EM-MSC-100907 MSC staus & plans Commissioning meeting 10-09-2007.

Slides:



Advertisements
Similar presentations
MSC recent activities virgoweek Cascina 4 Dec 2006.
Advertisements

Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
Locking improvements after the end of VSR1 Gabriele Vajente for the Locking Group 14 th ILIAS WG1 meeting Cascina – March 6 th 2008.
Payload design methods versus modeling E. Majorana.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
Suspended Mirror control: Learning through Virgo Experience E. Majorana - I.N.F.N. Pisa Aspen GWAD February 16, 2004.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Use ofSiesta in VIRGO commissioning Lisa Barsotti University of Pisa – INFN Pisa For the Virgo collaboration Caltech, December 19th 2003.
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Virgo Control Noise Reduction
Thoughts on short term improvements for Mirror Suspension Control G.Losurdo - P.Ruggi.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
EM-MSC MSC Columbus’ eggs VW EM-MSC outline EQG  SFR Note Actuation Noise: still under study, a framework of actions is being.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
ILIAS – WG1 Hierarchical suspension control G.Losurdo INFN Firenze.
MSC recent activities Commissioning Cascina 2 Apr 2007.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Experimental tests of SA simulation Irene Fiori – Simulation Workshop – March 18, 2004 Virgo dataSiesta simulation 1. Inertial Damping simulation  test.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
Takanori Sekiguchi External Review Control and tuning of suspension 1 T. Sekiguchi KAGRA 4th External Review.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
MSC - 18 Oct 071 LOW FREQUENCY SEISMIC NOISE: LOCKING AND SENSITIVITY ISSUE Paolo Ruggi noise meeting.
Loïc Rolland LSC-Virgo, Orsay- June 11th Virgo ‘timing’ calibration Loïc Rolland Note: Timing calibration during VSR1 in the Virgo codifier (VIR-028A-08,
ILIAS Geneva 29 March 2007 Virgo suspension control progress E. Majorana INFN Mirror Suspension Control workgroup.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
1 PAY Review Meeting 1 18/3/2009 Piero Rapagnani 18/03/2009.
Virgo+ Commissioning Status. Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics:
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
MSC latest weeks activities V. Dattilo, A. Gennai, D. Huet, E. Majorana, F. Paoletti, D. Passuello, P. Ruggi.
Laser Frequency Stabilization – 2004, May 04 1 Laser Frequency Stabilization François BONDU CNRS – ARTEMIS, Nice VIRGO How it works (Design) Make it work.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Mirror Suspension Control commissioning learning
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
MSC winter, short-term schedule Commissioning meeting Cascina 2 Oct 2006.
The control of the Virgo Superattenuator: present and future Giovanni Losurdo - INFN Firenze/Urbino on behalf of the Virgo Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
MSC recent activities COMM Cascina 5 Feb EM-MSC Commissioning-oriented running activity Operation and interface updates Hardware checkup.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
SAT Plans for System R&D Signal Recycling Construction and A&I Short Suspension Upgrade Roberto Passaquieti Università di Pisa and INFN-Pisa AdV Review.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
MSC, focus on: WI ghost noise. 1 “Recent” history and effect July 11 July 22 Aug 1 Jul 28 Aug 1 The disturbance, with us since Dec , had disappeared.
1 ILIAS WG1 meeting, Hannover The 2 nd modulation frequency project.
Filter #7 control April 18, 2016 –, Cascina Paolo Ruggi.
Automation of the Lock Acquisition of the 3 km Arm Virgo Interferometer F. Carbognani for The Virgo Collaboration ICALEPCS - Geneva 14 October, 2005.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
20/09/2006 EM MSC September /09/2006 EM MSC “activities” (from the web page, by Giovanni) are: - Inertial damping - Local control - Tide control.
Evolution of the Virgo detector: The Virgo+ plans
Status of Virgo GWDAW Dec 13-16
Alignment status & plans
Superattenuator for LF and HF interferometers
MSC report September weekly meeting EM-MSC
Weekly meeting Cascina 9 Jan 2007
Status at the Prague meeting
5/10/2019 MSC briefing Cascina 11-Dec 2006 wwwwwww.
weekly meeting Cascina 28 Nov 2006
Presentation transcript:

EM-MSC MSC staus & plans Commissioning meeting

EM-MSC outline VSR1 status post VSR1

EM-MSC Main features of MSC configuration for VSR1 PRE LC flt roll-off attenuated to improve stability GIPC of NE-WE (Global Inverted Pendulum Control) 4-MARIO lock re-allocation Q-coupling compensation (F7 and MARIO) DURING NI-WI LVDT/ACC : anti-Wind => anti-Sea => anti-Wind(Jun 5) NE-WE V DC position readjusted (1mm) (June 19) BS LC tuning to improve regions with small phase margin (Jul 4) MARIO lock re-allocation on NI-WI OFF (NE,WE only) (Jun 6)  Seism-Free Reconstruction of PR top stage Err Signal (Jul 6) EQG Guardian to disable GIPC in case of EarthQuake (Jul mid) NI-WI re-centring on beam(Jul 12-17)

EM-MSC Essentials of the present MSC during VSR1 GIPC &  SFR (both are partial): to make higher Poc/Acc sensor blending crossover frequency without significant  Seism re-injection. EQG: GIPC does not combine Acc => EQG disables GIPC in case of Earthquakes (coherent for far EQs). But… note: I) summer ! II) sensitivity worse up to 40 times at low frequency ! Control Noise: no evidence of noise significantly limiting present Virgo sensitivity. Compensation of actuator non-linear recoil: for both MARIO and SA

EM-MSC MSC targets before passing to V+ Improving disturbance rejection: I)O-B-O tests to check disturbance entry-points (impact on Horizon). II)Completion of  SFR and GIPC will significantly improve Stormy weather and Earthquake rejection. note: stable ITF operation is required! Actuator Eddy Current limit is reacheable through new CD (new driving strategies?) and easy improvements of Alignment control. note: stable ITF operation is required! Once done: Hardware (mechanical) checks (ALL_TW): during V+ detector integration; standalone MSC Control Noise:

EM-MSC Focus on: improving disturbance rejection

EM-MSC * *0.4348* V1:Sa_NE_F0_xLvdt_50Hz_rms_0.03_ 0.1Hz-0.6*0.4348* V1:Sa_NE_F0_xLvdt_50Hz_rms_0.22_1Hz Heuristic dependence on weather conditions - effects related to the sea more relevant than those due to the wind; - overall coupling is weighted by other parameters of the ITF. Mpc MSC tuning euristic threshold

EM-MSC Learning through misfunctioning… “ghost” disturbance on WI top-stage as a localized wind-like source ( mHz)  rad

EM-MSC Learning through misfunctioning… ITF rms fluctuations with ghost and and quiet weather Small effects: generally the ITF copes even with large corrections due to the ghost

EM-MSC Learning through misfunctioning… “ghost” disturbance on WI top-stage: attempt of extracting thresholded effects. Hardly correlated to such kind of WI-like source: zM ~ 2 V produces some effects on DF, but they are smaller than usual 10% Horizon fluctuations

EM-MSC Learning through misfunctioning… “ghost” disturbance on WI top-stage: attempt of extracting thresholded effects. The result is consistent with real-wind effects Note: only 4 marionette data availabe for wind&no-sea IN VSR1 conditions the wind issue for the suspension system was not crucial. ?

EM-MSC Earthquakes Before middle of July unlock due in most cases (90%) to correction saturation After middle of July unlock due to 12 Hz oscillation (50%) and saturation (50%)  SFR+EQG Saturation events roboustness

EM-MSC Earthquakes/H-drops (6.5-mag EQ) Coherent excitation Sismometric ITF response zCorr Saturation fast recover 4-min H recover instead of min without EQG

EM-MSC Sub-conclusion Partial GIPC (ARMs) Partial  SFR (Central Area) EQG GUARD (patch) higher cross-over f: lower wind noise without  seism inj. Operation strategies involving suspension operation as-a-whole improve disturbance rejection capability. GUARD macros can be effectively used for environmentally-featured configurations to improve and make more roboust the system.

