1 Safety Issues for the n-TOF target Thomas OTTO, Radiation Protection Group, SC-RP, CERN.

Slides:



Advertisements
Similar presentations
International Atomic Energy Agency IX.4.3. Waste management.
Advertisements

Pagina 1 de 3 CEPSA Química QUIMICA Palos de la Frontera Jul 12 th, 2012 CEPSA QUIMICA PALOS DE LA FRONTERA IPPC DEVELOPMENT.
Pentachlorophenol Label Presented By: John Wilkinson, Manager of Penta Task Force.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
GENERAL IDEAS IN AIR POLLUTION CONTROL
National Committee for the Certification of Radiation Protection Officer SAFETY AND WORK PROCEDURE IN SALES OF RADIOACTIVE MATERIAL AND IRRADIATING APPARATUS.
1 WASTE CHARACTERIZATION METHODS S. Vanderperre Belgatom Vanderperre, Belgatom, chapter 7.
© 2009 Michigan State University licensed under CC-BY-SA, original at Facility Environment.
Wednesday, 12/12/2007, FYROM Prevention of Contamination from Mining & Metallurgical Industries in FYROM Strategic Plan for Prevention of Contamination.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
1 Safety Issues for Hg irradiation Experiment siting - Activation of air and components Activity of Hg – unsealed radioactive source Radioactive waste.
Induced Activity Calculations in Support of D&D Activities at SLAC Joachim Vollaire, Radiation Protection Department.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
AL FURAT PETROLEUM CO. NORM MANAGEMENT SYSTEM
Handling of radioactive material and waste M. Magistris and L. Ulrici (DG/SCR)
Luisa Ulrici and Luca Bruno, on behalf of DGS/RP
1 AFPC Norm Decontamination Facility Plant (NDF) 1.Introduction - The passage of produced water through pipe work and plants leads to the built up of Norm.
WORKER SAFETY Radionuclides Web Cast August 4, 2004 Loren W. Setlow Office of Radiation and Indoor Air
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
05/05/2006P.Fassnacht - LEAF1 INB – Status report RPS, RGE: done! Zoning Traceability.
© 2009 Michigan State University licensed under CC-BY-SA, original at Water Quality.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
IAEA International Atomic Energy Agency Radiation Protection Issues in Nuclear Installations (NPP & RR) Laszlo Sagi Radiation Safety and Monitoring Section.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
What need to be done to restart n_TOF (in 2007?) 4 Short description of the Facility 4 Old Target removal in the provisional Storage place (Service Gallery).
RESPIRATOR REFERENCES
1 Safety Issues for HIE-ISOLDE and nTOF-Ph2 Thomas OTTO, Radiation Protection Group, SC-RP, CERN.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
GENERAL ACCEPTANCE CRITERIA FOR CERN RADIOACTIVE WASTE RSOC 6 March 2015 EDMS L. Ulrici - for DGS-RP group.
Radiation Protection during design, operation and dismantling of target areas Thomas Otto based on material from RP group.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Management System Part II: Inventory of Radiation Sources – Regulatory Authority Information System (RAIS)
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Technical Services.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Containment and.
New SPS scraping system: preliminary RP remarks Helmut Vincke DGS-RP.
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
Characterization of the nTOF Radioactive Waste M. Brugger, P. Cennini, A. Ferrari, V. Vlachoudis CERN AB/ATB/EET.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
Mu2e Target Hall Remote Handling - Contamination Control, Schedule, Risk & Conclusions Ryan Schultz Deputy L3 Manager Target Station 11/17/2015.
DRAFT REGULATIONS ON END-OF-LIFE VEHICLES Public Consultation Waste Management Unit Malta Environment & Planning Authority (MEPA) End-of-Life Vehicles.
BY FRANS WILBRINK WILBRINK & ASSOCIATES. OUTLINE Classify the different types of hazardous areas Identify the risks associated with each of these areas.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
RECOVERED and RECYCLED ODS Sh.Enkhamgalan (Ph.D) MUST. (HCFC) ХӨРГӨХ БОДИСЫН МЕНЕЖМЕНТИЙН ХӨТӨЛБӨРИЙГ МОНГОЛ УЛСАД ХЭРЭГЖИЛТИЙН ЭХЛЭЛИЙН УУЗАЛТЫН ХӨТӨЛБӨР.
1 PASSIVE DOSIMETER BENCHMARKING. 2 CONTEXT French regulations originally required film to be used as a passive dosimeter. The decision dated 23 rd March.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
Facility Environment 1.
New nTOF target: Design Issues
ENVIRONMENTAL PROTECTION External EHS Expert Panel Workshop
Preliminary Decommissioning Plan for the Canadian Light Source
02:21 Full System Decontamination at the Obrigheim Nuclear Power Plant Prior to Decommissioning Wilhelm Kukla, EnBW Kernkraft GmbH, Obrigheim NPP Christian.
REGULATORY REQUIREMENTS FOR HANDLING RADIOISOTOPE Mohd Abd Wahab Yusof (Dr) Malaysian Nuclear Agency.
The n_TOF Facility Today
SOURCE PROJECTORS FOR INDUSTRIAL GAMMA RADIOGRAPHY IN FRANCE
Safety and Security of Radiation Sources
The role of ALARA in management decisions
Radioactive waste management - status
Welcome To Our Presentation 1. Topic Name Transfer Stations and Transport, Ultimate Disposal Methods 2.
n_TOF Target #3 Baseline Design
Presentation transcript:

