CERN plans towards energy efficiency Serge CLAUDET Nov 2014.

Slides:



Advertisements
Similar presentations
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Advertisements

BEE SME Program in Jamnagar Brass Cluster November 19, 2009.
ESS Cooling and Heat Recovery system Thomas Hjern
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
UPS Improvements to Beam Availability at the Australian Synchrotron Light Source Don McGilvery.
IBM Energy & Environment © 2008 IBM Corporation Energy Efficiency in the Data Centre … and beyond Peter Richardson UK Green Marketing Leader.
“Energy Efficiency Guide for Industry in Asia”
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
DESIGN GUIDE FOR GAS CENTRALISED HOT WATER SYSTEMS
Cogeneration.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Energy Management Proposed At KTPS. Objectives for Energy Management Generate energy at lowest possible price Manage energy use at highest energy efficiency.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
LHC HARDWARE COMMISSIONING SAFETY TRAINING DAY S. Claudet (AT-ACR-OP) With great help from G. Lindell (Safety commission) CRYOGENICS.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Preliminary Studies of the Electric Power Distribution for CLIC
CRYOGENICS AND POWERING
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Creating a common understanding on Adverse events information requirements CCC-TI Isabelle Laugier Nov 2 nd 2012.
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Overview of Data Center Energy Use Bill Tschudi, LBNL
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Frithiof Andreas Jensen Notes from: “Green Technologies developed at Research Infrastructures”
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
AT/ECR CRYOGENICS Organisation, Procedures and Communication with TCR Presentation for TCR-ECR-ACR Meeting 2003 by K. Barth.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
First results from the study of the LHC cycle power consumption FCC I&O meeting 24 th June 2015 Davide Bozzini With the contribution of G. Burdet, B. Mouche,
An introduction to Energy aspects at CERN June 2014.
Authors: William Tschudi, Lawrence Berkeley National Lab Stephen Fok, Pacific Gas and Electric Company Stephen Fok, Pacific Gas and Electric Company Presented.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
TE-CRG Activities D. Delikaris, TE-CRG.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
LHC Cryogenics From cool-down to 1st beams Serge Claudet (LHC Cryo OP), On behalf of cryo teams involved.
LHC Cryogenics, equipment & interventions around P3/P7 S. Claudet, “volunteer” for TE_CRG 16 Oct’14.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
Fort Stanwix National Monument Energy Audit Contract
Seminar On Energy Audit Submitted To: Submitted By:
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
CLIC Civil Engineering & Infrastructure Working Group Meeting
Innovative He cycle Francois Millet.
Input to Strategy currently planned
CERN Data Centre ‘Building 513 on the Meyrin Site’
As energy coordinator for CERN Accelerators & Technology
Hollow e- lens, Cryogenic aspects
CLIC: from 380 GeV up to 3 TeV Will also study klystron based machine for initial stage.
CERN Procurement Strategy
COOLING & VENTILATION INFRASTRUCTURE
Why are particle accelerators so inefficient?
Overview & baseline of LS2 and roadmap for CRG
Session Ic “Energy efficiency/recovery/optimization”
Overview of Talks. Report from Parallel Session IIb Energy Management & Procurement at RIs Frank Lehner, DESY.
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

CERN plans towards energy efficiency Serge CLAUDET Nov 2014

SC - 26Nov'142 Content Introduction to Energy at CERN Tendency, few recent cases Perspectives Summary

SC - 26Nov'143 CERN Facilities Technical sites for a series of particle accelerators and detectors 60ies 70ies LEP: 80ies+90ies LHC: 2000…

SC - 26Nov'144 CERN’s Electrical Network (geographical overview) 4 Chamoson (Alpiq) Génissiat (RTE) 130 kV 400 kV Back-up (ADM): 60 MW Nominal (ADM + Accel.): 200 MW Bois-Tollot

SC - 26Nov'145 Orders of magnitude Electric Power: 1’200 GWh –F: 400 kV - Maxi 290 MW (Main feeding line) –CH: 130kV - Maxi 60 MVA (emergency or maintenance) => Majority of this energy ends up as heat, dissipated in low temperature cooling towers (21-31’C) Heating: 90 GWh –Natural gas –(Fuel)

SC - 26Nov'146 CERN (per activity) Typical cycle of 3-4 years up, then 1 year down Breakdown (averaged) per major system for LHC 125 GWh 120 GWh 31 GWh 42 GWh 30 GWh 35 GWh 245 GWh 628 GWh Compiled from yearly EN-EL Energy flyers Recent energy consumption