EM-MSC Sub-conclusion GIPC (ARMs)  SFR (Central Area) ENV-TUNED GUARD higher cross-over f: lower wind noise without  seism inj. Operation strategies involving suspension operation as-a-whole improve disturbance rejection capability. GUARD macros can be effectively used for environmentally-featured configurations to improve and make more roboust the system.

EM-MSC GIPC (Global IP Control) +  SFR (  SeismFreeReconstruction) GIPC: zGC is not crucially affected by  Seism (referred to suspended mirror) deduced from GC zCorr  SFR:  Sseism is coherent in the central area and reconstructed signals are free from it. reconstructed by local DSP GC

EM-MSC VSR1-end and pre-Vplus activity

EM-MSC ) 5-30 Sept: commissioning breaks (light actions) Beam centering: H-offset on BS is probably rather large; it should be checked for all the mirrors and it a crucial issue for the VSR1 noise characterization (the campaign started on 05/Sept). Accelerometer recombination test (Input=>End suspension): meant to complete “GIPC” for the cavities (now we use differential position and recombine it with local acceleration => we need EQGuard); very precious data in case of EQ (~1/week) (A. Gennai is arranging the set-up: probably ready by the next mantenance 12/Sept). Note: only crate switch Off-On to allow the installation of two DOL on NI-WI VSBs

EM-MSC ) 1-15 Oct: investigation&characterization 2.1) Detailed measurement of F7-mirror TF aimed to H-reconstruction: TF measurements injecting noise at MARIO and Mirror stages and using ITF readout (one shift). 2.3) GIPC: in-line implementation of complete GIPC. 2.2) tests in quiet environmental conditions: O-B-O noise injections to investigate the likeage of wind and sea disturbance in VSR1 configuration (heuristic formula to predict horizon).

EM-MSC )  Seism-Free-Reconstruction: use of the II S-link to reconstruct BS and PR differential top-stage signals at DSP level (now we use DAD conversion to do  SFR for PR suspension). great relevance for : - suspension configuration during the winter and for the future; - better robusteness during EQ; - new options to improve suspension control (sensor-blending at least); - Virgo paper ….

EM-MSC ) Short TW, IB, Vertical-control: IB V-control implementation should be integrated with AA improvement (done by ISYS and AA people). Time: 1 W. Note: only SW actions. 3.2) Short TW, MC, Vertical-control: V-control and IP tuning involve HW - V-control => one accelerometer out of order - IP is now too rigid because MC payload is light => add mass Time: 1 W+3 days ITF operation check 3.3) F7 sensor noise: investigations (electronics ? …. dedicated tests… ) for V+ we should exploit the availability of F7 control handle Time : ?? 3.4) LC HW mantenance: laser-diode replacements etc… Time : few days 3) 16 Oct-15 Jan08: toward V+

EM-MSC ) NINE-WIWE: IP re-tuning after payload installations required Time : to be defined in the context of V+ detector scheduling 4) Reccommended in V+ detector context

EM-MSC  SFR MicroSeism-free Reconstruction …work again on bad-weather impact reduction WEM

EM-MSC The method: reconstruction of BS and PR zLVDT upon the basis of NI and WI zLvdt consistency check using actual zCorr TH: suspensions in the central BLD are coherently excited by microseism ( Hz) 1) differential Lvdt  seism-free available for BS and PR 2) higher crossover frequency allowed! off-line reconstrucion WEM

EM-MSC Using analogic (DAC/ADC) connection between DSPs: tested PR-NI Test during last-week mantenance break: PR reconstruction Confirms the prediction: test of BS reconstruction soon ? In-line test for PR WEM