1 Safety Issues for the n-TOF target Thomas OTTO, Radiation Protection Group, SC-RP, CERN

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review Installation of n-TOF at CERN The n-TOF spallation target has been installed in a former transfer tunnel between the PS and the West Area. No ventilation nor water retention facilities Radioactive air is moving and escaping uncontrolled Radioactive water spillage can go unhindered into surface waters (environment)

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review n-TOF spallation target Lead target in direct contact with cooling water

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review n-TOF target 2004: observation of activity transfer target -> water Activity concentration of water A >> 100 *L E : must not be released to environment At CERN, no facilities to handle or store large quantities (700 litres) of contaminated water Dose rate measured at ion exchanger

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review Cooling water system The cooling water system is internally contaminated with Pb spallation products (qualitative measurements: dose rate of water pipes and gamma spectrometry of wipe test) A quantitative analysis in the target tank and in a section of pipe is required Options for the cooling water system: No intervention needed if contamination low enough Cleaning with water and weak acid, collection in ion exchanger resins Replace cooling water system

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review Requirement 1: Cladded spallation target Cladded spallation target is required, to prevent radioactive contamination of cooling water. Cladding with aluminum is not favoured (radioactive waste separation, see below) The cooling water circuitry must be inspected for contamination (fixed or mobile) before deciding on its potential re-use

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review N-TOF target dimension approx. one interaction length, no dump Intense hadronic cascade leaving target and shielding Consequence: Air activation Air activation in target area

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review Air activation in target area Aerosol concentration during operation: Estimated annual release: Ventilation must be refitted. Improve atmospheric conditions during operation (temperature, humidity, O 3 ) Improve working conditions after access Account for releases to environment n-TOF (est.)ISOLDE 7 Be300 MBq121 MBq 24 Na100 MBq1.16 MBq Short-lived gases ?? (small)6 TBq Door 203 (40 m f. target) Door Be860 Bq/m 3 27 Bq/m 3 24 Na290 Bq/m 3 4 Bq/m 3

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review Requirement 2: Ventilated Target Area The n-TOF spallation target area must be equipped with a filtered and monitored Ventilation, such as target areas in the PS, SPS and ISOLDE. Study in AB-ATB,TS-CV and SC-IE: Minimize dose to critical group of public Potentially recirculation during operation Monitored release

