
Preparation for CERN test beam
Hadronic Shower Structure in WHCAL Prototype
CALICE News The 2007 beam tests have started!
Offline shifter training tutorial
Kevin Burkett Harvard University June 12, 2001
ScECAL+AHCAL+TCMT Combined Beam FNAL
Installation and Run Plan
Preparation of the CLAS12 First Experiment Status and Time-Line
A summary of world-wide test beam facilities
Test Beam models in Mokka
Presentation transcript:

Report from CALICE Beam Test 2 nd DAQ taking period and Plan for 3 rd DAQ period S. Uozumi Jul ScECAL meeting

CALICE Beam Test 1 st period : May SiW-ECAL + AHCAL 2 nd period : July SiW-ECAL + AHCAL 3 rd period : Sep ScW-ECAL + AHCAL 4 th period : early in next year ? Important imformation can be found in the CALICE BT web page: You can see on CALICE e-log what is currently ongoing : Contact me for login-name and password.

Silicon-W ECAL / Analog-HCAL Fully functional at the beginning of 2 nd DAQ period. Beam

Beam-line setup 4 layers of chambers (from Japan) Trigger counters with area of 10x10, 100x100 mm. 2 Cerenkov conters are installed in upstream.

Triggers All the triggers are made with combination of 10x10, C1, C2 and 100x100 trigger signal. 10x10 [mm] minimum bias trigger Electron trigger – 10x10 & C1 & C2 Pion trigger – 10 x 10 & !C1 & !C2 100x100 [mm] muon trigger Beam-halo veto counter is also available (1mx1m with 20cm hole)

Beam status The beam is delivered as 4-sec spill per minute. Characteristics of the beam strongly depend on beam energy. – Spot size – Rate – e/pi fraction – Momentum spread – Fraction of multi-particle event

Accelerator conditions To the MT6, beam will be delivered for nominally 12 ~ 15 hours a day. Beam time will be (hopefully) daytime, but it may change depending on accelerator schedule. Moreover sometimes accelerator is quite unstable, which results in loss of our DAQ time. Therefore clear priorization of the DAQ programs and run scheduling with enough safety margin is necessary. Any low priority programs should be scheduled as optional plans.

Updates on ScECAL Beam Test Plans News : Out beam time has been changed from Sep 1 st – 26 th To Sep 3 rd – 29 th due to a schedule of safety review people. Some experts will kindly help us. Alex Kaplan (from DESY AHCAL, while period) Uwe Cornett (engineer from DESY, Sep 20-26th) Vishnu Zutshi (can give help from NIU)

Very Tentative Run plan 0. Commissioning run with muon and electron beams. (~7 days) 1.MIP calibration with muon beam. (3 days) – Events are triggered by 10x10 cm muon counter. – Inject 100k 30 GeV in each strip. 2.Precise MIP scan on one strip.(2 days) 3.Energy scan with electron beam. (5 days) – 1, 2,4,8,16,32 (+ higher if possible) GeV, 250k events at each beam energy. – Both in uniform and non-uniform regions. 4.Energy scan with pion beam. (2 days) – 1, 2,4,8,16,32,60 GeV, 250k events at each energy. – Central region only?

Very Tentative Run plan 5. Angular scan with electron beam. (4 days) – At 10, 20, 30 degrees. – 2,4,8,16,32 GeV, ~250k Events at each energy. 6. Angular scan with pion beam? (3 days) 7. Pi0 run (? days) – Put target on upstream, perform energy scan with pion beam. ~ 26 days in total without pion run. Other runs : Daily noise, LED runs during beam-off time Response curve measurement after finishing the beam period.

 0 run Target should be put at 280cm upstream from the ECAL surface (=CAL inner radius with GLD-prime detector). On beamline, drift chamber support frame is located at that point. Target will be ~6cm Iron? How many events we will collect at which energy?  + or  - for secondary beam ? Is it really possible to reconstruct the  0 even in low energy region? Simulation study is indispensable to make the run plan, but time is quite limited. Need more extensive study to make  0 run plan. Otherwise should we just make it as an optional plan? Or expect 4 th beam time in next year?

 0 run The iron target should be put here In drift chamber frame

Shift plan During Sep 1th-26 th, we will arrange 2 shifts per a day, 7-9 hours for each shift. 1-3 people for a shift from the ScECAL group. Shifters are responsible to : – Follow run plan given by run coordinator – contact accelerator control to request desired beam. – Running DAQ and checking data with online monitor – Monitor detector status – Logging everything into e-log – Report any news or problems to experts immediately.

Data flow, Analysis Very quick analysis is done by online display. Raw data files are buffered on RAID disk at MT6, and transferred to GRID disks at DESY and LLAL. After the copy, raw data are converted to LCIO on GRID. -> Need to have the GRID account to access to the lcio data. Data size : 50~60 kB/event -> GB for 250k events. -> 1-2 TB for whole DAQ program? For a quick analysis, we will create simple root ntuples from those raw or lcio data. During the data taking, everyone must be involved to the analysis with the simple ntuples on analysis PC. (need to setup analysis environment on the analysis PC.)

Radioactive source It will not be easy to borrow it at FNAL, since we need: – Special request to borrow, – Arrangement of delivery, – Additional training and exam to handle. So far no rad. source is used for the CALICE beam test. Hopefully we would NOT like to use the rad. source at FNAL. -> Dead channel check have to be done in Japan. Or should we prepare to borrow it anyway?

Participants / period AugustSeptember Satoru Uozumi Katsushige Kotera Adil Kahn Miho Nishiyama Takayuki Sakuma Yuji Sudo Toshinori Ikuno Yusuke Takahashi Daniel Jeans ? Tohru Takeshita ? Kiyotomo Kawagoe Donghee Kim Daejung Kong ? Some of us are trying to change returning flight to Oct-3.

Getting Fermi-ID and Trainings First fill web form to have Fermi-ID number. (if you already have the ID number, you still need to renew it from the same page.) PLEASE DO IT ASAP, if you have not yet done it! After having the ID-number, you have to take an orientation training > Training Materials -> New Employee Orientation and then follow instructions. There is an online test. You have to get 35 / 40 points to pass. Also finish GERT training from -> type your ID and select “Visitor”, chose “Safety Training”, go next page, and click “GERT”. Also there is an online test with 10 questions. Finish those online tests before you visit to FNAL.

Getting Fermi-ID and Trainings (2) After your arrival to FNAL, you will go to users office (wilson hall first floor) and submit Fermi-ID request form and medical insurance form. MEDICAL INSURANCE COVERAGE IS REQUIRED TO HAVE THE FERMI-ID! PLEASE MAKE SURE YOU ARE COVERED FOR ANY INJURIES DURING THE BEAM TEST! Then you have to take Rad-worker training on Aug-19 th morning. It includes instruction class and challenge exam (need 32 points / 40 questions to pass) After finishing the rad-worker training, you also need to take controlled access training. (10 questions) Prepare for the exams, do not fail ! After finishing those trainings you can finally get TLD badge.

Some more things to do If you have a laptop, please bring it to FNAL. There is no public terminal you can use on beamline. Both wired and wireless network are available at FNAL. All the computer have to be kerberized. You need to install kerberos client on your machine to log-on to analysis PC. If sshd is running on your machine, you must stop it. Please get GRID account as much as possible. Sooner or later GRID access is necessary for later data analysis.