Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 29 RAL technical drawings by O.Jamet.

Slides:



Advertisements
Similar presentations
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Advertisements

Stephan Haensel - 7th SiLC Meeting - CERN Combined test beam with LCTPC - an update on present status and schedule S. Haensel 1, T. Bergauer 1, M. Dragicevic.
Tachometers – An Overview
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No July 2011 Oxford technical drawings by.
CM-18 June The Measurement and Monitoring of the Field from the MICE Magnets Michael A Green Lawrence Berkeley Laboratory, Berkeley, USA Frank Filthaut.
MICO167 Status MICE mapper  B-sensors have arrived from NIKHEF  Read-out tested and ok  Pneumatic turning over 5 degrees in one-direction (“re-load”
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
Solenoid Magnetic Field Measurement. MICE solenoid includes 5 coils First solenoid expected at FNAL for magnetic field measurements in April Measurements.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Solenoid Magnetic Field Mapping Paul S Miyagawa University of Manchester Objectives Mapper machine Mapper software Simulation Corrections Fitting Future.
Solenoid Magnetic Field Mapping Paul S Miyagawa University of Manchester Introduction Mapper machine Mapper software - Simulation - Corrections - Fitting.
Vyacheslav Klyukhin, SINP MSU The CMS Magnetic Field Map Aug 7, RDMSV. Klyukhin, SINP MSU1.
Bridge Modules BKK and BKR
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
A mole for warm magnetic and optical measurements of LHC dipoles IMMW XI, Brookhaven National Laboratory, Sept Eleventh.
Schedule meeting May May 2011 THE DIFFUSER 1.Requirements 2.Description 3.Components 4.Trials 5.Schedule.
ATLAS Inner Detector Magnetic Field I am responsible for providing the magnetic field map for the ATLAS Inner Detector.  6m long x 2m diameter cylindrical.
Detector studies, Radiation Simulations, Organization FCC Hadron Detector Meeting July 27 th 2015 W. Riegler.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 28 Absorber Systems & MICE Magnets Session 6 October 2010 technical drawings by.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
H.TauregTechnical Forum June B and T monitoring News on B field mapping B field monitoring Temperature monitoring.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
CM25 Engineering 1 4 Nov 2009 DIFFUSER Carousel (~50kg) Driven by air motors – 3 separate ‘actions’ 1.Carousel rotation 2.“30 degree rotation’’ Transfers.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Magnetic Metrology of SOLEIL Synchrotron S.R. Multipoles IMMW 14, A. Madur Magnetic Metrology of SOLEIL Synchrotron Storage Ring Multipoles A. Dael, P.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
JRA1 PCMAG field mapping Elements of the work: Hall sensors: improvements and production Calibration of Hall sensor cards Mechanical mapping device Installation.
1 Magnetic measurements of the Super-FRS magnets 1 Overview: - Measurement systems for dipoles - requirements - Measurement systems review - Open points.
IMMW15 FNAL USA AUGUST 21-24, 2007 Pneumatic motor Gear system Operation in magnetic field Control Performance The ATLAS pneumatic solenoid mapper F. Bergsma,
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
Performance of B-sensor types EUDET NIKHEF VS F. Bergsma 12/9/2007.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
CNC FEED DRIVES Akhil Krishnan G M.Tech 1. CONTENTS 1.Introduction 2.Requirements of CNC feed drives 3.Servo motor 3.1 Servo drive control 3.2 Components.
CNC FEED DRIVES.
Motors and Actuators -by vvk lalithej.
NEW UPGRADE TO THE APS MAGNETIC FIELD INTEGRAL MEASUREMENT SYSTEM
Phase Feed-Forward Piotr Skowroński (CERN)
Mechanical Design Review February 25, 2008 Université de Montréal
STRAW TRACKER SYSTEM CAD STATUS :
Test Beam Request for the Semi-Digital Hadronic Calorimeter
FCAL R&D towards a prototype of very compact calorimeter
Mechanical Design Review February 25, 2008 Université de Montréal
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
RD51-WG X June test beam experience: useful information for October
MICE CM29 Magnets Summary
Ongoing and to do work M.Lenti.
LumiCal mechanical design, integration with LDC and laser alignment
First of all we will remind some numbers:
Controls & Monitoring in MICE
Magnetic measurements at ambient temperature on the MQXFBP1
Presentation transcript:

Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 29 RAL technical drawings by O.Jamet

Layout Servo motor with encoder Trolley with B-sensors Rails Cradles ¼ pipe of aluminum Tooth belt Service module

supports No support inside magnet independent of magnet shape Layout

Revolving disc step size 5 degree Detachable service module

Motor with reduction gear box Outgoing shaft has encoder Layout

Thickness 10 mm ¼ pipe support for rails and cradles (aluminum pipe of 400 mm Ø, L = 6m, thickness 10 mm is most difficult to find part of bench)

Service module to check calibration of B-sensors If necessary determine small corrections on main terms (Y00, Y10 and angles between probes) detachable

NMR-head Turntable 2-axis B-sensor Service module

Beam axis Disk with 7 B-sensors calibrated at 4.5 Tesla Rails Magnet bore Cradle ¼ pipe of aluminum Tooth belt

5m version for spectrometer solenoids 2m version for focus absorber solenoids. Extension disk to by-pass internal flange AFC Need to measure from both sides 2m version could be used to measure eventually coupling coils Extension disk for AFC dismountable This flange cannot be removed and cannot be surpassed by rail support

B-sensor cardStack of B-sensors in calibrator Passive backplane for B-sensor to carry double-row connector Daisy chain B-sensors Double row flat- cable connector Single-row 10 pin connector SPI-interface Homogeneous field region is small => need high density => single row connector Glass cube with 3 Hall probes frontback F.Bergsma/CERN IMMW1611 thermistor

IMMW15 F.Bergsma mm Calibration done at GHMFL Grenoble M5 max 13 Tesla 5 MW

Mounting of B-sensors

Target support for survey

Measurement grid Disk can be rotated in steps of 5 degree 180 mm sensor has to be removed for this region

Pin holes made by CNC machine

Strategy mechanics: 1 build 5 m version, test precision with laser tracker 2 if precision insufficient add encoder and rack and/or foresee laser tracker during measurements etc 3 build 2 m version DAQ: Build simple read-out for 7 B-sensors Anticipate to have interface outside high field region Accuracy: < 0.5 mm longitudinal +/- 0.5mm radial Theta +/- 1 mrad Bx,By,Bz +/- 2 mT Check in situ with NMR on service module

Status 6 m Alu pipe of 40 cm bore arrived, segment cut, principle seems to work Cradles: designed, will be produced outside CERN, rectified inside CERN Rails: ordered, will arrive in one month Chariot: designed, must be build Motion: standard BALDOR motion controller, drive and motor (available) Maybe encoder on rack (unlikely), encoder exist, rack must be ordered B-sensors ready and calibrated Read-out: basics exist ( used in calibrator with 4 cards), parts exist duplicate electronics board Ready at August 2011 for AFC (small version) should be send to CERN !

Spare slides