Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.

Slides:



Advertisements
Similar presentations
ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Advertisements

Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
University Health Building Thesis Final Presentation
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
THE COMMONWEALTH MEDICAL COLLEGE (TCMC) SCRANTON, PAXIAO YE ZHENG | STRUCTURAL OPTIONSENIOR THESIS 2013 ADVISOR: HEATHER SUSTERSIC.
Reading Structural Drawings
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Duquesne University Forbes Expansion
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
1.  S.T.E.P.S.: Science, Technology, Environment, and Policy Building  Education, laboratory, and research  Owner: Lehigh University  Location: Bethlehem,
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Traci Peterson Structural Option Senior Thesis Presentation The Del Monte Center at The North Shore The Pennsylvania State University Department of Architectural.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Swedish American Hospital Heart and Vascular Center Philip Frederick Structural Option AE Senior Thesis 15 April 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Structural Systems Design for a Laramie Office Building
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
CONDOMINIUM TOWER & PARKING
Introduction James W. & Frances G. McGlothlin Medical Education Center
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Project: 250 West Street, Columbus, Ohio
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion OverviewProject Site › Business/Office Space › 85,075 SF › Top of Parapet: 74’-5” › March 2012 – April 2013 › $11 Million › Design-Bid-Build

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Project TeamProject Site › Architectural Partnership - Elliott + Assoc. Architects › Architect of Record - Silling Assoc., Inc. › General Contractor - High Construction Co. › Structural/MEP/Civil - Larson Design Group

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Plan LayoutElevations

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Existing StructureFoundation Plan › Foundations - Spread, Combined and Strip

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Existing StructureTypical Framing Plan › Foundations - Spread, Combined and Strip › Framing - 4” NWC on Composite Deck on Open Web Steel Joists - Wide Flange Beams and Columns

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Existing StructureBracing Details › Foundations - Spread, Combined and Strip › Framing - 4” NWC on Composite Deck on Open Web Steel Joists - Wide Flange Beams and Columns › Lateral System - 16 “K” Braced Frames

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Depth Study BackgroundProposal › Bracing not Fully Triangulated › Bending Moments in Columns › Effectively Act as Moment Frames › Replace Braced with Moment Frames › Design Frame Members for Drift and Check for Strength Requirements › Design/Detail FR Moment Connections

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Breadth Studies BackgroundProposal › No Braces Above/Below Windows › Options for Façade › Opportunity to Open Building Up › Enclosure Redesign › Analyze Barrier Performance › Assess Mechanical Loads and Systems Impact

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Preliminary Drift ConsiderationsServiceability Wind Loading › Potentially Very Flexible System › Pinned Column Bases › H/500 Drift Limit › 10-year vs. 700-year MRI Wind Speeds › Force Multiplier: - (76mph/115mph) 2 =0.44 › D + 0.5L W

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Existing Braced Frame LayoutProposed Moment Frame Layout

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion ETABS Braced Frames ModelETABS Moment Frames Model

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion E-W Frames at Grids 1 and 10N-S Frames at Grids A and K

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Member Strength AssessmentSecond-Order Analysis › Building Periods Shortened: › 22% Increase in Seismic Base Shear › Wind Still Controls Lateral › Direct Analysis Method in ETABS › Iterative Based on P-  Combo: - 1.2D + 0.5L + 0.5S › 20% Stiffness Reduction ›  2nd /  1st < 1.7

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Moment Connection Design Column Stiffening Checks › FR Bolted Flange-Plated Connections › Bolted Single-Plate Shear Tabs › Several Critical/Representative Joints Selected for Design and Detailing › Local Flange Bending › Local Web Yielding › Local Web Crippling › Panel Zone Shear Yielding

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Typical Connection Details J-1 at Level 2

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Typical Connection Details K-4 at Level 2

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Building Enclosure Redesign View of Southern Facade › Replace IMPs with All-Glazed Curtain Wall System › Analyze Barrier Performance › Assess Impact on Mechanical Loads and Equipment

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Enclosure System Selection View of Southern Facade › Compared Kawneer Trifab VG 451T, Kawneer 1600 Wall System 1 and Others › Selected Kawneer 1600 Wall System 1 with 1” Vision and Spandrel IGUs:

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion System Layout/Configuration Glazing Layout › Kawneer 1600 Spans 13’-4” b/w Floor Elevations in Original Layout › C&C Corner Zone Max Pressure: -42.7psf › 2’-8” OC Max Vertical Aluminum Mullion Spacing › 18” Wide Vertical Spandrel Strips at Grids Conceal Columns Beyond › 3’-0” Tall Horizontal Spandrel Strips Hide Floor System and Large MF Beams › Rows of SunGlass Tinted Vision Glass Extend Vertically 10’-4” from Floors

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Existing Front Facade Proposed Enclosure Layout

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Enclosure Thermal Performance Wall Section at IMP › Kingspan 400 V-Wave IMPs Wall Section - R T : 26.3 hr-ft 2 -°F/Btu › Kawneer 451T - Vision Glass Wall Section - R T : 3.85 hr-ft 2 -°F/Btu

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Enclosure Thermal Performance Wall Section at Spandrel Glass › Kawneer 1600 – Spandrel Glass Wall Section- R T : 17.9 hr-ft 2 -°F/Btu › Kawneer 1600 – Vision Glass Wall Section - R T : 3.35 hr-ft 2 -°F/Btu

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Enclosure Areas Mechanical Systems Impact › Existing: - IMPs: 23,649 SF - 451T: 19,175 SF Spandrel: 3,457 SF Vision: 3,355 SF › Proposed: Vision: 38,276 SF Spandrel: 11,359 SF › 70% Increase in Conductive Enclosure and Solar Loads › Ton Condensing Units with 174 Tons of Demand › Existing Enclosure Portion of Total Load is 55% › Redesign Causes 40% Increase in Total Demand

Office Building › Building Introduction › Structural Overview › Proposal › Structural Depth › Breadth Studies › Conclusion Structural Depth Study Enclosure Breadth Studies › Additional Steel Frame Weight: 168,000 lbs › $61,000 Added to Cost of Lateral System › Potential Cost Saving Opportunities: - Fix Column Bases - Relax Drift Limit - PR vs. FR Moment Connections › 40% Increase in Total Demand Requires an Additional 80 Tons of Capacity › Minimum Additional Mechanical Equipment Cost of $240,000 › Significant Impact of Redesign on Building’s Mechanical Systems