Permitting Threshold/Permit Type Workgroup Issue: Currently all districts issue different types of permits. CUPcon Goals: Create a common permitting framework.

Slides:



Advertisements
Similar presentations
Stakeholder Workshop July 27, Present updated information on the Central Groundwater Storage Plan Receive additional stakeholder input Discuss next.
Advertisements

Southwest Florida Water Management District Rule Development Workshop Water Use Permitting August 22, 2013.
Recommendations for a Statewide Water Plan By: Ewan Hadgraft Alabama Rivers Alliance Birmingham-Southern College.
Water Demands for Mining Richard Lowerre Adapted from presentation to Texas Groundwater Summit September 2013.
Southwest Florida Water Management District Rule Development Workshop Water Use Permitting May 2013.
Basic Assumptions Facilities managing MSW must go through Site Assignment Materials that are pre-sorted are not considered MSW Residuals remaining after.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Zoning Ordinance Update Planning Commission February 25, 2015.
COMPLIANCE MONITORING. Issues Identified by Stakeholders Inconsistent reporting requirements among Districts Level of monitoring inconsistent with potential.
1 Proposed Rule to Protect Food Against Intentional Adulteration
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
Water Use Demands Different approaches taken by Districts in determining reasonable-beneficial demands when assigning permit allocations. Two primary stakeholder.
The Compact  Legally enforceable contract among the Great Lakes States  Provided for in the U.S. Constitution  Ratification by State legislatures 
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
St. Johns River Water Supply Impact Study by Getachew Belaineh Ph. D., P.H. 1 Brian McGurk P.G. 1 Louis Motz Ph. D., P.E 2 Follow up Review meeting March,
Proposed Rule to Protect Food Against Intentional Adulteration 1.
Area of Notice Bannock Creek Drainage All surface and ground water rights in drainage Approximately 80 – 90 notices sent.
Permit Implementation Regulations (AB 1497) Package Update Key Issues 1. Significant Change and Modified Permit Process 2. Public Noticing and Hearing.
ETF – O IL AND G AS T RACT, M AY 5, 2015 GROUNDWATER AUTHORITY AND REQUIREMENTS.
HEA 1005 Graduation Waiver Remediation Plan Requirement 1 Update: June 4, 2014.
Sole Source Contracts for Administrative Hearing Southeast Water Supply Augmentation Project Presented to: Orange County Board of County Commissioners.
Rule 62-40, F.A.C. – What is it? The Water Resource Implementation Rule (State Water Policy). Required by Sec , F.S. Goals, objectives and guidance.
Colorado’s Groundwater Protection Program Monitoring and Protecting Groundwater During Oil and Gas Development Natural Resources Law Center Intermountain.
CENTRAL FLORIDA COORDINATION AREA Central Florida Water Initiative Central Florida Water Initiative Regional Water Supply Plan Bill Graf Intergovernmental.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
Telecommunications Law 1. 2 Summary of Proposed Amendments To Scarsdale Zoning Code PRESENTED BY: Joseph Van Eaton.
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
Robert Beltran, P.E., BCEE Assistant Executive Director.
Antidegradation Standards and Implementation Procedures Overview of Third Notice Comments and Responses March 14,
Planning and Community Development Department Housing Element City Council February 03, 2014.
2014 IRWM Drought Grants Sierra Water Workgroup Summit June Tracie L. Billington Department of Water Resources Financial Assistance Branch.
HEA 1738 IC as amended Water Resource Allocation and Distribution in Indiana IDNR Division of Water.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Water Demands in the Jackson Blue Spring Basin.
Interdistrict Transfers of Water and Local Sources First Land Resources and Regulatory Committee November 3, 2005 Land Resources and Regulatory Committee.
Central Florida Coordination Area South Florida, St. Johns River and Southwest Florida Water Management Districts.
CFO and CAFO Regulatory Issues IN Pork Producers January 30, 2007.
Department of Water Resources Sacramento, CA October 11, 2010.
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
Regional Water Availability Rulemaking Chip Merriam Water Resources Advisory Commission February 8, 2007 Chip Merriam Water Resources Advisory Commission.
1 Water Resources Management - DEQ’s Role in Water Supply - State Water Commission October 1, 2002.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Jamie Doucett MassDEP. What Problems Are We Solving? Current regulations are inadequate to address technologies other than recycling and composting Are.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Water Supply Orange County Presented by Kirby B. Green Executive Director St. Johns River Water Management District January 27, 2009.
St. Johns River Water Management District Central Florida Water Initiative Water Supply Plan Mike Register, P.E., Director Division of Water Supply Planning.
NYS Department of Environmental Conservation Flow Standard Amendment to New York’s Water Quality Standards Regulations Scott J. Stoner Chief, Standards.
SB 536 Study and Report WateReuse Florida November 9, 2015 Janet G. Llewellyn Office of Water Policy Florida Department of Environmental Protection.
1 1 CEQA Scoping Naomi Feger Planning TMDL Section Leader Region 2.
FDA Preventive Control Regulation Ernest Julian, Ph.D., Chief Office of Food Protection RI Department of Health AFDO 2014.
Water Reservation for Caloosahatchee Estuary April 16, 2010 Caloosahatchee Estuary Reservation Team Everglades Restoration and Capital Projects Office.
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #5 July 15 – September 15.
Proposed Interim Guidance – Small Starts. 2 Purpose Before Final Rule, evaluate and rate projects to: Advance projects into project development Provide.
PROPOSED BRUNSWICK COUNTY INTERBASIN TRANSFER PETITION REQUEST NOVEMBER 14, 2013.
HEA 1005 Graduation Waiver Remediation Plan Requirement 1.
CEQA 101  CA Legislature passed CEQA in 1970; signed by Governor Reagan  CEQA statutes are found in Public Resources Code sections et seq.  The.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
Chapter 15, Amended Article X Wetland Conservation Areas Presented by the Orange County Environmental Protection Division February 5, 2008 Presented by.
Welcome to the Permit Implementation Regulations (AB 1497) Workshop.
Water & Wastewater Capacity Charge Work Shop
Regional Water Supply Plan Team
Florida and Reclaimed Water
Solid Waste Handling Standards
Water Supply Planning in the St
North Carolina Division of Water Resources
2013 CCPCUA Assessment Central Coastal Plain Capacity Use Area
Presentation transcript:

Permitting Threshold/Permit Type Workgroup Issue: Currently all districts issue different types of permits. CUPcon Goals: Create a common permitting framework in each WMD, link the potential for harm with the permit threshold or level of permit review.

Statutory Considerations Factors considered during development of proposed permitting framework: Section , F.S. allows for establishing a general permit system. Sections and , F.S., allows the governing board to consider applications for proposed uses that are less than 100,000 gpd without a hearing.

Minor Water Use Permit By Rule Noticed General Permit General Permit Small General Permit Minor General Permit Individual Permit No Notice Permit by Rule Exemption Major General Permit ? ? ? Standard General Permit

Minor Water Use Permit By Rule Noticed General Permit General Permit Small General Permit Minor General Permit Individual Permit No Notice Permit by Rule Exemption Major General Permit Standard General Permit Individual Permit No Notice General Permit

DRAFT Common Permitting Framework in Each District No Notice General Permits Average Daily Rate withdrawn is less than 100,000 gallons per day, Combined capacity < 1 million gallons per day, Groundwater well size less than 8” diameter, Cumulative outside diameter of surface water withdrawal pipes is less than 6” diameter, Consistent with requirements of any applicable mandatory reuse zones, For projects located within any of the defined resource limited areas, the project must not exceed any of the specific thresholds for the resource limited area, and Otherwise meets all conditions of issuance as identified in 40x-2.301, FAC. Individual Permit – if proposed withdrawal does not meet above criteria. Each Governing Board determines which individual permits will require Board action.

How were Permit Thresholds Determined? Each Water Management District Conducted the Following Analysis: 1.Analyzed the distribution of existing permits. 2.Identified areas that have significant resource issues that limit withdrawals. 3.Analyzed the distribution of permits under the proposed permitting framework.

Analyze the Distribution of Existing PWS and Ag Permits - SRWMD Approximately 9% of water allocated in 68% of permits Amount of Water Allocated by Range Number of Permits by Range Permits with an allocation <100,000 gallons per day (excludes dewatering) Permits with an allocation ≥ 100,000 gallons per day (excludes dewatering) 91% (301 mgd) 9% (31 mgd) 68% (1402 permits) 32% (667 permits)

Identification of Resource Limited Areas Each WMD: Identified areas that have significant resource issues that limit withdrawals and require further analysis and review. The resource limited areas may or may not coincide with an existing designation that limits withdrawals (e.g.Water Use Caution Areas). This designation only used to determine the type of permit required.

SRWMD Identification of Resource Limited Areas

SRWMD Final Analysis – Distribution of Permits Based Upon Proposed Permitting Framework Amount of Water Allocated by RangeNumber of Permits by Range No-Notice General Permit by Rule Individual Permit 97% (972 mgd) 3% (28 mgd) 46% (1277 permits) 54% (1500 permits)

Statewide Summary: Distribution of No Notice General Permits and Water Allocated Under Proposed Permit Framework Water Management District Permits Currently Required but Would Qualify for No Notice General Permit Permits Quantity of Water Currently Allocated Total Number% of TotalTotal Quantity (mgd) % of Total Quantity Allocated in District NWF SR 1, SJR SF 11, SWF

Next Steps Review comments and stakeholder input received from workshop Make modifications if needed Identify rules that need to be modified Draft rule language and distribute for public review