SC - 26Nov' TWh 1.3 TWh 1.35 TWh1.4 TWh TWh TWh0.8 TWh Possible shift by 1 year to match primary goals ! Period for new energy contract

SC - 26Nov'148 CERN Energy Consumption LEP2 LHC Hi-Lumi LHC Multi-years cycles for LHC Cycles: 9m+3mCycles: 3 or 4 x (11m+1m) + 1yr

SC - 26Nov'149 Content Introduction to Energy at CERN Tendency, few recent cases Perspectives Summary

SC - 26Nov'1410 Energy concerns and line of action Energy efficiency from design stage onwards: –Energy consumption considered in selection and design of lattice and sub-systems: minimised global “capital plus operating” costs –This requires appropriate evaluation: quoting rather than just ideas ! Energy management and awareness: –Foreseen stand-by modes (1min, 1hr, 1wk, 1month) –Operation scenario (seasonal, weekly, daily) Waste heat recovery (to be studied) –At the highest possible temperature for direct use –Two cases identified with serious potential => Getting some of these ideas implemented on few specifically selected on-going activities would be an efficient way to be prepared for the future ! Scientific goals at minimised primary energy consumption CERN wide guideline in preparation for retrofits (with thresholds): - Return below 5 yrs: Potential ! - Between 5 and 12 yrs: Strategic ? - Above 12 yrs: not adapted … Facsimile of energy bill to be prepared and distributed to activity leaders, with invitation for suggestions

SC - 26Nov'1411 Few recent success stories Buildings: –Heat pumps and thermal solar panels (Resto2-B107-B774-SL53) Computer center ( ) –Free cooling and air flow optimisation LHC Cryogenics ( ) –Towards higher availability with less machines in operation, resulting in operation modes with an increased efficiency SPS Beam operation (2014 onwards) –Powering cycles & stand-by modes Initiated by individuals, validated by direct management convinced from potential savings

SC - 26Nov'1412 CERN Computer Center Gain: 5-6 GWh/yr A project along the trend, involving several groups, with obvious results and well prepared for next time

SC - 26Nov' Average Power Consumption [MW] Installed Power: 39.0 MW HWC with 8 cryoplants: 33.5 MW Savings: ≈ 20% w.r.t Installed Power Savings: ≈ 10% w.r.t Installed Power Power consumption for LHC Cryogenics Gain ≈ 40 GWh Gain ≈ 45 GWh Gain ≈ 20 GWh A global effort towards energetic efficiency provided savings of 2 to 3 MCHF per year, but was as well an efficient training for the operation crew contributing to increased availability !

SC - 26Nov'1414 ECO cycles to avoid useless energy ramps (power converters) Estimated gain: 5-7 GWh/yr Set of stand-by & powering modes Intended to be continued: North area (LS2?) and East area (LS3?)

SC - 26Nov'1415 Content Introduction to Energy at CERN Tendency, few recent cases Perspectives Summary - Getting more teams properly focussed - Selection of few significant projects - 3rd Energy Efficiency workshop, Desy-Oct’15 - Support for new accelerator projects

SC - 26Nov'1416 Buildings with highest specific energy Machines & 30MW-range cooling towers Heating needs Nice opportunity to be considered, for instance if/when CERN central heating system to be consolidated/renewed !

SC - 26Nov'1417 Identifying good practices, stimulating new ones 3rd workshop foreseen in October 2015, with Desy as host

SC - 26Nov'1418 Studies for new accelerators CLIC FCC For these large projects with power consumptions slightly larger than the present CERN value, energy efficiency concerns is one of the design criteria

SC - 26Nov'1419 Energy efficiency in research infrastructure: –It is becoming a must (sure for communication, progressively with facts, at the level of 1-3% for recent actions) Energy efficiency should be considered as an engineering parameter, not only as a concept-wish-dream –Safety, Quality assurance are part of our goals and priorities, why not Energy awareness ? –Evaluation, measurements, specific metrix and trends are essentials –Specific actions are being prepared to help for this No future accelerator projects without energy efficiency (more generally sustainability?) as part of the objectives –One should minimise primary energy consumption and (then) heat rejection –Specific selected programs on existing infrastructures is a clever way to get the energy awarness culture as well as proven references. It is visible from outside (communication) and useful for the future ! Summary Once again, congratulations for organising such an event, best wishes !

Spare slides

SC - 26Nov'1421 Infrastructure at LHC technical area Helium storage tanks Cryo compressors Heating and tunnel ventilation Powering sub-station Cooling towers