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review n-TOF Experimental Area As the target area, the experimental area EAR-1 is installed in a former transfer tunnel No ventilation No water management For nuclear fuel cycle related experiments with radioactive targets (actinides, trans-uranium elements) In , exceptional authorisations for detectors with mechanical and thermal resistance similar to “sealed radioactive sources” (ISO 2919) were obtained One of the detectors was loaded in PSI (no appropriate work sector available at CERN) Numerous actinide targets still at CERN: problems with re- expedition to owner EAR 1 in its present form can only receive experiments with inactive targets (astrophysics, nuclear physics)

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review Requirement 3a: Use sealed radioactive sources Wherever possible, sealed radioactive sources with ISO 2919-certification by officially authorised bodies must be used as targets The activity is limited by an auxiliary criterion: dose to the public in case of complete dispersion of the source (fire, sabotage) must not exceed 1 mSv Binding re-exportation arrangements for the sources should be made before they enter CERN

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review Requirement 3b: Work Sector Construction of a work sector for handling unsealed radioactive samples in the experimental area filtered and monitored ventilation, retention of contamination (multiple barriers), decontamination facility, application of work procedures continuous monitoring by radiation protection Examples for work sectors for nuclear fuel-cycle related research at accelerator facilities are available at Synchrotron Light Sources (e.g. ESS, ANKA, SOLEIL)

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review RP-Resources for n-TOF operation Presently available manpower: For ISOLDE, MERIT and n-TOF < 1.5 FTE RP techn. engineers for monitoring 0.2 FTE RP physicist for studies and authorisations Additional manpower required for the n-TOF research programme : 0.5 FTE physicist/ senior engineer for studies and authorisations 0.5 FTE technician/ techn. engineer for monitoring work with potentially dangerous radioactive targets Can be combined with requests in other areas of radiation protection at CERN

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review Summary In case of restart, n-TOF must be equipped with A new, improved, cladded target A target area ventilation system A decision on the reuse of the cooling water system can be taken after measurements have been taken. For experiments with actinides and other radioactive samples Sealed sources (certified by authorised bodies) must be used whenever possible A work sector for handling unsealed sources must be built in the experimental area Additional human resources in RP must be made available

15 Conditioning and Elimination of radioactive waste from n-TOF On behalf of Luisa Ulrici Radiation Protection Group SC-RP

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review nTOF RADIOACTIVE WASTE TARGETS Present (activation + contamination) Future (cladding to avoid contamination of cooling water) Other water (if not suitable for free release in environment) heavy water (limited quantities accepted by PSI) Solid metallic waste (maintenance, upgrade, dismantling etc.)

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review Elimination of old target The old n-TOF target can be eliminated towards a Swiss repository, subject to technical requirements No volatile contamination during transport (Type A container needed, probably single use (lost)) Maximum dose rate at the surface of the waste container 2 mSv/h (shielding must be fitted) Dimensions adapted to fit in the waste conditioning container for at PSI

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review DESIGN OF THE NEXT TARGET Recommendations for the design of the next target: Cladding => minimize contamination of the water in the cooling system If aluminum is chosen for the cladding, the design shall foresee the possibility to remotely dismantle the cladding Knowledge of the chemical composition of all materials used in the target (for the calculation of the nuclide inventory).

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review RESOURCES Studies on nuclide inventory : 2 man months per target Availability of sufficient CPU Organisation of waste elimination: 0.2 FTE

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review COSTS Elimination of Targets Transport container~10kCHF Transport~10kCHF Elimination container (PSI)~7kCHF Elimination feesto be defined (meeting with PSI) Shielding for transportdepends on type, needs etc. Elimination of other waste (pipes, supports, shielding etc.) Transport depends on volumes Elimination103 kCHF/cubic meter N.B. No elimination pathway is currently available for activated and/or contaminated deuterium (quantities above 10 liters)

Thomas Otto & Luisa Ulrici, SC-RP, CERN N-TOF Review CONCLUSION An elimination pathway for the targets of nTOF exists and the disposal can be carried out according to the Host-States regulation The disposal of the old target soon after its removal from the irradiation position has the double advantage of Comply with the legislation requirements Eliminate the need of the construction of a second storage place for the future target The P & M resources needed to perform the disposal will be confirmed after deciding with PSI on exact method of conditioning of the target