General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/2013 1.

Slides:



Advertisements
Similar presentations
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Garching, 10 Nov.2006TW6-TSS-SEA 2.1 I. CristescuSlide1 HVT-TLK FZK - EURATOM ASSOCIATION Occupational.
Advertisements

Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Heating, Ventilating, and Air-Conditioning
RUSSIAN ACADEMY OF SCIENCES PROGRAM SYSTEMS INSTITUTE Optimal Control of Temperature Fields for Cooling of Supercomputer Facilities and Clusters and Energy.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
Prepared by Farid Khalaf.  Protect the worker.  Protect the sample being analyzed.  Protect the environment.
Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Luisa Ulrici and Luca Bruno, on behalf of DGS/RP
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
VACUUM PROCESS INNOVATIONS SINCE 1939 Updated to November 09 Times for new rules in vacuum drying.
Radiation Protection lessons Experiences with operating beams for Neutrino experiments H. Vincke, CERN July 4, 20081Nufact’08, Valencia, Spain.
NFPA 31 Standard for the installation of Oil- Burning Equipment
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
© 2009 Michigan State University licensed under CC-BY-SA, original at Water Quality.
Radiation Protection and Licensing K. Vaziri, FNAL Radiation Physics Team Proton Accelerators for Science and Innovation Workshop High Power Targets and.
Module 1, Part 3: Process validation Slide 1 of 22 © WHO – EDM – 12/2001 Validation Part 3: Process validation Supplementary Training Modules on Good Manufacturing.
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
HOW THE DUMP RESISTOR’S TANK LOOKS LIKE COOLING OF THE LHC ENERGY EXTRACTION RESISTORS G. Peón (ST/CV), K. Dahlerup-Petersen, G. Coelingh (AT/MEL) Air.
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
CNGS operation and environmental issues F. Malacrida, T. Schmittler, P. Vojtyla, H. Vincke 1.
CENF secondary beam study group 1 st meeting - 7 th May 2013 M. Calviani (EN/STI)
GENERAL ACCEPTANCE CRITERIA FOR CERN RADIOACTIVE WASTE RSOC 6 March 2015 EDMS L. Ulrici - for DGS-RP group.
Radiation Protection during design, operation and dismantling of target areas Thomas Otto based on material from RP group.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
We can…. 2 GLOBAL REFERENCES Rev: 00 References :
Secondary beam production facility layout discussions SBLNF meeting 5 th Dec M. Calviani, A. Ferrari, R. Losito (EN/STI) H. Vincke (DGS/RP)
Radiation Protection info update C. Adorisio (DGS/RP) 17 th LTEX Meeting
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Session 2 of ATC/ABOC Days 2008 Doris Forkel-Wirth, SC-RP Pierre Bonnal, AB-SU 1.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Status Report by the n_TOF Technical Coordinator P. Cennini AB-ATB on behalf of the n_TOF Team  The n_TOF Facility  Where are we standing  Resume of.
HL-LHC Standards and Best Practices Workshop CERN, June 13, 2014 Best Practices for ALARA C. Adorisio and S. Roesler on behalf of DGS-RP.
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Installation of the T600 at Fermilab CSN2, September 22,
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
Status of AWAKE Installation and Integration Presented 9/3/2016 at the AWAKE Collaboration Meeting Ans Pardons, for the AWAKE CP4 team.
N-TOF review HVAC and cooling systems Proposal to be validated by the project CERN TS/CV 13th February 2008.
How to access CNGS Heinz Vincke for DG-SCR-SL RADWG3/4/
CENF target station and secondary beam design M. Calviani (CERN) on behalf of the CENF Secondary Beam Working Group ICFA Neutrino European Meeting – 8-10.
CENF target station and secondary beam design M. Calviani (CERN) on behalf of the CENF Secondary Beam Working Group CENF/LBNE meeting – 5 th February.
LBNE Target Pile & Decay Pipe Cooling Andy Stefanik and Ang Lee – Fermilab September 25, 2014.
Task # 3 Task # kW Target Station Layout proposal Presented by L.Bruno CERN AB Experimental Areas, Targets and Secondary Beams Group.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Update on the PSB Cooling and Ventilation Systems
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Installation of the T600 at Fermilab
The n_TOF Facility Today
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Session Name: Lessons Learned from Mega Projects
EURO Conclusions from Cracow meeting
RSFs & categorisation 20 May, 2019.
Mikael Olsson Control Engineer
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/2013 1

Legislation Rules are defined in CERNs radiation protection legislation (Safety code F and underlying rules) 2

General guidelines - I ALARA (optimization) starts already at the design phase Use ‘correct/good’ materials... ActiWiz, material catalogue EDMS # Material impurities can dominate the activation. Perform “core sampling” and a chemical analysis of the soil before construction. Material impurities can dominate the activation, especially after long cooling times. Avoid construction of a facility in ‘wet’ areas or minimize the infiltration of water as much as possible (“geomembrane”)... a hydrological study shall be performed Shielding must not only satisfy limits but must also be optimized (ALARA) Install only absolute necessary equipment in ‘hot’ areas Use only radiation hard and reliable equipment in ‘hot’ areas Redundancy function for ‘delicate’ items; for example for the water cooling circuits for horn and reflector 3

General guidelines - II Use dry air – install an air dehumidifier which reduces the problem of corrosion. Use dry air in cooling room & above He- vessel Minimize air volumes in ‘hot’ areas or even better use an He environment or best a vacuum environment. Clear separation of ‘air’ in target area, adjacent areas and the outside; ‘air’ tightness is - besides pressure difference - a key element. ‘Air’ pressure has to be lowest in the area with the highest radiological risk, higher in adjacent areas and highest outside the facility. Use a closed ventilation circuit with HEPA filters for ‘air’ inside target chase area... a small air release (leak mode) during operation seems possible in case of CENF in order to create an under pressure wrt. adjacent areas. This would be almost impossible if we use air insight the target area !! 4

General guidelines - III Closed cooling circuits for ‘hot’ elements (like target, horn etc.).. heat exchanger, double-wall pipes for primary circuits. Avoid sumps and air conditioning units in areas with high concentration of tritium. Foresee an evaporator (to eliminate tritiated water)as part of the installation Failure of target, horn occurs more often than expected. However, what fails are items like water lines, ceramic isolators, pumps and not the main, expensive device … have spare parts ready. Remote handling/maintenance/repair is a must for equipment in the target chase... residual dose rate is too high for manual interventions Prepare for decommissioning and dismantling already now … 5